请输入您要查询的百科知识:

 

词条 Rice Solar Energy Project
释义

  1. Description

     Details  Indefinite hold 

  2. See also

  3. References

  4. External links

{{Infobox power station
| name = Rice Solar Energy Project
| name_official =
| image =
| image_caption =
| image_alt =
| coordinates = {{coord|34|4|0|N|114|48|30|W|type:landmark|display=inline,title}}
| country = United States
| location = Riverside County, California
| status = P
| construction_began =
| commissioned =
| decommissioned =
| cost = $750 million
| owner =
| operator =
| solar_type = CSP
| solar_csp_technology= T
| solar_csp_collectors=
| solar_cpvt =
| ps_units_manu_model =
| ps_site_area =
| solar_site_resource = 2,598 kWh/m2/yr
| ps_electrical_capacity= 150 MW
| ps_electrical_cap_fac= 34%
| ps_annual_generation= 450 GW·h[1]
| website = www.ricesolarenergy.com
| extra =
}}

The Rice Solar Energy Project was a 150 MW concentrating solar power facility project proposed for Rice Valley in the southern Mojave Desert, within Riverside County in southern California.[1] It was put on indefinite hold in 2014.[2]

Description

Proposed by Rice Solar, a subsidiary of SolarReserve, the thermal power tower facility would have been located on {{convert|1410|acre}} of private land on the site of the former Rice Army Airfield, near the former settlement of Rice.[1]

The project's innovative molten salt storage system was to capture solar energy and deliver power to the grid even after the sun goes down. The facility was "expected to power 68,000 homes, create up to 450 construction jobs, and generate more than $48 million in state and local tax revenue over the first 10 years of operation."[3]

Details

The project was developed by Rice Solar Energy, LLC, a subsidiary of SolarReserve, LLC. The facility would have consisted of about 17,000 heliostats[4] focused onto a central receiver tower with an overall height of {{convert|653|ft}},[5] and an integrated thermal storage system, which uses molten salt, a mixture of sodium nitrate and potassium nitrate, as heat carrier.[6][7] The power plant would have been located on {{convert|1,410|acre}} of private land, with previously disturbed and natural habitat sections.[3]

The project had undergone extensive environmental review and had proposed mitigations for environmental impacts from its construction and operation. SolarReserve was to fund the acquisition and enhancement of {{convert|1522|acre}} to compensate for impacts to desert tortoise habitat on private and public land.[3]

In December 2011, Secretary of the Interior Ken Salazar approved a transmission line, access road and substation on public lands that will connect the Rice project to the power grid in California.[3]

In January 2013, the California Public Utilities Commission (CPUC) approved SolarReserve's amended 25-year power purchase agreement (PPA) with Pacific Gas and Electric (PG&E).[8]

Indefinite hold

As of October 2014, SolarReserve put the Rice Solar Project on "indefinite hold". The reason was the investment tax credit for renewable energy slated to drop from 30 percent to 10 percent at the end of 2016, and only available for projects that are fully online by then."[9]

See also

  • {{C|Solar power in the Mojave Desert}}
{{Portalbar|California|Sustainable development|Renewable energy}}

References

1. ^{{cite web |url = http://www.blytheareachamberofcommerce.com/Notice_Solar_Rice.pdf |archive-url = https://web.archive.org/web/20110708074352/http://www.blytheareachamberofcommerce.com/Notice_Solar_Rice.pdf |dead-url = yes |archive-date = 2011-07-08 |title = Rice Solar Energy Project: Notice of Proposed Power Plant |publisher = California Energy Commission |accessdate = 2010-12-26}}
2. ^The Desert Sun: "Developer puts Rice large-scale solar project on indefinite hold", by Sammy Roth, 3 October 2014 . (accessed 12 June 2016).
3. ^{{cite web |url=http://www.power-eng.com/news/2011/12/1558349848/secretary-salazar-approves-transmission-for-solar-thermal-power-tower-project-in-southern-californ.html |title=Secretary Salazar approves transmission for solar thermal power tower project |author= States News Service |date=12 September 2011 |work=Power Engineering }}
4. ^{{cite web |url= http://www.nrel.gov/csp/solarpaces/project_detail.cfm/projectID=61 |title= Rice Solar Energy Project |date= December 3, 2010 |work= Concentrating Solar Power Projects |publisher= National Renewable Energy Laboratory (NREL), U.S. Department of Energy (DOE) |accessdate= 12 December 2011 }}
5. ^{{cite web |url= http://ricesolarenergy.com/faqs.html |title= Frequently Asked Questions |publisher= Rice Solar |accessdate= 12 December 2011 }}
6. ^{{cite web | url= http://www.energy.ca.gov/sitingcases/ricesolar/index.html | title= Rice Solar Energy Project - Power Plant Licensing Case | publisher= California Energy Commission | accessdate= 2011-12-12}}
7. ^{{cite news | url= http://inhabitat.com/californias-first-molten-salt-solar-energy-project-gets-green-light/ | title= California's First Molten Salt Solar Energy Project Gets Green Light | first = Brit | last = Liggett | work = Inhabitat.com | date= 2010-12-16 | accessdate= 2010-12-26}}
8. ^{{cite press release |url= http://www.prnewswire.com/news-releases/solarreserve-project-receives-unanimous-approval-from-california-public-utilities---energy-storage-cited-as-key-benefit-188728121.html |title= SolarReserve Project Receives Unanimous Approval From California Public Utilities |date= January 28, 2013 |publisher= SolarReserve |accessdate= 31 January 2013 }}
9. ^{{cite |url= http://www.desertsun.com/story/tech/science/energy/2014/10/03/rice-solar-project-blythe/16671507/ |title= Rice large-scale solar project near Blythe all but dead |date= October 3, 2014 |publisher= The Desert Sun |accessdate= 17 January 2016 }}

External links

  • {{cite web

|url = http://www.solarreserve.com/what-we-do/csp-projects/rice-army-airfield/
|title = Rice Solar Energy Project
|date =
|publisher = SolarReserve
|accessdate = 31 January 2013
|deadurl = yes
|archiveurl = https://web.archive.org/web/20130215211749/http://www.solarreserve.com/what-we-do/csp-projects/rice-army-airfield/
|archivedate = 15 February 2013
|df =
}}{{Solar power in the United States}}

5 : Solar power in the Mojave Desert|Proposed buildings and structures in California|Proposed solar power stations in the United States|Buildings and structures in Riverside County, California|Solar power stations in California

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/20 14:33:29