请输入您要查询的百科知识:

 

词条 Southern Ontario Railway
释义

  1. Hagersville Subdivision

  2. Future return of CN

  3. Locomotive Roster

  4. References

  5. External links

{{Infobox rail | gauge={{Track gauge|ussg|allk=on}}
| railroad_name = Southern Ontario Railway
| logo_filename = Southern Ontario Railway Logo.png
| logo_size = 120px
| marks = RLHH[1]
| image = RailAmerica_Southern_Ontario_Railway_SOR_RLK_2211_EMD_GP35M_at_London_ON_2011-05-28.jpg
| image_size = 250px
| image_caption = Southern Ontario Railway #2211 in RailAmerica paint at London, ON in May 2011.
| locale = Southern Ontario
| start_year = 1998
| end_year = Present
| predecessor_line = Canadian National Railway
| length = {{convert|69|mi|km}}
| hq_city = Hamilton, Ontario
| website = {{Official website|http://www.gwrr.com/operations/railroads/north_america/southern_ontario_railway}}
}}{{SOR Hagersville Subdivision}}

The Southern Ontario Railway {{reporting mark|RLHH}}[1] is a shortline railroad in the province of Ontario, owned and operated by Genesee & Wyoming Canada Inc., the Canadian subsidiary of Genesee & Wyoming Inc.. It operates {{convert|69|mi|km}} of track from Brantford to Nanticoke, Ontario.[2] The railroad began operations in 1998, and was acquired by RailAmerica two years later.[3] It has interchanges with the Canadian National Railway at Hamilton via trackage rights, Brantford and Paris, and interchanges with the Canadian Pacific Railway at Hamilton.[2]

On July 23, 2012, Genesee & Wyoming Inc. announced that it intended to purchase RailAmerica in a deal valued at $1.39 billion.[4][5] Approval of the purchase was granted by the U.S. Surface Transportation Board on December 19, 2012.[6]

The railroad's traffic comes mainly from steel, agricultural products, petroleum products, and chemicals. The SOR carries more than 44,000 carloads a year.[2]

Hagersville Subdivision

The SOR Hagersville Subdivision extends from Nanticoke (Mile 0.0) to Simpson (Mile 35.0). Rail movements on this subdivision are governed by the Occupancy Control System of the Canadian

Rail Operating Rules (CROR) and supervised by a rail traffic controller in North Bay, Ontario. The maximum authorized speed on this line is {{convert|30|mph|kph}}. Two or more trains operate daily on the Subdivision. The Hydro Spur (Mile 0.0) extends south off of the Hagersville Subdivision and descends southward to Lake Erie at a 1% grade. An Imperial Oil refinery is located just south and east of Mile 0.0 and an Ontario Hydro facility is located at the southern extremity of the spur (Mile 3.17). Train movements on the spur are governed by CROR Rule 105 and have a maximum authorized speed of 10 mph.[7]

Future return of CN

CN says they are going to take over SOR's Hagersville sub on September 18, 2018. The Hamilton operations will be taken on December 13, 2018

Locomotive Roster

Model Maker Numbers Build Date Remarks
EMD GP38-2 EMD 2081 11-1966 (Rebuilt 2016) Ex. MEC 258
EMD GP38-2 EMD 2111 12-1972 Ex. SOU 5058, NS 5058
GMD GP40-2W GMD 3049 03-1975 Ex. CN 9554
GMD SD40-2 GMD 3403 09-1966 Ex. CP 5516
EMD SD40-2 EMD 3404 12-1970 Ex. PC 6260
EMD GP9 EMD 4001 08-1959 Ex. SP 5872
EMD GP9 EMD 4003 09-1959 Ex. SP 5888

References

1. ^{{cite web|title=AAR Railroad Reporting Marks|url=http://www.railserve.com/aar_railroad_reporting_marks.html|publisher=RailServe|accessdate=2017-02-18}}
2. ^{{cite web|title=Southern Ontario Railway|url=http://www.gwrr.com/operations/railroads/north_america/southern_ontario_railway|publisher=Genesee & Wyoming Canada Inc|accessdate=2014-09-10|date=2014-08-04}}
3. ^{{cite journal|date=June 2010|title=RailAmerica's Empire|journal=Trains Magazine|publisher=Kalmbach Publishing}}
4. ^{{cite news| url=http://www.stltoday.com/business/national-and-international/genesee-wyoming-plans-b-railamerica-deal/article_bc60d90a-f39d-5fa3-bde1-9c3f0ca62ca2.html| title=Genesee & Wyoming to pay $1.39B for RailAmerica| author=Associated Press| date=July 23, 2012| accessdate=July 23, 2012| work=STL Today.com}}{{dead link|date=May 2018 |bot=InternetArchiveBot |fix-attempted=yes }}
5. ^{{cite news| url=http://in.reuters.com/article/2012/07/23/genessewyoming-railamerica-idINL4E8IN4PY20120723| title=UPDATE 4-Genesee & Wyoming to buy RailAmerica for $1.4 billion| work=Reuters| date=July 23, 2012| accessdate=July 23, 2012}}
6. ^Surface Transportation Board, Decision, Case No. 42772, December 19, 2012
7. ^{{cite web|title=RAILWAY INVESTIGATION REPORT R09T0057|url=http://www.tsb.gc.ca/eng/rapports-reports/rail/2009/r09t0057/r09t0057.pdf|publisher=The Transportation Safety Board of Canada (TSB)|accessdate=2014-09-10|date=2010-08-04}}

External links

  • Southern Ontario Railway
{{commonscat-inline}}{{Portal|Railways}}{{Canada railways}}{{Canada class 2}}{{Genesee & Wyoming}}{{Canada-rail-transport-stub}}{{Ontario-transport-stub}}

2 : Ontario railways|RailAmerica

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/22 21:19:21