词条 | Mont Blanc Tunnel |
释义 |
|name = Mont Blanc Tunnel |image = {{Location map |Alps |relief = 1 |label = Mont Blanc Tunnel |lat = 45.854 |long = 6.914 |caption = |float = |background= }} |image_size = |caption = Location in the western Alps of Europe |location = Europe: western Alps |coordinates = {{Coord|45.854|6.914|display=inline, title}} |route = {{BAB-E|25|FR}} RN205 {{BAB-E|25|I}} Traforo T1 {{BAB-E|25}} European route E25 |status = Open 24 hrs/day |start = Chamonix, Haute-Savoie, France |end = Courmayeur, Aosta Valley, Italy |startwork = May 1959 (1946) |opened = 19 July 1965 |close = |owner = |operator = MBT-EEIG, controlled by both ATMB and SITMB |traffic = Automotive |character = Passenger and freight |toll = €44 (one-way), 2017 passenger vehicle over €300 (one-way), three or more axles |vpd = |construction = 1959–1965 (1946) |length = {{convert|11.611|km|abbr=on}} |lanes = 2 |speed = {{convert|50|-|70|kph|abbr=on}} |hielevation = {{convert|1395|m|abbr=on}} center |lowelevation = {{convert|1274|m|abbr=on}} France (NW) |height = {{convert|4.35|m|abbr=on}} |width = {{convert|8.6|m|abbr=on}} |grade = }}{{Refimprove|date=December 2018}} The Mont Blanc Tunnel is a highway tunnel in Europe, under the Mont Blanc mountain in the Alps. It links Chamonix, Haute-Savoie, France with Courmayeur, Aosta Valley, Italy, via European route E25, in particular the motorway from Geneva (A40 of France) to Turin (A5 of Italy). The passageway is one of the major trans-Alpine transport routes, particularly for Italy, which relies on this tunnel for transporting as much as one-third of its freight to northern Europe. It reduces the route from France to Turin by {{convert|50|km|-1|abbr=off}} and to Milan by {{convert|100|km|-1|abbr=on}}. Northeast of Mont Blanc's summit, the tunnel is about {{convert|15|km|-1|abbr=on}} southwest of the tripoint with Switzerland, near Mont Dolent. The agreement between France and Italy on building a tunnel was signed in 1949. Two operating companies were founded, each responsible for one half of the tunnel: the French Autoroutes et tunnel du Mont-Blanc (ATMB), founded on 30 April 1958, and the Italian Società italiana per azioni per il Traforo del Monte Bianco (SITMB), founded on 1 September 1957.[1] Drilling began in 1959 and was completed in 1962; the tunnel was opened to traffic on 19 July 1965. The tunnel is {{convert|11.611|km|abbr=on}} in length, {{convert|8.6|m|abbr=on}} in width, and {{convert|4.35|m|abbr=on}} in height. The passageway is not horizontal, but in a slightly inverted "V", which assists ventilation. The tunnel consists of a single gallery with a two-lane dual direction road. At the time of its construction, it was three times longer than any existing highway tunnel.[2] The tunnel passes almost exactly under the summit of the Aiguille du Midi. At this spot, it lies {{convert|2480|m}} beneath the surface, making it the world's second deepest operational tunnel [3] after the Gotthard Base Tunnel, which is slightly deeper. The Mont Blanc Tunnel was originally managed by the two building companies. Following a fire in 1999 in which 39 people died, which showed how lack of coordination could hamper the safety of the tunnel, all the operations are managed by a single entity: MBT-EEIG, controlled by both ATMB and SITMB together, through a 50–50 shares distribution.[4] An alternative route for road traffic between France to Italy is the Fréjus Road Tunnel. Road traffic grew steadily until 1994, even with the opening of the Fréjus tunnel. Since then, the combined traffic volume of the former has remained roughly constant. Construction statistics
HistoryThe idea of building a tunnel underneath the Mont Blanc to avoid the need for lengthy circumnavigation dates back to the nineteenth century during the heyday of the railway. However, the idea did not receive widespread attention until 1907, when Francesco Farinet, a Member of Parliament of the Aosta Valley, advocated constructing of the tunnel.[5] In 1908, a first design was presented by French engineer Arnold Monod, to much interest from Italian and French politicians.[5] However, due to political turmoil and World War I and World War II, the project did not start until 1959, when excavations on the tunnel officially began.[5] This was preceded by the signing of a national charter for the tunnel construction, ratified by the parliaments of France (1954) and Italy (1957). That same year, the STMB (Société du tunnel du Mont Blanc) was formed, which became ATMB (Autoroutes et Tunnel du Mont Blanc) in 1996.[5] In 1962, the French and Italian drilling teams met on 4 August. The opening was successful, with an axis variation of less than {{convert|13|cm|in|0|abbr=off}}.[6] Three years later the tunnel was inaugurated by the French president, Charles de Gaulle, and the Italian President, Giuseppe Saragat on 16 July 1965. Tunnel opens to traffic on 19 July.[6] Surveillance cameras were installed in 1978.[7] The tunnel underwent extensive modernisation works in 1990, including the addition of safety features such new video surveillance cameras, 8 pressurized emergency shelters, a sprinkler system and other safety maintenance. In 1997, a fire detection system was installed along with centralized safety equipment management, and new variable message signs.[8] 1999: On the morning of 24 March, the engine of a Belgian transport truck caught fire in the tunnel.[1] The event expanded into a catastrophe which cost the lives of 39 people[14] and led to a three-year tunnel closure until 9 March 2002.[9] The reopening followed an extensive overhaul of the safety features.[10] The highway trunk from Aosta to the tunnel on the Italian side was completed in 2007.[11] Mont Blanc Tunnel 1999 fire {{anchor|1999 fire}}On the morning of 24 March 1999, 39 people died[12] when a Belgian transport truck carrying flour and margarine entered the French-side portal and caught fire in the tunnel.[1] After several kilometres, the driver realized something was wrong as cars coming in the opposite direction flashed their headlights at him; a glance in his mirrors showed white smoke coming out from under his cabin. This was not yet a fire emergency; there had been 16 other truck fires in the tunnel over the previous 35 years, always extinguished on the spot by the drivers. At 10:53 CET, the driver of the vehicle, Gilbert Degrave, stopped in the middle of the tunnel to attempt to fight the fire but he was suddenly forced back by flames from his cabin.[1] With Degrave unable to fight the fire, he was forced to flee. At 10:55, the tunnel employees triggered the fire alarm and stopped any further traffic from entering. At this point there were at least 10 cars and vans and 18 trucks in the tunnel that had entered from the French side. A few vehicles from the Italian side passed the Volvo truck without stopping. Some of the cars from the French side managed to turn around in the narrow two-lane tunnel to retreat back to France, but negotiating the road in the dense smoke that had rapidly filled the tunnel quickly made this impossible. The larger trucks did not have the space to turn around, and reversing out was not an option. Most drivers rolled up their windows and waited for rescue. The ventilation system in the tunnel drove toxic smoke back down the tunnel faster than anyone could run to safety. These fumes quickly filled the tunnel and caused vehicle engines to stall because of lack of oxygen. This included fire engines which, once affected, had to be abandoned by the firefighters. Many drivers near the blaze who attempted to leave their cars and seek refuge points were quickly overcome. Within minutes, two fire trucks from Chamonix responded to the unfolding disaster. The fire had melted the wiring and plunged the tunnel into darkness; in the smoke and with abandoned and wrecked vehicles blocking their path, the fire engines were unable to proceed. The fire crews instead abandoned their vehicles and took refuge in two of the emergency fire cubicles (fire-door sealed small rooms set into the walls every 600 metres). As they huddled behind the fire doors, they could hear burning fuel roll down the road surface, causing tires and fuel tanks to explode. They were rescued five hours later from a third fire crew that responded and reached them via a ventilation duct; of the 15 firefighters that had been trapped, 14 were in serious condition and one (their commanding officer) died in the hospital. Some victims escaped to the fire cubicles. The original fire doors on the cubicles were rated to survive for two hours. Some had been upgraded in the 34 years since the tunnel was built to survive for four hours. The fire burned for 53 hours and reached temperatures of {{convert|1000|°C|°F|-1}}, mainly because of the margarine load in the trailer, equivalent to a {{convert|23000|l|adj=on}} oil tanker, which spread to other cargo vehicles nearby that also carried combustible loads. The fire trapped around 40 vehicles in dense and poisonous smoke (containing carbon monoxide and cyanide). Due to weather conditions at the time, airflow through the tunnel was from the Italian side to the French side.[13] Authorities compounded the effect by pumping in further fresh air from the Italian side, feeding the fire and forcing poisonous black smoke through the length of the tunnel. Only vehicles below the fire on the French side of the tunnel were trapped, while cars on the Italian side of the fire were mostly unaffected. There were 27 deaths in vehicles, and 10 more died trying to escape on foot. All the deceased were ultimately reduced to bones and ash. Of the initial 50 people trapped by the fire, 12 survived.[1] It was more than five days before the tunnel cooled sufficiently to start repairs. Pierlucio Tinazzi{{Main|Pierlucio Tinazzi}}{{Disputed section|small=left|date=March 2019}}Pierlucio Tinazzi, an Italian security guard employed by the SITMB, is credited with saving at least 10 of the 12 survivors.[1] Other reports, however, state that Tinazzi was unable to save anyone, although he died trying to do so. [14]He was on the French side at the time emergency services had given up. He donned breathing equipment and drove into the tunnel on his BMW K75 motorcycle. He was in radio contact with the Italian side for over an hour before succumbing to the intense heat. His motorcycle melted into the pavement after he dragged an unconscious truck driver behind a fire door. A commemorative plaque at the Italian entrance honours him.[15] AftermathThe tunnel underwent major changes in the three years it remained closed after the fire.[16] Renovations include computerised detection equipment, extra security bays, a parallel escape shaft and a fire station in the middle of the tunnel complete with double cabbed fire trucks. The safety shafts also have clean air flowing through them via vents. Any people in the security bays now have video contact with the control centre, so they can communicate with the people trapped inside and inform them about what is happening in the tunnel more clearly. A remote site for cargo safety inspection was created on each side: Aosta in Italy and Passy-Le Fayet in France. Here all trucks are inspected well before the tunnel entrance. The same areas are also used as staging areas, to smooth the peaks of commercial traffic. The experience gained from the investigation into the fire was one of the principal factors that led to the creation of the French Land Transport Accident Investigation Bureau.[17] TV documentaries were also made concerning the disaster, all distributed worldwide and focussing on either safety aspects or the circumstances that turned what should have been a serious, but controllable incident into a disaster. The first, Seconds from Disaster – Tunnel Inferno (aired 2004), was a reconstruction of the events leading up to and during the disaster and the conclusions of the investigation that followed. The second, Into the Flames – Fire Underground (aired 2006), revisited the circumstances and showed how new technology in the form of a new type of fire extinguisher could have reduced the scale of the disaster and enabled the fire service to reach and remain in the vicinity to fight the fire. Manslaughter trialIn Grenoble, France, 16 people and companies were tried on 31 January 2005 for manslaughter. Defendants in the trial included:
The cause of the fire is disputed. One account reported it to be a cigarette stub carelessly thrown at the truck, which supposedly entered the engine induction snorkel above the cabin, setting the paper air filter on fire. Others blamed a mechanical or electrical fault, or poor maintenance of the truck's engine. The closest smoke detector was out of order, and French emergency services did not use the same radio frequency as those inside the tunnel. The Italian company responsible for operating the tunnel, SITMB, paid €13.5 million ($17.5 million US) to a fund for the families of the victims. Édouard Balladur, former president of the French company operating the tunnel (from 1968 to 1980), and later Prime Minister of France, underwent a witnesses examination. He was asked about the security measures that he ordered to or did not order to be carried out. Balladur claimed that the catastrophe could be attributed to the fact the tunnel had been divided into two sections operated by two companies (one in France, the other in Italy), which failed to coordinate the situation. On 27 July 2005, thirteen defendants were found guilty, and handed sentences ranging from fines to suspended prison sentences, to six months in jail:
TrafficIn 2010, the average traffic volume was 4,945 vehicles per day, or around 1.80 million vehicles per year. In 2011, there were an average of 5,113 vehicles per day (about 1.87 million vehicles per year). Although several lines of vehicles can queue up at the toll station, only a limited number of vehicles per unit time is allowed to transit the tunnel to ensure a safety distance between them. Within the tunnel, a minimum speed of 50 km/h and a maximum speed of 70 km/h applies, while the prescribed distance between vehicles is 150 m; trucks are allowed to enter in groups of five. These security measures were took as a consequence of the 1999 tunnel fire. Pedestrians can cross the tunnel by bus; bicycles can also be carried through the tunnel with a reservation. TollThe tunnel crossing is subject to a toll; the toll differs from Italy to France because of their different VAT rates. In 2013, the one-way ticket for a car was 40.90 € (41.40 € on the Italian side), while the return ticket, valid for 7 days, was 51 € (51.60 € on the Italian side).[19] In 2016, the one-way ticket for a car cost 43.50 € (44.20 € on the Italian side). See also{{Portal|France|Italy}}
References1. ^1 2 3 4 5 {{cite web|url=https://www.wired.com/thisdayintech/2010/07/0716mont-blanc-tunnel-opens/|title=July 16, 1965: Mont Blanc Tunnel Opens|date=15 July 2010|publisher=Wired|accessdate=16 July 2010}} 2. ^{{cite news|url=https://books.google.com/books?id=wyoDAAAAMBAJ&pg=PA121&dq=popular+science+1930&hl=en&sa=X&ei=RV_9TvnvLI7iggemrO2gAg&ved=0CEMQ6AEwBDhu#v=onepage&q&f=true|title=World's longest auto tunnel to pierce the Alps |magazine=Popular Science |last=Soule |first=Gardner |date=December 1959 |pages=121–123/236–238}} 3. ^{{cite web|url=http://todayinsci.com/7/7_16.htm|title=Today in Science History|accessdate=November 22, 2014}} 4. ^{{cite web|url=http://www.atmb.com/atmb/en/tunnel/100/the-mont-blanc-tunnel/the-tunnel-today/a-french-italian-operator.html |title=Archived copy |accessdate=September 27, 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20120729211317/http://www.atmb.com/atmb/en/tunnel/100/the-mont-blanc-tunnel/the-tunnel-today/a-french-italian-operator.html |archivedate=July 29, 2012 }} 5. ^1 2 3 {{Cite web|url=https://www.tunneltalk.com/Mont-Blanc-Tunnel-Sep11-An-historic-review-46-years-of-operation.php|title=Mont Blanc Tunnel at age 46|website=www.tunneltalk.com|access-date=2018-12-21}} 6. ^1 {{Cite news|url=https://www.wired.com/2010/07/0716mont-blanc-tunnel-opens/|title=July 16, 1965: Mont Blanc Tunnel Opens|last=Barry|first=Keith|date=2010-07-16|work=Wired|access-date=2018-12-21|issn=1059-1028}} 7. ^{{Cite web|url=https://www.atmb.com/en/about-atmb/network/mont-blanc-tunnel-work|title=Our work on the Mont Blanc Tunnel - ATMB|website=www.atmb.com|access-date=2018-12-21}} 8. ^{{cite web |url=http://www.atmb.com/atmb/en/tunnel/26/the-mont-blanc-tunnel/the-history-of-the-tunnel.html |publisher=Autoroutes et Tunnel du Mont Blanc |title=History of the Tunnel |accessdate=December 20, 2013 |deadurl=yes |archiveurl=https://web.archive.org/web/20140104022749/http://www.atmb.com/atmb/en/tunnel/26/the-mont-blanc-tunnel/the-history-of-the-tunnel.html |archivedate=January 4, 2014 |df= }} 9. ^{{Cite news|url=http://news.bbc.co.uk/2/hi/europe/1863245.stm|title=Mont Blanc tunnel reopens|date=2002-03-09|access-date=2018-12-21|language=en-GB}} 10. ^{{Cite web|url=https://www.dw.com/en/the-security-features-of-the-mont-blanc-tunnel/a-18591388|title=The security features of the Mont Blanc Tunnel {{!}} DW {{!}} 17.07.2015|last=Welle (www.dw.com)|first=Deutsche|website=DW.COM|language=en-GB|access-date=2018-12-21}} 11. ^{{Cite web|url=https://www.salini-impregilo.com/en/projects/completed/motorways-airports/a5-mont-blanc-aosta-motorway-courmayeur-morgex-section-lot-no-2.html|title=A5 Mont Blanc-Aosta Motorway - Courmayeur- Morgex Section – Lot No 2 - Salini Impregilo|website=www.salini-impregilo.com|access-date=2018-12-21}} 12. ^1 {{cite web|url=http://www.atmb.com/atmb/en/tunnel/25/the-mont-blanc-tunnel/the-history-of-the-tunnel/the-fire-of-1999.html |title=Archived copy |accessdate=September 27, 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20120729212003/http://www.atmb.com/atmb/en/tunnel/25/the-mont-blanc-tunnel/the-history-of-the-tunnel/the-fire-of-1999.html |archivedate=July 29, 2012 }} 13. ^{{cite web|url=http://www.mace.manchester.ac.uk/project/research/structures/strucfire/CaseStudy/HistoricFires/InfrastructuralFires/mont.htm|title=Case Studies: Historical Fires: Mont Blanc Tunnel Fire, Italy/France|publisher=University of Manchester}} 14. ^{{cite news |last1=Gardiner |first1=Mark |title=A Deadly Blaze in the Alps Made a Biker a Hero and Tunnels Safer for All |url=https://www.nytimes.com/2019/03/21/business/mont-blanc-tunnel-fire-anniversary-rescue.html |accessdate=24 March 2019 |agency=New York TImes}} 15. ^{{cite web|url=https://www.findagrave.com/memorial/15591992|accessdate=8 January 2010|title=Pierlucio Tinazzi|publisher=Find a Grave}} 16. ^{{cite web|last1=Bailey|first1=Colin|title=Infrastructural Fires: Mont Blanc Tunnel, Italy|url=http://www.mace.manchester.ac.uk/project/research/structures/strucfire/CaseStudy/HistoricFires/InfrastructuralFires/mont.htm|website=www.mace.manchester.ac.uk|accessdate=3 February 2016}} 17. ^{{cite web |title=Land transport accident investigation bureau (BEA-TT) |url=http://www.bea-tt.equipement.gouv.fr/_affiche_article.php3?id_article=33 | publisher=French Land Transport Accident Investigation Bureau |accessdate=24 July 2009}} 18. ^{{cite web|url=http://www.lemonde.fr/societe/article/2007/06/14/proces-du-mont-blanc-gerard-roncoli-condamne-en-appel-a-6-mois-de-prison-ferme_923593_3224.html |title=Procès du Mont-Blanc : Gérard Roncoli condamné en appel à 6 mois de prison ferme |publisher=Lemonde.fr |date= |accessdate=2016-04-23}} 19. ^{{Cite web|url=http://archive.wikiwix.com/cache/?url=http://www.tunnelmb.net/v3.0/frasp/tariffr.asp|title=Wikiwix's cache|website=archive.wikiwix.com|access-date=2018-11-12}} External links{{Commons category}}
5.80 km (3.60 mi)}}{{S-ttl|title=World's longest road tunnel|years=1965–1978}}{{S-aft|after=Arlberg Road Tunnel 13.98 km (8.69 mi)}}{{S-end}}{{Autostrade}}{{Mont Blanc massif}} 12 : Road tunnels in France|Road tunnels in Italy|Transport in Aosta Valley|Tunnels in the Alps|France–Italy border crossings|Mont Blanc|Tunnels completed in 1965|Toll tunnels in Europe|1965 establishments in France|1965 establishments in Italy|1999 fires|March 1999 events |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。