请输入您要查询的百科知识:

 

词条 Ulm–Friedrichshafen railway
释义

  1. History

     1945–2011  Since 2001 

  2. Operations

     Transport associations  

  3. Upgrading and electrification

      Planning and financing history    Planning status and financing    Construction    Operations 

  4. See also

  5. References

     Footnotes  Sources 

  6. External links

{{Infobox rail line
| name = Ulm Hbf–Friedrichshafen railway
| native_name = Württembergische Südbahn
| native_name_lang = de
| linenumber = 751
| routenumber = 4500
| linelength_km = 103.6
| gauge = {{Track gauge|sg|allk=on}}
| speed = {{Convert|140|km/h|mph|abbr=on}} (maximum)
| image = VT611.JPG
| image_width = 300px
| caption = IRE-Sprinter near Ravensburg
| tracks = 2
| map_state =
| map ={{Routemap|inline=1|title =no |footnote=Source: German railway atlas[1]|map=

STR~~ ~~ ~~Fils Valley Railway from Stuttgart

ABZg+l~~ ~~ ~~Brenz Railway from Aalen

ABZgr+r~~ ~~ ~~{{BSsplit|Danube Valley Railway|from Immendingen}}

BHF~~94.0~~Ulm Hbf~~ ~~{{Höhe|478}}

ABZgl~~ ~~ ~~to Augsburg

BST~~98.0~~Ulm-Donautal~~(siding)

eBST~~98.8~~Wölper~~(siding)

HST~~99.5~~Ulm-Donautal~~(since 1903)~~{{Höhe|475}}

BST~~100.0~~Ulm Oscorna~~(siding)

DST~~101.8~~Einsingen

BHF~~105.2~~Erbach (Württ)~~ ~~{{Höhe|480}}

BST~~107.7~~Dellmensingen~~(siding)

BST~~111.7~~Rißtissen~~(siding)

BHF~~116.4~~Laupheim West~~ ~~{{Höhe|501}}

ABZgl~~ ~~ ~~to Schwendi

ABZg+l~~ ~~ ~~line from Laupheim Kurve Ost

HST~~121.2~~Schemmerberg~~ ~~{{Höhe|512}}

BST~~124.2~~{{BSsplit|Langenschemmern|(siding, former halt)}}

ABZg+l~~ ~~ ~~Öchsle from Ochsenhausen

HST~~128.1~~Warthausen~~ ~~{{Höhe|526}}

BST~~128.8~~Warthausen~~(siding)

BHF~~131.3~~Biberach (Riß)~~ ~~{{Höhe|532}}

HST~~133.0~~Biberach Süd~~ ~~{{Höhe|535}}

DST~~135.6~~Ummendorf~~ ~~{{Höhe|540}}

eHST~~138.7~~Schweinhausen~~ ~~{{Höhe|544}}

eHST~~140.7~~Hochdorf (Riß)~~ ~~{{Höhe|549}}

eBHF~~143.8~~Essendorf~~ ~~{{Höhe|557}}

eHST~~147.4~~Wattenweiler~~ ~~{{Höhe|578}}

eABZg+r~~ ~~ ~~Federsee Railway from Riedlingen

BHF~~151.3~~Bad Schussenried~~ ~~{{Höhe|558}}

ABZg+l~~ ~~ ~~{{BSsplit|Württemberg Allgäu Railway|from Leutkirch}}

BHF~~156.4~~Aulendorf~~ ~~{{Höhe|547}}

ABZgr~~ ~~ ~~from Herbertingen

eBHF~~163.4~~Durlesbach~~ ~~{{Höhe|496}}

BHF~~168.2~~Mochenwangen~~ ~~{{Höhe|458}}

BHF~~172.9~~Niederbiegen~~ ~~{{Höhe|444}}

eABZgl~~ ~~ ~~former line to Weingarten

HST~~174.9~~Weingarten/Berg~~ ~~{{Höhe|438}}

emABZg+l~~ ~~ ~~former tramway from Baienfurt

BHF~~178.2~~Ravensburg~~ ~~{{Höhe|431}}

HST~~180.4~~Weißenau~~ ~~{{Höhe|425}}

HST~~182.6~~Oberzell~~ ~~{{Höhe|422}}

HST~~189.0~~Meckenbeuren~~ ~~{{Höhe|416}}

eABZgl~~ ~~ ~~former line to Tettnang

HST~~191.0~~Kehlen~~ ~~{{Höhe|409}}

eHST~~192.3~~Gerbertshaus

HST~~193.2~~Friedrichshafen Airport~~ ~~{{Höhe|414}}

BST~~193.7~~Dornier~~(siding)~~{{Höhe|412}}

eBST~~194.2~~Seewald~~(junction)~~{{Höhe|410}}

ABZgl~~ ~~ ~~former line to Rotenmoos

eHST~~195.4~~Löwental~~ ~~{{Höhe|405}}

eABZg+r~~ ~~ ~~{{BSsplit|former Teuringen Valley Railway|from Oberteuringen}}

ABZg+l~~ ~~ ~~{{BSsplit|Lake Constance Belt Railway|from Lindau-Aeschach}}

DST~~196.7~~Friedrichshafen freight yard~~ ~~{{Höhe|404}}

ABZg+l~~ ~~ ~~line from Friedrichshafen Port

BHF~~197.6~~Friedrichshafen Stadt~~ ~~{{Höhe|404}}

STR~~ ~~ ~~{{BSsplit|Lake Constance Belt Railway|to Stahringen}}


}}
}}

The Ulm–Friedrichshafen railway, also known as the Württembergische Südbahn (Württemberg Southern Railway), is a non-electrified main line in the state of Baden-Württemberg, southern Germany. It was built from 1846 to 1850 and doubled from 1905 to 1913. During that time many of the station buildings were rebuilt. Its kilometre numbering begins as the Fils Valley Railway in Stuttgart Hbf.

The Southern Railway begins in Ulm and runs via Biberach an der Riß, Aulendorf and Ravensburg to Friedrichshafen. Several trains continue on the single-tracked line of the Lake Constance Belt Railway to Lindau.

The line has been undergoing upgrading and electrification since the spring of 2018, which requires line closures and replacement bus services. The work should be completed in 2021.

History

Under the technical direction of the civil engineer Ludwig Friedrich Gaab, commissioners Ludwig August von Autenrieth and Georg von Buhler examined an economic link between Ulm and Friedrichshafen from 1836. As an alternative, a canal connection was considered using the Riss and Schussen, which compared to a two-track railway connection promised slightly higher construction costs but much cheaper operations. With the act entitled Über den Bau von Eisenbahnen (on the construction of railways) of 18 April 1843, the Kingdom of Württemberg finally decided to build several railway lines that could be considered as the Northern, Western, Eastern and Southern Railway and would cover the most urgent transport needs of the kingdom.

The Southern Railway was part of a continuous railway line from the navigable Neckar in Heilbronn via Stuttgart and Ulm to Friedrichshafen on Lake Constance. The examination of different route alternatives selected a direct connection from Ulm to Friedrichshafen.{{sfn|Scharf|Wollny|1993|page=86}}

The first isolated section of the line opened on 8 November 1847 between Friedrichshafen and Ravensburg. On 26 May 1849 this was followed by the section to Biberach an der Riss and on 1 June 1850 by the remaining section to Ulm. Initially, with a locomotive transported by horse-drawn wagons and nine wagons, a freight train carrying passengers ran as an island operation. As a result, Friedrichshafen had its own workshop from the beginning, since there was no connection to the railway’s Eßlinger workshop.

With the closing the gap of the Ulm–Geislingen section of the Fils Valley Railway from Stuttgart on 29 June 1850, the Royal Württemberg State Railways (Königlich Württembergischen Staats-Eisenbahnen or K.W.St.E.) won the race to Lake Constance, three years before the Royal Bavarian State Railways and thirteen years before the Grand Duchy of Baden State Railway.

Between 1905 and 1913 the Ulm–Friedrichshafen line was duplicated for military reasons.

1945–2011

After the Second World War, several stations that were located far away from the villages were closed down over the years. Similarly, with the exception of the Aulendorf–Herbertingen and Aulendorf–Kißlegg lines, all the branches with passenger services off the Southern Railway were closed.

Beginning in the 1990s, InterRegio trains operated between Saarbrücken and Lindau on the line. Since 1 July 1993, class NE81 diesel railbuses have been operated on the line popularly known as the Geißbockbahn (billy goat railway; this description comes from the song Auf de Schwäb’sche Eisenbahne, published in 1853) between Friedrichshafen and Ravensburg by the Bodensee-Oberschwaben-Bahn (Lake Constance–Upper Swabia Railway, BOB), founded on 15 October 1991, with services extended on 1 July 1997 to Aulendorf. As early as 1994, high demand led BOB to procure additional vehicles, including wagons borrowed from Hohenzollerischen Landesbahn (Hohenzollern State Railway, HzL). Some of the disused railway stations on the "billy goat railway" have now been reactivated. Stadler Regio-Shuttle RS1 diesel railcars have operated on the Southern Railway since autumn 1998 to cater for the increased traffic.

DB ZugBus Regionalverkehr Alb-Bodensee (DB RAB) has taken over the operation of local passenger services on the northern section of the Southern Railway. In 1999, the Laupheim West–Laupheim Stadt branch line, the last remaining section of the Laupheim West–Schwendi line, was reactivated, with services connecting to Langenau.

Since 2001

In 2001, InterRegio services were abandoned except for a pair of trains cut back to operate between Karlsruhe and Ulm. With the abolition of this type of train in late 2002, the remaining InterRegio train pair was replaced by an InterCity service on the Münster/Dortmund–Lindau–Innsbruck route.

As a replacement for the Interregio services, the Interregio-Express (IRE) train class was introduced on 15 December 2002.[2]

In July 2008, Biberach district and Deutsche Bahn decided to build an about 400 metre-long connecting curve from the Southern Railway to the existing line from Laupheim West to Laupheim Stadt (town) station. This would let direct services run from Biberach via Laupheim Stadt to Ulm. Construction work on this started in June 2009 and was completed in 2011.[3][4] As part of this upgrade, the entire signal system in Laupheim West station was modernised.[5]

The Regionalverband Donau-Iller (Danube-Iller Regional Association) has proposed the upgrade of the Ulm – Biberach – Aulendorf section as part of the Regio-S-Bahn Donau-Iller (Danube-Iller Regional S-Bahn). This would require the electrification of the line.

In addition, the construction of a new connection to the Danube Valley Railway from Erbach to Ehingen was investigated in the course of planning for the Regio-S-Bahn Donau-Iller but was discarded.[6]

To compensate for the impact on the timetable of building Merklingen (Schwäbische Alb) station on the Wendlingen–Ulm high-speed railway, €3 million have been earmarked for upgrades on the Southern Railway.[7] Due to the additional stop, the travel time for regional trains between Stuttgart, Ulm and Friedrichshafen would be extended by two minutes.

Operations

Class 611 diesel multiple units (which are to be replaced by class 612 sets[8]) run as InterRegio-Express services every two hours from Ulm via Friedrichshafen to Erzingen. Push–pull trains composed of locomotives of classes 218 or 245 and double-deck carriages are operated as a Regional-Express (RE) service every hour from Stuttgart via Ulm to Lindau (running as an IRE service between Stuttgart and Ulm), with the exception of one path, which is occupied by an IC train pair running between Münster and Bludenz. Regionalbahn (RB) services run hourly between Ulm and Biberach Süd and between Aulendorf and Friedrichshafen and Friedrichshafen Hafen. Between the peaks, Bad Schussenried is only served by the hourly RE service. The RB services are operated with class 650 (Regio Shuttle) diesel railcars belonging to DB Regio Alb-Bodensee (RAB), Bodensee-Oberschwaben-Bahn (BOB) and HzL. The single InterCity pair of trains is also hauled by a class 218 locomotive.

On Sundays and holidays trains run between (Stuttgart) Ulm, Friedrichshafen and Lindau at two-hour intervals, partly as special bicycle trains. They mainly consist of three to four Silberling cars or double-decker cars with a bicycle or baggage car and a class 218 diesel locomotive. In summer, on some weekends, a bicycle train (only 2nd class) runs from Ulm Hbf to Friedrichshafen Stadt as the RadExpress Bodensee. Bicycles can be taken for free on this train.

The regional services ran on the line on the basis of an underlying transport contract between the state and DB Regio, which ended in 2016. Bids for a successor contract were called at the end December 2014[9] and it was awarded to DB Regio again in March 2016. Although the contract, which runs until 2023, entered into force in December 2016, it was only signed on 16 January 2017. The part of the contract covering the so-called Netz 2, the Stuttgart–Ulm–Friedrichshafen–Lindau route, accounts for 2.6 million train-kilometers per year, of which about 94,000 train-kilometers per year are located in Bavaria. The Geislingen (Steige)–Ulm–Lindau RE service now operates every hour. Renovated double-decker cars with air conditioning, new seats, sockets on the square and Wi-Fi are used.[10][11] In the winter 2017/2018, DB Regio came under criticism for crowded trains and delays.[12]

Transport associations

From Ulm to Aulendorf the line is within the Donau–Iller Local Transport Network (Donau-Iller-Nahverkehrsverbund, DING ). From Aulendorf to Friedrichshafen it is within the Lake Constance–Upper Swabia Transport Association (Bodensee-Oberschwaben Verkehrsverbund, BODO).

Upgrading and electrification

Today, the Württemberg Southern Railway is one of the few non-electrified double-track mainline railways in southern Germany. Electrification including the continuation to Lindau has been agreed.[13] An upgrade to tap the potential for freight and possibly attract more long-distance trains to the line, which is currently (2018) only used by one Intercity train pair. The Federal Transport Infrastructure Plan (Bundesverkehrswegeplan) 2030 specifies a benefit/cost ratio of 2.7 for this measure.[14] It is listed as an urgent need.[15]

Planning and financing history

According to the Standardisierte Bewertung (standardised assessment), a cost-benefit ratio of between 1.8 and 2.4 depending on the option was first calculated mainly as a result of travel time savings and reduced air pollution. The project costs were estimated early on as well over €100 million.

The state of Baden-Württemberg and Deutsche Bahn concluded a planning agreement on 30 June 2009. The results of the planning would be available at the end of 2012.[16] Following a 2008 policy decision, the pre-planning cost of €1.24 million was financed by the Interessenverband Südbahn (Southern Railway Association), bringing together 24 cities and towns along the line.[17][17][18] In December 2010, Deutsche Bahn commissioned the project's environmental planning, which was to be completed between the end of 2010 and the end of 2013.[19]

The planning approval documents for the first of five sections were submitted to the Federal Railway Authority (Eisenbahn-Bundesamt) on 18 August 2011. The documents were due to be submitted for all five sections by the spring of 2012. In autumn 2011, construction was expected to start in 2013. The line speed would be increased to 160 km/h in sections.[17] The estimated cost of the construction of the electrification infrastructure over a total of 253 track-kilometres in September 2011 amounted to around €140 million. The government of Baden-Württemberg provided funding of €8 million for the design and planning approval process. In addition, Baden-Württemberg was willing to fund half of the construction costs.[20] Commissioning was scheduled for 2015.

The cost was estimated at €140 million in the spring of 2012. As a precaution, a cost of €180 million was assumed.[23] The federal and state governments agreed to share the financing of the estimated cost of €180 million.[24] Baden-Württemberg provided its share of financing of €90 million in 2013/14.[23] In autumn 2012, the cost estimate was raised from €180 to 226 million. The increase was due to the identification of water-logged ground, the need to upgrade cable ducts and the need for additional retaining walls. The increase in construction costs was accompanied by an increase in planning costs of €8.28 million, which became known in March 2013. The estimated cost of the overall project now amounted to €234.3 million.[21] It was planned to complete the electrification by the end of 2017.[22]

The financing of the additional costs has not been clarified. A financing agreement had not been reached in April 2013.[23] At the end of May 2013, the documents for the planning approval procedure were submitted for the last two of the five sections.[29] In mid-2014, Deutsche Bahn expected that all permits for all sections would be issued by the end of March 2015.[24] Another delay became known in the same month. According to the Federal Ministry of Transport, the financing agreement would now be signed at the earliest in 2014. The need for additional geophysical investigations was mentioned as a reason for the delay.[25]

According to the Federal Government in December 2013, the project would be completed in 2018.[26] Negotiations on the conclusion of a financing agreement were carried out between the federal and state governments in early 2014. The state pushed for an agreement to be signed in 2014. At the beginning of February 2014, the Baden-Württemberg Ministry of Transport internally anticipated costs to increase to €206 million. The release of the planning documents for the two outstanding sections was planned for April and May 2014 (as of February 2014).[27] The Federal Ministry of Transport announced mid-2014 that the "budgetary requirements for the start of construction on the Southern Railway currently do not exist". Incidentally, the project would become part of the newly modified Federal Transport Infrastructure Plan 2030.[28]

At the end of 2014, Deutsche Bahn was expecting the planning approval decision in the spring of 2015, with the financing agreement signed in the late summer of 2015 and the start of construction in 2016. Three years of construction were planned.[29] In November 2014, the state and the federal government agreed to complete the negotiations over the financing of the project in spring 2015 in Berlin.[30] Baden-Württemberg stated in April 2015 that it would like preparatory work to start in 2015. The state was expecting the planning approval decisions within two to three months.[31]

The Federal Ministry of Transport announced in January 2015 that no financing agreement could be concluded in 2015 due to a lack of funds.[32] The government of Baden-Württemberg assumed in April 2015 that the planning approval decisions would have been made by the middle of 2015. The federal government refused to negotiate a financing agreement prior to the issue of the construction permit, which would be issued with the planning approval.[33] Funding was provided in the state budget. The federal budget, however, provided no specific funding.[34] The economic evaluation for the Federal Transport Infrastructure Plan 2015, was nearing completion at the end of September 2015, showing a positive result. The state of Baden-Württemberg agreed in November 2015 to provide up to €112.5 million for the electrification of the line.[35] In early December 2015, the federal government released funds from the 2015 budget for the electrification of the Southern Railway.[36]

In 2016, the first ground-breaking ceremony for the upgrade was held in spring 2017 at the site of the new substation to be built in Niederbiegen.[37]

Planning status and financing

The financing agreement between Baden-Württemberg and Deutsche Bahn was signed shortly before Christmas 2015. The state agreed to take over half of the eligible costs – up to €112.5 million of €225 million. The electrification would be completed by the end of 2021.[38] A corresponding agreement would be concluded between the state and the federal government.[39]

It was agreed that after electrification of the line, an hourly Oberschwaben-Express would run between Stuttgart and Lindau, along with an hourly express between Ulm and Friedrichshafen. Regio-S-Bahn services would run every half hour between Ulm and Biberachshould.[17]

The project is divided into five planning approval sections (Planfeststellungsabschnitte, PFA), following district boundaries. It ends in Lindau at the junction with the line from Munich, which is also being electrified.[40] In November 2016 all planning decisions were completed.[41] The sections and planning stands are in detail:

  • In PFA 1 (Ulm and Alb-Donau-Kreis), the hearing report was handed over to the Federal Railway Authority in March 2014.[33] The application for planning approval was requested on 18 August 2011. The consultation process was initiated on 14 December 2011 and the plans were publicly exhibited in January and February 2012. The planning approval decision was issued on 27 May 2015.[42]
  • In PFA 2 (Biberach district), the planning documents were made publicly available in October/November 2012. In 2013, Deutsche Bahn submitted a new noise analysis, which was to be discussed at a separate meeting on 29 April 2014.[43] The hearing report was handed over to the Federal Railway Authority in August 2014.[33] The planning approval decision was issued on 15 October 2015[44]
  • In PFA 3 (Ravensburg district), the planning documents were made publicly available from 24 February 2014.[43] The report of the hearing held by the Tübingen regional council was sent to the Federal Railway Authority on 30 December 2014.[33] The planning approval decision was issued on 15 October 2015[45]
  • The PFA 4 (Bodenseekreis) extends in the north to the Ravensburg/Bodenseekreis district boundary and runs through Friedrichshafen station to the crossing of the Schlossstraße in Friedrichshafen. In addition, the proceedings cover the Lake Constance Belt Railway from Friedrichshafen to the border between Baden-Württemberg and Bavaria and the branch line to Friedrichshafen Port. The consultation process was completed in December 2014. The report of the hearing was sent to the Federal Railway Authority on 9 December 2014.[46] The planning approval decision was issued on 29 October 2015[47]
  • The hearing into PFA 5 (Friedrichshafen–Lindau-Aeschach) took place on 16 December 2014. In 2015, the hearing was held by the administrative region of Swabia.[33] The planning approval decision is the subject of a complaint by a landowner.[48]

The laying of a second track between Friedrichshafen and Lindau was planned around 2006 but was later abandoned.[49]

In the summer of 2016, the construction of sections one and two was planned to be carried out in 2018.[50]

Construction

The groundbreaking ceremony for the electrification took place on 23 March 2018. It took place at Niederbiegen, where a substation is being built. The track between Ulm and Laupheim West will be closed from 10 September to 8 December for the construction of the foundations of the catenary pylons. The commissioning of the entire electrification from Ulm to Lake Constance is planned for autumn 2021.[51][52]

The planned track closures are shown in the table below:[51][53]

Track closures as part of the electrification
StartEndSection
10 September 20188 December 2018Ulm–Laupheim West
11 March 201915 July 2019Laupheim West–Biberach (one track only)

Biberach–Aulendorf

16 September 20193 November 2019Ulm–Laupheim West
4 November 201914 December 2019Biberach–Aulendorf
2 March 202012 July 2020Aulendorf–Ravensburg
24 September 202017 December 2020Ravensburg–Friedrichshafen
22 February 20214 April 2021Aulendorf–Ravensburg
5 April 202111 Juli 2021Ravensburg–Friedrichshafen

Operations

After completion of the project, the line will be operable on certain sections at 160 km/h instead of 140 km/h. Depending on stops made, travel time between Ulm and Friedrichshafen is to be reduced from 72 minutes in 2017 to 62 minutes. Freight traffic is expected to more than double between 2016 and 2030.[54]

See also

  • History of railways in Württemberg

References

Footnotes

1. ^{{cite book|title=Eisenbahnatlas Deutschland (German railway atlas) |publisher= Schweers + Wall |edition=10|date= 2017 |isbn= 978-3-89494-146-8|pages=104−5, 112, 163}}
2. ^{{cite journal | title=Neues Konzept für die Südbahn |journal=Eisenbahn-Revue International |volume=2|date=2003 |issn=1421-2811 |page=52 |language=de}}
3. ^{{cite journal|journal=Bahn-Report |title=unknown|issue=5 |date=2008 |page=76 |language=de}}
4. ^{{cite press release|publisher=DB Mobility Logistics AG |title=Feierliche Eröffnung der neuen Bahnlinie Laupheim Stadt–(Südkurve)–Biberach (Riß) am 11. Juni 2011 |date= June 2011|language=de}}
5. ^{{cite web |url=http://www.bahnaktuell.net/BA2/wordpress/?p=12890 |publisher=VBR News-net| title=Construction of southern curve at Laupheim |language=de|accessdate=15 May 2018}}
6. ^{{cite web|publisher=SMA/Intraplan |url=http://www.rvdi.de/fileadmin/Bilder-Dateien/News/VV-PA/2012/VV_27_11_2012/2012-11-27-R-S-Bahn_Verbandsversammlung_korr.pdf |archiveurl=https://web.archive.org/web/20180326064022/http://www.rvdi.de/fileadmin/Bilder-Dateien/News/VV-PA/2012/VV_27_11_2012/2012-11-27-R-S-Bahn_Verbandsversammlung_korr.pdf |archivedate=26 March 2018|deadurl=no|title=Regio-S-Bahn Donau-Iller Ergebnisse der Hauptstudie |format=PDF; 2.4 MB) |date=27 November 2012 |accessdate=15 May 2018|language=de}}
7. ^{{cite press release | url=http://vm.baden-wuerttemberg.de/de/ministerium/presse/pressemitteilung/pid/bahnhof-merklingen-volkswirtschaftlich-sinnvoll/ |title=Bahnhof Merklingen volkswirtschaftlich sinnvoll |publisher=Ministerium für Verkehr |date=27 July 2016 |archiveurl=https://web.archive.org/web/20160730173210/http://vm.baden-wuerttemberg.de/de/ministerium/presse/pressemitteilung/pid/bahnhof-merklingen-volkswirtschaftlich-sinnvoll/ |archivedate=30 July 2016 |deadurl=no|accessdate=15 May 2018 |language=de }}
8. ^{{cite press release|url=https://www.baden-wuerttemberg.de/de/service/presse/pressemitteilung/pid/land-vergibt-vertrag-fuer-neigetechnik-im-netz-donau-ostalb-bis-2026-an-db-regio/ |archiveurl=https://web.archive.org/web/20171222053227/https://www.baden-wuerttemberg.de/de/service/presse/pressemitteilung/pid/land-vergibt-vertrag-fuer-neigetechnik-im-netz-donau-ostalb-bis-2026-an-db-regio/|archivedate=22 December 2017|deadurl=no|title=Land vergibt Vertrag für Neigetechnik im Netz “Donau-Ostalb: bis 2026 an DB Regio| date=4 March 2016|publisher=Ministerium für Verkehr und Infrastruktur Baden-Württemberg|accessdate= 15 May 2018|language=de}}
9. ^{{cite news | title= Land schreibt Betrieb für weitere Zugstrecken aus | newspaper= Stuttgarter Nachrichten | date= 2 January 2015 | page= 17|language=de}}
10. ^{{cite press release |title=Bahnstrecke Stuttgart – Lindau: DB Regio erhält Zuschlag |publisher=Ministerium für Verkehr Baden-Württemberg |url=https://vm.baden-wuerttemberg.de/de/ministerium/presse/pressemitteilung/pid/bahnstrecke-stuttgart-lindau-db-regio-erhaelt-zuschlag/ |archiveurl=https://web.archive.org/web/20180515135432/https://vm.baden-wuerttemberg.de/de/ministerium/presse/pressemitteilung/pid/bahnstrecke-stuttgart-lindau-db-regio-erhaelt-zuschlag/|archivedate=15 May 2018|deadurl=no|accessdate= 15 May 2018|language=de}}
11. ^{{cite press release |title=Verkehrsverträge für das Netz Stuttgart-Ulm-Bodensee und Donau-Ostalb unter Dach und Fach |publisher=Ministerium für Verkehr Baden-Württemberg |url=https://vm.baden-wuerttemberg.de/de/ministerium/presse/pressemitteilung/pid/verkehrsvertraege-fuer-das-netz-stuttgart-ulm-bodensee-und-donau-ostalb-unter-dach-und-fach/ |archiveurl=https://web.archive.org/web/20180515140111/https://vm.baden-wuerttemberg.de/de/ministerium/presse/pressemitteilung/pid/verkehrsvertraege-fuer-das-netz-stuttgart-ulm-bodensee-und-donau-ostalb-unter-dach-und-fach/|archivedate=15 May 2018|deadurl=no|accessdate= 15 May 2018|language=de}}
12. ^{{cite news |title=Bahn soll Kunden in Südwürttemberg entschädigen |newspaper=Schwäbische |url=https://www.schwaebische.de/sueden/baden-wuerttemberg_artikel,-bahn-soll-kunden-in-s%C3%BCdw%C3%BCrttemberg-entsch%C3%A4digen-_arid,10804802.html |accessdate= 15 May 2018|language=de}}
13. ^{{cite web|url=http://www.ravensburg.de/rv/aktuelles/meldungen/Suedbahn-Planungsvereinbarung-unterzeichnet-Baubeginn-Ende-2012-moeglich.php|archiveurl=https://web.archive.org/web/20100210001631/http://www.ravensburg.de/rv/aktuelles/meldungen/Suedbahn-Planungsvereinbarung-unterzeichnet-Baubeginn-Ende-2012-moeglich.php|archivedate=10 February 2010 |title=Südbahn: Ausbau und Elektrifizierung wird Ende 2012 möglich| date= 1 December 2009|accessdate=16 May 2018|language=de}}
14. ^{{cite web|url=http://www.bmvi.de/SharedDocs/DE/Publikationen/G/bundesverkehrswegeplan-2030-gesamtplan.pdf|title=BMVI - Publikationen-Bundesverkehrswegeplan 2030 – Gesamtplan|publisher=Bundesministerium für Verkehr und digitale Infrastruktur|accessdate=16 May 2018|language=de}}
15. ^{{cite journal|url=http://www.bgbl.de/xaver/bgbl/start.xav?startbk=Bundesanzeiger_BGBl&jumpTo=bgbl116s3221.pdf |title=Drittes Gesetz zur Anderung des Bundesscheinenwegeausbaugesetzes |journal=Federal Gazette|page=2 |accessdate=16 May 2018|language=de}}
16. ^{{cite journal|publisher=Deutscher Bundestag |url=http://dipbt.bundestag.de/dip21/btd/17/071/1707115.pdf |title=Antwort der Bundesregierung auf die Kleine Anfrage der Abgeordneten Agnes Malczak, Dr. Anton Hofreiter, Bettina Herlitzius,weiterer Abgeordneterund der Fraktion BÜNDNIS 90/DIE GRÜNEN – Drucksache 17/7096 – |format=PDF; 83 kB | issue=17/7115|journal=Parliamentary records|date=11 October 2011|language=de|accessdate=16 May 2018}}
17. ^{{cite news|first=Thomas|last=Steibadler|title=Neue Hindernisse für die Südbahn|newspaper=Südwest Presse|date=22 October 2015|page=31|url=http://www.swp.de/ulm/lokales/alb_donau/Alb-Bahnhof-noch-in-Verhandlungsschleife-Brenzbahn-Ausbau-rueckt-naeher;art1158552,3491032| language=de|accessdate=16 May 2018}}
18. ^{{cite news | first=Rüdiger |last=Baßler | title=Neue Hindernisse für die Südbahn | newspaper= Stuttgarter Zeitung | issue=264 | date=24 November 2015 | page=28 | url= http://www.stuttgarter-zeitung.de/inhalt.bayerische-kommunen-bremsen-neue-hindernisse-fuer-die-suedbahn.c2f5bb40-3775-42fd-9f21-5e98d5ba3f0b.html |language=de|accessdate=16 May 2018}}
19. ^{{cite journal|url=http://ted.europa.eu/udl?uri=TED:NOTICE:264963-2010:TEXT:DE:HTML |archiveurl=https://web.archive.org/web/20150610193845/http://ted.europa.eu/udl?uri=TED:NOTICE:264963-2010:TEXT:DE:HTML|archivedate=10 June 2015|title=D-Stuttgart: Umweltplanung |issue=2010/S 173–264963 |date=7 September 2010 |journal=Electronic Journal of the European Union|language=de|accessdate=16 May 2018}}
20. ^{{cite press release|publisher=Deutsche Bahn AG |url=http://www.pressrelations.de/new/standard/result_main.cfm?pfach=1&n_firmanr_=101744&sektor=pm&detail=1&r=467650&sid=&aktion=jour_pm&quelle=0 |archiveurl=https://web.archive.org/web/20151118224746/http://www.pressrelations.de/new/standard/result_main.cfm?pfach=1&n_firmanr_=101744&sektor=pm&detail=1&r=467650&sid=&aktion=jour_pm&quelle=0|archivedate=18 November 2015|deadurl=no |title=Planungen zu Elektrifizierung und Ausbau der Südbahn im Zeitplan |date= 28 September 2011|language=de|accessdate=16 May 2018}}
21. ^{{cite news | title= Elektrifizierung wird noch teurer | newspaper= Schwäbische Zeitung | date=16 March 2013 | page=2 | language=de }}
22. ^{{cite journal|title=DB: Neue Pläne für Lindau – erst 2020 elektrisch nach München? |journal= Schweizer Eisenbahn-Revue |issue=10|date=2012|issn=1022-7113 |page=502|language=de}}
23. ^{{cite news | title= Wer die Mehrkosten bezahlt, ist unklar | newspaper= Schwäbische Zeitung | date= 9 April 2013 | language=de}}
24. ^{{cite news | first= Reiner|last=Ruf | title= Bahn investiert kräftig im Südwesten | newspaper= Stuttgarter Zeitung | date= 6 June 2013 | page= 7 | url= http://www.stuttgarter-zeitung.de/inhalt.bahngipfel-in-stuttgart-bahn-investiert-kraeftig-im-suedwesten.d9072913-0f45-4699-9f15-da2c0b587894.html |archiveurl=https://web.archive.org/web/20170830005833/http://www.stuttgarter-zeitung.de/inhalt.bahngipfel-in-stuttgart-bahn-investiert-kraeftig-im-suedwesten.d9072913-0f45-4699-9f15-da2c0b587894.html|archivedate=30 August 2017|deadurl=no|language=de|accessdate=16 May 2018}}
25. ^{{cite news | first=Willi |last=Böhmer | title=Verzögerung Südbahn: Verkehrsminister Hermann ist sauer | newspaper= Südwest Presse | date=21 June 2013 | page= 21 | url=http://www.swp.de/ulm/lokales/alb_donau/Verzoegerung-Suedbahn-Verkehrsminister-Hermann-ist-sauer;art4299,2070148|archiveurl=https://web.archive.org/web/20150924134417/http://www.swp.de/ulm/lokales/alb_donau/Verzoegerung-Suedbahn-Verkehrsminister-Hermann-ist-sauer;art4299,2070148|archivedate=24 September 2015|deadurl=no |language=de|accessdate=16 May 2018}}
26. ^{{cite journal|publisher=Deutscher Bundestag |url=http://dip21.bundestag.de/dip21/btd/18/003/1800357.pdf |title=Unterrichtung durch die Bundesregierung Bericht über die Projektfortschritte beim Ausbau der grenzüberschreitenden Schienenverkehrsachse |issue= Drucksache 18/357 |date=22 January 2014 |page=2|language=de|accessdate=16 May 2018}}
27. ^{{cite news | first= Herbert |last=Beck | title= Bei der Südbahn wartet das Land auf Zusagen aus Berlin | newspaper= Schwäbische Zeitung| edition= Leutkirch | issue=6 February 2014 | page= 2 | url= http://www.schwaebische.de/region/wir-im-sueden/baden-wuerttemberg_artikel,-Bei-der-Suedbahn-wartet-das-Land-auf-Zusagen-aus-Berlin-_arid,5582063.html|archiveurl=https://web.archive.org/web/20151222122301/http://www.schwaebische.de/region/wir-im-sueden/baden-wuerttemberg_artikel,-Bei-der-Suedbahn-wartet-das-Land-auf-Zusagen-aus-Berlin-_arid,5582063.html|archivedate=22 December 2015|deadurl=no |language=de|accessdate=16 May 2018}}
28. ^{{cite news | first1=Bettina |last1=Wieselmann|first2=Thomas |last2=Steibadler | title=Südbahn auf dem Abstellgleis | newspaper=Neue Württembergische Zeitung | date= 5 August 2014 | page= 6 | url= http://www.swp.de/ulm/nachrichten/suedwestumschau/Suedbahn-auf-dem-Abstellgleis;art4319,2735896|archiveurl=https://web.archive.org/web/20150924141246/http://www.swp.de/ulm/nachrichten/suedwestumschau/Suedbahn-auf-dem-Abstellgleis;art4319,2735896|archivedate=24 September 2015|deadurl=no |language=de|accessdate=16 May 2018}}
29. ^{{cite news | first1= Rudi |last1=Kübler | first2=Hans-Uli |last2=Mayer | title= Südbahn kommt noch vor S 21 | newspaper= Südwest Presse | date= 16 December 2014 | page= 15 | language=de}}
30. ^{{cite news | first= Annette |last=Mohl | title= Südbahn Ulm–Lindau nimmt Fahrt auf | newspaper= Stuttgarter Nachrichten | date= 31 December 2014 | page= 7 | url= http://www.stuttgarter-nachrichten.de/inhalt.schienennetz-suedbahn-ulm-lindau-nimmt-fahrt-auf.c6cf7589-c99d-4f6c-9a22-f394df69aa7c.html| archiveurl=https://web.archive.org/web/20170326151212/http://www.stuttgarter-nachrichten.de/inhalt.schienennetz-suedbahn-ulm-lindau-nimmt-fahrt-auf.c6cf7589-c99d-4f6c-9a22-f394df69aa7c.html|archivedate=26 March 2017|deadurl=no|language=de|accessdate=16 May 2018}}
31. ^{{cite news | title= Land macht Druck bei der Südbahn | newspaper= Schwäbische Zeitung | date= 22 April 2015 | page= 2 | language=de}}
32. ^{{cite news | title= Manne Lucha: "Durchbruch bei der Südbahn" | newspaper= Schwäbische Zeitung | date=26 January 2015 | page= 22 | language=de}}
33. ^{{cite journal|title=Mitteilung der Landesregierung Bericht der Landesregierung zu einem Beschluss des Landtags; hier: Ausbau der Südbahn|volume=15|issue=6724|date=13 April 2015|url=http://www.landtag-bw.de/files/live/sites/LTBW/files/dokumente/WP15/Drucksachen/6000/15_6724_D.pdf |publisher=Landtag of Baden-Württemberg|language=de|accessdate=16 May 2018}}
34. ^{{cite news|title= Kretschmann gegen Dobrindt | newspaper= Südwest Presse | date= 22 April 2015 | page= 1 | language=de}}
35. ^{{cite news|title=Hermann sagt 112,5 Millionen für Südbahn zu | newspaper= Südwest Presse | date= 17 November 2015 | page=25 | language=de}}
36. ^{{cite news|title= Verkehrsminister unterschreibt Südbahn-Vertrag | newspaper= Südwest Presse | date= 24 December 2015 | page= 5 |url= http://www.neckar-chronik.de/Nachrichten/Verkehrsminister-unterschreibt-Suedbahn-Vertrag-270992.html|archiveurl=https://web.archive.org/web/20160201173848/http://www.neckar-chronik.de/Nachrichten/Verkehrsminister-unterschreibt-Suedbahn-Vertrag-270992.html|archivedate=1 February 2016|deadurl=no |accessdate=16 May 2018|language=de}}
37. ^{{cite web| url=http://www.schwaebische.de/region/baden-wuerttemberg_artikel,-Spatenstich-fuer-Elektrifizierung-der-Suedbahn-steht-_arid,10559590.html|archiveurl=https://web.archive.org/web/20170901115541/http://www.schwaebische.de/region/baden-wuerttemberg_artikel,-Spatenstich-fuer-Elektrifizierung-der-Suedbahn-steht-_arid,10559590.html|archivedate=1 September 2017 |title=Spatenstich für Elektrifizierung der Südbahn steht |publisher=schwaebische.de |date=8 November 2016|accessdate=16 May 2018|language=de}}
38. ^{{cite news|title=Land und Bahn schließen Vertrag|newspaper=Stuttgarter Zeitung|issue=298|date=24 December 2015|page=25|language=de}}
39. ^{{cite news|title=Südbahnvertrag unterschrieben|newspaper=Badische Zeitung|date=24 December 2015|page=9|url=http://www.badische-zeitung.de/suedwest-1/suedbahnvertrag-unterschrieben--115515756.html |archiveurl=https://web.archive.org/web/20160202045421/http://www.badische-zeitung.de/suedwest-1/suedbahnvertrag-unterschrieben--115515756.html|archivedate=2 February 2016|deadurl=no|accessdate=16 May 2018|language=de}}
40. ^{{cite news|first=Felix |last=Löffelholz|title=Südbahn-Ausbau kommt nur zäh voran|newspaper=Südkurier|date=8 February 2014|url=http://www.suedkurier.de/region/bodenseekreis-oberschwaben/bodenseekreis/Suedbahn-Ausbau-kommt-nur-zaeh-voran;art410936,6681583 |archiveurl=https://web.archive.org/web/20160305034934/http://www.suedkurier.de/region/bodenseekreis-oberschwaben/bodenseekreis/Suedbahn-Ausbau-kommt-nur-zaeh-voran;art410936,6681583|archivedate=5 March 2016|deadurl=no|accessdate=16 May 2018|language=de}}
41. ^{{cite web|url=http://bauprojekte.deutschebahn.com/p/suedbahn|archiveurl=https://web.archive.org/web/20170815145149/https://bauprojekte.deutschebahn.com/p/suedbahn|archivedate=15 August 2017|deadurl=no|title=Bauprojekt Ulm – Friedrichshafen – Lindau-Aeschach {{!}} BauInfoPortal der Deutschen Bahn|publisher=Deutsche Bahn AG, Unternehmensbereich Personenverkehr, Marketing eCommerce|author=bauprojekte.deutschebahn.com|accessdate=16 May 2018|language=de}}
42. ^{{cite web|title=Planfeststellungsbeschluss gemäß § 18 AEG für das Vorhaben "Ulm, Elektrifizierung Südbahn Pfa 1 (...)"|location=Karlsruhe|date=27 May 2015|page=cover sheet, 34, 35|url=http://www.eba.bund.de/SharedDocs/Publikationen/DE/PF/Beschluesse/Baden_W/23_Suedbahn_PFA1.pdf?__blob=publicationFile&v=2|archiveurl=https://web.archive.org/web/20160304100408/http://www.eba.bund.de/SharedDocs/Publikationen/DE/PF/Beschluesse/Baden_W/23_Suedbahn_PFA1.pdf?__blob=publicationFile&v=2|archivedate=4 March 2016|publisher=Eisenbahn-Bundesamt, Außenstelle Karlsruhe/Stuttgart|accessdate=16 May 2018|language=de}}
43. ^{{cite web|publisher=Tübingen region |url=http://www.rp-tuebingen.de/servlet/PB/menu/1387850/index.html |title=Elektrifizierung der Südbahn, Planfeststellungsabschnitt 2 im Landkreis Biberach: Auslegung der geänderten Gesamtlärmbetrachtung und Bekanntmachung des Erörterungstermins |language=de}}
44. ^{{cite web|title=Planfeststellungsbeschluss gemäß § 18 AEG für das Vorhaben Biberach, Elektrifizierung Südbahn PfA 2 (Ulm -Friedrichshafen - Lindau- Aeschach ) (...) |location=Karlsruhe|date=15 October 2015|pages=cover sheet, 34, 35|url=http://www.bodensee-oberschwaben.de/upload/51_Suedbahn_PfA_2_1443.pdf|archiveurl=https://web.archive.org/web/20161106122532/http://www.bodensee-oberschwaben.de/upload/51_Suedbahn_PfA_2_1443.pdf|archivedate=6 November 2016|publisher=Eisenbahn-Bundesamt, Außenstelle Karlsruhe/Stuttgart|accessdate=16 May 2018|language=de}}
45. ^{{cite web|url=http://www.bodensee-oberschwaben.de/upload/51_Suedbahn_PfA_3_1444.pdf|archiveurl=https://web.archive.org/web/20161106122916/http://www.bodensee-oberschwaben.de/upload/51_Suedbahn_PfA_3_1444.pdf|archivedate=6 November 2016|title=Planfeststellungsbeschluss gemäß § 18 AEG für das Vorhaben „Elektrifizierung der Eisenbahnstrecke Ulm - Friedrichshafen - Lindau- Aeschach (Südbahn)“ im Planfeststellungsabschnitt 3, Landkreis Ravensburg (...)|publisher=Eisenbahn-Bundesamt Außenstelle Hannover|date=15 October 2015|accessdate=17 May 2018|language=de}}
46. ^{{cite news|title=Anhörungen zur Südbahn sind abgeschlossen|newspaper=Schwäbische Zeitung|date=13 December 2014|page=12|language=de}}
47. ^{{cite web|url=http://www.rvbo.de/upload/51_Suedbahn_PfA_4_1445.pdf|title=Planfeststellungsbeschluss gemäß § 18 AEG für das Vorhaben „Ulm, Elektrifizierung Südbahn im Planfeststellungsabschnitt 4, Bodenseekreis (...)“|publisher=Eisenbahn-Bundesamt, Außenstelle Hannover|date=29 October 2015|accessdate=17 May 2018|deadurl=yes|archiveurl=https://web.archive.org/web/20161106122916/http://www.rvbo.de/upload/51_Suedbahn_PfA_4_1445.pdf|archivedate=6 November 2016|language=de}}
48. ^{{cite news|title=Klage gegen Elektrifizierung der Südbahn|newspaper=Schwäbische Zeitung|date=17 October 2016|page=20|url=http://www.schwaebische.de/region_artikel,-Nonnenhornerin-klagt-gegen-Suedbahn-_arid,10544972_toid,456.html|archiveurl=https://web.archive.org/web/20170724142409/http://www.schwaebische.de/region_artikel,-Nonnenhornerin-klagt-gegen-Suedbahn-_arid,10544972_toid,456.html|archivedate=24 July 2017|deadurl=no|accessdate=17 May 2018|language=de}}
49. ^{{cite news|title= Neuer Dampf für die Südbahn | newspaper= Schwäbische Zeitung | date= 30 June 2015 | page= 24 | url= http://www.schwaebische.de/region_artikel,-Neuer-Dampf-fuer-die-Suedbahn-_arid,10258615_toid,535.html | archiveurl=https://web.archive.org/web/20170830010323/http://www.schwaebische.de/region_artikel,-Neuer-Dampf-fuer-die-Suedbahn-_arid,10258615_toid,535.html|archivedate=30 August 2017|deadurl=no|accessdate=17 May 2018|language=de}}
50. ^{{cite news|title=Friedrichshafen: Zeitplan für Südbahn bisher nicht gefährdet Online|newspaper=Südkurier|url=http://www.suedkurier.de/region/bodenseekreis-oberschwaben/friedrichshafen/Zeitplan-fuer-Suedbahn-bisher-nicht-gefaehrdet;art372474,8877880|archiveurl=https://web.archive.org/web/20170830012112/http://www.suedkurier.de/region/bodenseekreis-oberschwaben/friedrichshafen/Zeitplan-fuer-Suedbahn-bisher-nicht-gefaehrdet;art372474,8877880|archivedate=30 August 2017|deadurl=bot: unknown|accessdate=17 May 2018|language=de|df=}}
51. ^{{cite news |newspaper=Südwest Presse |title=Elektrifizierung: Südbahn neun Wochen gesperrt |date=24 February 2018|url=https://www.swp.de/suedwesten/landkreise/alb-donau/suedbahn-neun-wochen-gesperrt-24860308.html |archiveurl=https://web.archive.org/web/20180517083205/https://www.swp.de/suedwesten/landkreise/alb-donau/suedbahn-neun-wochen-gesperrt-24860308.html|archivedate=17 May 2018|deadurl=no|accessdate=17 May 2018|language=de}}
52. ^{{cite news |newspaper=Südkurier Medienhaus |title=Friedrichshafen: Startschuss für Elektrifizierung der Südbahn: Historischer Moment für regionalen Schienenverkehr |url=https://www.suedkurier.de/region/bodenseekreis-oberschwaben/bodenseekreis/Startschuss-fuer-Elektrifizierung-der-Suedbahn-Historischer-Moment-fuer-regionalen-Schienenverkehr;art410936,9670102 |archiveurl=https://web.archive.org/web/20180325045522/https://www.suedkurier.de/region/bodenseekreis-oberschwaben/bodenseekreis/Startschuss-fuer-Elektrifizierung-der-Suedbahn-Historischer-Moment-fuer-regionalen-Schienenverkehr;art410936,9670102|archivedate=25 March 2018|deadurl=no|accessdate=17 May 2018|language=de}}
53. ^{{cite journal |url=https://www.landtag-bw.de/files/live/sites/LTBW/files/dokumente/WP16/Drucksachen/2000/16_2650_D.pdf |title=Schienenersatzverkehr im Rahmen der Elektrifizierung der Südbahn |work= |publisher=Landtag of Baden-Württemberg|journal=Parliamentary records|issue=16/2650 |date=18 September 2017 |accessdate=17 May 2018|language=de}}
54. ^{{cite journal |title=Antwort der Bundesregierung auf die Kleine Anfrage der Abgeordneten Matthias Gastel, Harald Ebner, Stephan Kühn (Dresden), weiterer Abgeordneter und der Fraktion BÜNDNIS 90/DIE GRÜNEN – Drucksache 18/12719 – |publisher=Deutscher Bundestag |volume=18 |issue=13070|location=Berlin |date=6 July 2017 |journal=Parliamentary records|pages=3 f. |issn=0722-8333 |url=http://dipbt.bundestag.de/doc/btd/18/130/1813070.pdf|accessdate=17 May 2018|language=de}}

Sources

  • {{cite book|ref=harv|first1=Hans Wolfgang |last1=Scharf |first2=Burkhard |last2=Wollny |title=Die Eisenbahn am Bodensee |trans-title=The railway to Lake Constance|publisher=EK Freiburg |date=1993 | isbn=3-88255-758-3|language=de}}
  • {{cite book|first= Thomas |last=Scherer |title=Eisenbahnen in Württemberg |trans-title=Railways in Württemberg|volume=II: Der Bahnknotenpunkt Aulendorf |publisher= Spurkranz-Verlag |location= Ulm |date=1982 |language=de}}
  • {{cite book|first= Uwe |last=Schmidt |title=Die Südbahn. Eisenbahn und Industrialisierung in Ulm und Oberschwaben |trans-title=The Southern Railway. Railways and industrialisation in Ulm and Upper Swabia |publisher= Süddeutsche Verlags-Gesellschaft |location= Ulm |date=2004| isbn= 3-88294-342-4 |language=de}}
  • {{cite book|first= Otto |last=Supper |title=Die Entwicklung des Eisenbahnwesens im Königreich Württemberg |trans-title=The development of railways in the Kingdom of Württemberg |publisher=Kohlhammer |location= Stuttgart |date=1981| isbn= 3-17-005976-9 |language=de}} (reprint of 1895 edition)

External links

{{Commons category|Südbahn (Württemberg)|Southern Railway (Württemberg)}}
  • Suedbahn-online – Railways in the Lake Constance-Oberschwaben-Allgäu area
  • The Südbahn – KBS 751 Ulm–Friedrichshafen
  • 1944 timetable
{{coord|47|54|10|N|9|40|36|E|region:DE-BW_type:landmark_source:kolossus-dewiki|display=title}}{{DEFAULTSORT:Southern Railway (Wurttemberg)}}

10 : Railway lines in Baden-Württemberg|Transport in Ulm|Buildings and structures in Ulm|Buildings and structures in Alb-Donau-Kreis|Buildings and structures in Biberach (district)|Buildings and structures in Ravensburg (district)|Buildings and structures in Bodenseekreis|Upper Swabia|Railway lines opened in 1847|Friedrichshafen

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/12 9:46:49