{{Infobox power transmission line
| name = Murraylink
| photo =
| caption =
| map =
| country = Australia
| state =
| province =
| coordinates = {{Coord|34|17|37|S|142|14|20|E|type:landmark|name=Red Cliffs Static Inverter Plant}}
{{Coord|34|14|17|S|140|36|01|E|type:landmark|name=Berri Static Inverter Plant}}
| direction =
| start = Berri, South Australia
| through =
| finish = Red Cliffs, Victoria
| par =
| owner = Energy Infrastructure Investment
| partners =
| operator = APA Group
| cable_manufacturer = ABB
| cable_installer =
| cable_layer =
| substation_manufacturer =
| substation_installer =
| contractors =
| construction =
| est = 2002
| decom =
| type = underground cable
| current_type = Light HVDC
| length = 180
| capacity = 220 MW
| AC_voltage = 132 kV (Berri)
220 kV (Red Cliffs)
| DC_voltage = ±150 kV
| poles_no = 2
| circuits_no =
}}Murraylink is an Australian high voltage direct current electricity transmission link between Berri in South Australia and Red Cliffs in Victoria, connecting the two state electricity grids. Murraylink was commissioned in 2002 and is believed to be the worlds longest underground transmission system and cost more than A$177 million. It was built by TransEnergie Australia, a subsidiary of Hydro-Québec. It was sold to the Australian Pipeline Trust (APA Group) in March 2006 for A$153 million. In December 2008 ownership of Murraylink (as well as Directlink) was transferred to the newly formed Energy Infrastructure Investments Group, while APA continued as the operator.[1] The ownership of EII is APA with 19.9%, with the balance with Japan-based Marubeni Corporation with 49.9% and Osaka Gas with 30.2%.[2]

Capacity

Murraylink consists of two {{convert|180|km|adj=on}} long bipolar HVDC cables.[3] The circuit has an operating voltage of 150 kV and a transmission capacity of 220 megawatts. The link operates an "HVDC Light" voltage-source converter system, utilising insulated-gate bipolar transistors (IGBT), to convert electricity between alternating current and direct current.

While Murraylink is rated at 220MW, it is unable to operate at capacity during periods of high demand due to limitations in the transmission infrastructure at either end.[4] The limitations relate to thermal overload of transformers or transmission lines supplying the Riverland (for South Australia to Victoria transmission) and western Victoria (for Victoria to South Australia transmission).[5]

Sites

Red Cliffs Static Inverter Plant 34|17|37|S|142|14|20|E|type:landmark|name=Red Cliffs Static Inverter Plant}}
Berri Static Inverter Plant 34|14|17|S|140|36|01|E|type:landmark|name=Berri Static Inverter Plant}}

References

1. ^[https://www.aer.gov.au/system/files/Directlink%20-%20amended%20cost%20allocation%20method.pdf Electricity Transmission Network Service Providers - Directlink and Murraylink amended Cost Allocation Methodologies - March 2010]
2. ^[https://www.apa.com.au/our-services/other-energy-services/electricity-transmission-interconnectors/ electricity interconnectors]
3. ^{{cite web |url=http://new.abb.com/systems/hvdc/references/murraylink |title=Murraylink - the worlds longest underground power link |publisher=ABB group |accessdate=1 August 2017}}
4. ^{{cite web |url=https://www.aer.gov.au/system/files/Murraylink%20-%20Proposed%20contingent%20project%20-%20May%202012.pdf |title=Contingent Project Proposal |publisher=Murraylink Transmission Company Pty Ltd |date=May 2012 |page=2 |accessdate=1 August 2017}}
5. ^{{cite web |url=http://www.aemo.com.au/-/media/Files/PDF/Interconnector-Capabilities-v2.pdf |title=Interconnector Capabilities for the National Electricity Market |publisher=Australian Energy Market Operator |date=September 2015 |accessdate=1 August 2017 |pages=10–11}}

External links

{{GeoGroupTemplate}}{{Australia-powerstation-stub}}{{powerline-stub}}

5 : HVDC transmission lines|Electric power transmission systems in Australia|Hydro-Québec|Energy in South Australia|Energy in Victoria (Australia)

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 22:57:05