词条 | Upper Wardha Dam |
释义 |
| name = Upper Wardha Dam Nal Damayanti Sagar | image = Upper Wardha Dam.jpg | image_caption = | name_official = Upper Wardha Dam D02982 | dam_crosses = Wardha River | location = Morshi | dam_type = Earthfill Gravity | dam_length = {{convert|5920|m|abbr=on}} (Spillway {{convert|268|m|abbr=on}} | dam_height = {{convert|46.2|m|abbr=on}} (Spillway), {{convert|36.62|m|abbr=on}} Earth Dam | dam_width_base = | dam_width_crest = | dam_volume = | spillway_type = | spillway_capacity = | construction_began = | opening = 1993[1] | cost = | owner = Government of Maharashtra, India | res_name = | res_capacity_total = 786,480,000 cubic metres (live storage 614,790,000 cubic metres) | res_catchment = {{convert|4302|km2|abbr=on}} | res_surface = {{convert|9748|ha|abbr=on}} | res_max_depth = | plant_operator = | plant_turbines = | plant_capacity = | plant_annual_gen = | plant_commission = | plant_decommission = | location_map = India Maharashtra | location_map_caption = | location_map_size = | coordinates = {{coord|21|16|35|N|78|03|26|E|type:landmark|display=inline,title}} | website = Upper Wardha Dam | extra = }} The Upper Wardha Dam is an earthfill straight gravity dam across the Wardha River, a tributary of the Godavari River, near Simhora village in Morshi taluk in Amravati district in the Indian state of Maharashtra. The dam provides multipurpose benefits of irrigation, drinking water supply, flood control and hydropower generation.[2][3] The Upper Wardha Dam is also known as the Nala Damayanti Sagar, named after the famous characters Nala and Damayanti of an epic love story in Hindu mythology, Nala Damayanti.[2] The multipurpose Upper Wardha Dam project is considered the lifeline for Amravati city, and Morshi and Warud Talukas. It is an integral component of the Upper Wardha Irrigation Project, which envisages providing water for irrigation, drinking water supply and for industrial use and also flood control. Hydropower generation is planned only when irrigation develops.[2][3][4] GeographyThe Wardha River, across which the Upper Wardha Dam is built, is a tributary of the Godavari River. From its origin, at an altitude of {{convert|785|m|abbr=on}} in Satpura Range from the Multai plateau in Betul District of Madhya Pradesh, the river flows {{convert|32|km|abbr=on}} in Madhya Pradesh and then enters into Maharashtra near the Multai plateau of the Satpuda range. It flows along the entire northern and western border of the Wardha district. After traversing {{convert|528|km|abbr=on}}, it joins Wainganga River and together it is called the Pranhita, which ultimately flows into the Godavari River. Kar, Wena, Jam and Erai are its left-bank tributaries whereas Madu, Bembla and Penganga are the right-bank tributaries. The catchment area is hilly and forested in its upper reaches from its source and the lower reaches are flat wide valleys.[2][3][5] The project is located near Morshi, about {{convert|8|km|abbr=on}} towards to the east of Morshi and {{convert|56|km|abbr=on}} from the Amravati City, in the Godavari River Basin. The river drains a catchment area of {{convert|4302|km2|abbr=on}} up to the dam site.[2][3] HydrologyThe path of Monsoon depressions that originate in the Bay of Bengal descends directly on the Upper Wardha catchment area. In the months of August and September, intense cyclonic precipitation also occurs over the catchment for one of two days as the low-pressure area formed in the Bay of Bengal and the cyclone moved in North West direction. On such occasions, intense rainfall is followed by flash flood runoff in the catchment. In view of these meteorological aspects heavy floods have been very common feature in this catchment. For such a flashy type of catchment with varying topography, runoff estimates at dam site are an involved process. The catchment drained at the dam site is of {{convert|4302|km2|abbr=on}} and is fan shaped. The parameters of slope, soil and vegetation cover, which influence the hydrology of the project, vary widely.[6] The average annual rainfall in the catchment is {{convert|840|mm|abbr=on}}, with 95% of occurring during monsoon period from June to September. The average annual inflow to the Upper Wardha Reservoir is estimated at 783 million cubic metres. The 75% dependable runoff is estimated as 500,720,000 cubic metres.[4][7] SpecificationsUpper Wardha dam has two sections, the spillway at the central part of the river is flanked by long earthen embankment dams. The height of the masonry dam, which is the spillway, above the lowest foundation is {{convert|46.2|m|abbr=on}} and its length is {{convert|268|m|abbr=on}}. The height of the earth dam on both flanks of the spillway is {{convert|36.62|m|abbr=on}} and its total length is {{convert|5920|m|abbr=on}}. The dam structure has a volume content of 6500 million cubic metres. The gross storage capacity of the reservoir is 786,480,000 cubic metres with the live or effective storage capacity fixed at 614.79 million cubic metres. The Dead Storage capacity is 171,690,000 cubic metres. Water utilization is planned at 390 million cubic metres. The spillway built in the gorge section of the river, which is {{convert|240.5|m|abbr=on}} long, is a gated structure with 13 radial gates designed to pass the design flood discharge of {{convert|19457|m3|abbr=on}}/s.[2][3][4][7]
The reservoir water spread at Full Reservoir Level (FRL) of {{convert|342.50|m|abbr=on}} is {{convert|9748|ha|abbr=on}}.[2] The reservoir submergence involved 24 villages in Amravati and Wardha Districts, which were partially or fully submerged involving rehabilitation of 3000 families (11,817 people) of farmers and fish workers who were displaced and resettled. These families were still in an agitation mode seeking better compensation, as only a small cash compensation was provided to them when resettled. Their demand centred on right to access the Upper Wardha dam (the Nal Damayanti Sagar) reservoir for fisheries as a measure of rehabilitation.[8][9]
The irrigation system of the project was planned to irrigate lands through the right bank main canal of {{convert|95|km|abbr=on}} length and left bank main canal of {{convert|42.4|km|abbr=on}} with complement of a system to carry the water to the fields. The total irrigation potential created is in an irrigable area of {{convert|70169|ha|abbr=on}}, out of an irrigation potential of {{convert|75080|ha|abbr=on}} (Gross Command Area is {{convert|116970|ha|abbr=on}}, Culturable Command Area is {{convert|93603|ha|abbr=on}}), which is spread over the districts of Amravati and Wardha. The command area is principally made up of Black Cotton Soils. Jowar, cotton, soybean, tur, ground nut, and oranges are the major crops grown in the command area. The canal systems are slated for completion by June 2013.[4] To ensure better irrigation planning to ensure supplies reach the tail end of the canal system even during the low flow years, a "General Algorithm" model to operate the reservoir with a Rule Curve (reservoir operating rules) in real time with inputs of all variable parameters (such as monthly demands for irrigation) has been developed. The model results indicate that irrigation releases matched irrigation demand. The reservoir operation in this process is aimed by maintaining minimum storage at the beginning of monsoon (which is the end of water year) and maintaining maximum storage during the peak of the monsoon period.[4]
Amravati town is now provided water supply from the Upeer Wardha reservoir supplementing an earlier supply source.. Water supply to the Warud town (a flourishing commercial town about {{convert|85|mi|abbr=on}} from Amravati city) is also planned to be supplemented from the Upper Wardha reservoir storage, which will supplement the existing tube well sources and the interim measure of tapping the Shekhdari River as a source. The plan envisages supplementation from the storage at the dam to meet the needs of the projected population of 34,500 in 2011 and 34500 in 2026 at 4,209,000 litres per day and 4,974,000 litres per day, respectively.[10] Water for industrial use has also been allocated and based on this allotment, a 25,000,000 litre per day water treatment plant has been built near Amravati town.[11] Another project to divert 4,230,000 cubic metres of water from the Upper Wardha Dam Pandhurna district in Madhya Pradesh has also been approved at a cost of US $18 million.
The reservoir water level is regulated in such a way that the river flooding in the districts of Amravati and Wardha is avoided. An automatic system of operating gates of the spillway dam to release flood water safely downstream has been installed in a control chamber of the dam. The digital instrument installed (based on Genetic Algorithm) is a two-part ultrasonic gauging device. This system is linked to the management system through "RS-232 digital connection" to receive continuous gauge measurement data and concurrently converting the gauge level to volume figures.[4]
The dam and its surroundings provide are picturesque. Several rare species of birds have been reported from the area.[12] See also{{commons category|Upper Wardha Dam}}
References1. ^{{cite web | url=http://india-wris.nrsc.gov.in/wrpinfo/index.php?title=Upper_Wardha_D02982 | title=Upper Wardha D02982 | accessdate=28 February 2013}} {{Godavari basin}}2. ^1 2 3 4 5 6 {{Cite web|url=http://www.cwc.nic.in/main/downloads/National%20Register%20of%20Large%20dams%202009.pdf|format=pdf|title=National Register of Dams 2009|accessdate=21 March 2011|publisher=Central water Commission: National Informatics Center|archive-url=https://web.archive.org/web/20110721165130/http://www.cwc.nic.in/main/downloads/National%20Register%20of%20Large%20Dams%202009.pdf|archive-date=21 July 2011|dead-url=yes|df=dmy-all}} 3. ^1 2 3 4 {{Cite web|url=http://www.sakti.in/godavaribasin/tributaries.htm|title=Data base on Godavari Basin:Wardha|accessdate=21 March 2011|publisher=Sakti a Voluntary Organization}} 4. ^1 2 3 4 5 {{Cite journal|url=http://www.ijetch.org/papers/034.pdf|format=pdf|title= Optimal Reservoir Operation Policies Using Genetic Algorithm|accessdate=21 March 2011|publisher=International Journal of Engineering and Technology|volume=1|issue=2|date=June 2009|author=Y. P. Mathur, S. J. Nikam|pages=184–187}} 5. ^{{Cite web|url= http://wardha.gov.in/htmldocs/rivers.asp|title=Rivers|accessdate=21 March 2011|publisher=Government of India}} 6. ^{{Cite web|url=http://www.ijcaonline.org/volume8/number12/pxc3871777.pdf|format=pdf|title=Short Term Flood Forecasting Using General Recurrent|accessdate=21 March 2011|publisher= International Journal of Computer Applications (0975–8887) Volume 8– No.12, October 2010}} 7. ^1 {{cite book|author1=India. Irrigation Commission|author2=Ajit Prasad Jain|title=Report, 1972|url=https://books.google.com/books?id=WF3VAAAAMAAJ|accessdate=21 March 2011|year=1972|publisher=Ministry of Irrigation and Power}} 8. ^{{cite book|author=Socialist Party (India)|title=Janata|page=120|url=https://books.google.com/books?id=qT1WAAAAYAAJ|accessdate=13 May 2011|year=2008}} 9. ^{{Cite web|url=http://www.savingiceland.org/2008/07/fishworkers-affected-by-upper-wardha-dam-take-action/|title=Fishworkers Affected by Upper Wardha Dam Take Action |accessdate=14 May 2011|publisher= Savingiceland.org}} 10. ^{{Cite web|url= http://warudnagarparishad.org.in/water-supply.html|title= Water Supply|accessdate=13 May 2011|publisher=Warudnagar Parishad}} 11. ^{{Cite web|url=http://www.eldecosez.com/faq.html. |title= Faq: (A) SEZ Related Queries|accessdate=14 May 2011|publisher=Gowthcity Amravati SEZ}} 12. ^{{Cite web|url=http://www.india9.com/i9show/Upper-Wardha-Dam-46748.htm|title=Upper Wardha Dam|accessdate=13 May 2011|publisher=India9.com}} 3 : Dams in Amravati district|Gravity dams|Dams completed in 1993 |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。