词条 | U.S. Route 24 in Ohio |
释义 |
|state=OH |type=US |route=24 |map=US 24 in Ohio map.svg |map_notes=US 24 highlighted in red across northwestern Ohio |length_mi=83.33 |length_ref=[1] |established= |direction_a=West |terminus_a={{jct|state=IN|US|24}} near Antwerp |junction={{plainlist|
}} |direction_b=East |terminus_b={{jct|state=MI|US|24}} in Toledo |counties=Paulding, Defiance, Henry, Lucas |previous_type=OH 1920 |previous_route=23 |previous_dab=1923-1927 |next_type=OH 1920 |next_route=24 |next_dab=1923-1927 }} U.S. Route 24 (US 24) is a United States Numbered Highway that runs from Minturn, Colorado, to Independence Township, Michigan. In Ohio, it is an expressway and freeway for much of its length, from the Indiana state line to Maumee. From there northeasterly to the Michigan state line at Toledo, it is a surface highway. Route description{{expand-section|More route description|date=September 2014}}From the Indiana state line easterly to Baltimore Street at the border of unincorporated Defiance Township and the city of Defiance, US 24 is an expressway which mostly has interchanges, but features intersections with select county and township roads. From Baltimore Street to State Route 281 at the border of Defiance and unincorporated Noble Township, US 24 is a freeway. From SR 281 to US 6 west in Henry County's Napoleon Township, US 24 is once again an expressway. From US 6 west to Interstate 475 (I-475) in the city of Maumee, US 24 is a freeway. The route continues northeasterly as a surface street through downtown Maumee and the western side of Toledo, continuing to the Michigan state line. At this point, the route continues northerly into Michigan as a north–south highway. History{{expand-section|More route history|date=September 2014}}Upgrades to the route around Napoleon began in 2008. This included the construction of a new route from east of Napoleon to north of Waterville, bypassing the original routing of the highway. This rerouting was done to "alleviate safety concerns caused by the mixture of truck traffic and residential travel" along US 24's former routing.[2] New alignments west of Defiance through to Interstate 469 in Fort Wayne, Indiana were also built in the late 2000s.[3] The conversion to an expresway, first proposed in 1969, was made due to the high number of road accidents along the old alignment, which comprised only two lanes and was frequently used by tractor-trailers.[4] {{-}}Major intersections{{jcttop|exit|length_ref=[1]}}{{OHint|exit|county=Paulding |cspan=4 |township=Carryall |ctdab=Paulding |lspan=2 |road={{jct|state=IN|US|24|dir1=west|location1=Fort Wayne}} |mile=0.00 |mspan=2 |notes=Continuation into Indiana }}{{OHint|exit |mile=none |place=Eastern end of freeway; western end of expressway }}{{OHint|exit |township=Crane |ctdab=Paulding |mile=3.32 |mile2=4.18 |exit=3 |road={{jct|state=OH|SR|49|city1=Antwerp|city2=Payne}} |notes=Diamond interchange }}{{OHint|exit |township=Emerald |ctdab=Paulding |mile=12.38 |mile2=13.19 |exit=13 |road={{jct|state=OH|US|127|location1=Sherwood|city2=Paulding|city3=Cecil}} |notes=Diamond interchange }}{{OHint|exit |county=Defiance |cspan=6 |location1=Defiance Township |ctdab1=Defiance |location2=Defiance |lspan=2 |mile=22.47 |mile2=22.96 |mspan=2 |place=Eastern end of expressway; western end of freeway }}{{OHint|exit |mile=none |exit=22 |road=Baltimore Street |notes=Partial cloverleaf interchange }}{{OHint|exit |township=Noble |ctdab=Defiance |mile=24.97 |mile2=25.44 |exit=25 |road={{jct|state=OH|SR|15|SR|18|city1=Bryan|city2=Defiance}} |notes=Diamond interchange }}{{OHint|exit |location=Defiance |mile=25.90 |mile2=26.41 |exit=26 |road={{jct|state=OH|SR|66|city1=Archbold|city2=Defiance}} |notes=Diamond interchange }}{{OHint|exit |location1=Defiance |location2=Richland Township |ctdab2=Defiance |lspan=2 |mile=27.78 |mile2=28.60 |mspan=2 |exit=28 |road={{jct|state=OH|SR|281|name1=Domersville Road}} |notes=Diamond interchange }}{{OHint|exit |mile=none |place=Eastern end of freeway; western end of expressway }}{{OHint|exit |county=Henry |cspan=6 |township=Napoleon |ctdab=Henry |lspan=3 |mile=38.83 |mile2=39.32 |mspan=2 |place=Eastern end of expressway; western end of freeway }}{{OHint|exit |mile=none |exit=39 |type=concur |road={{jct|state=OH|US|6|dir1=west|location1=Kendallville (Indiana)|location2=Chicago}} |notes=Western end of US 6 concurrency; partial cloverleaf interchange }}{{OHint|exit |mile=40.10 |mile2=40.34 |exit=40 |road={{jct|state=OH|SR|108|US-Bus|6|city1=Wauseon|city2=Napoleon}} |notes=Partial cloverleaf interchange }}{{OHint|exit |township=Liberty |ctdab=Henry |lspan=3 |mile=41.38 |mile2=41.90 |exit=41 |road=Industrial Drive |notes=Diamond interchange }}{{OHint|exit |mile=43.64 |type=concur |exit=43 |road={{jct|state=OH|US|6|CR|424|SR|110|dir1=east|city1=Bowling Green|to2=to}} |notes=Eastern end of US 6 concurrency; eastbound exit and westbound entrance; entrance ramp flies under eastbound lanes and merges on the left }}{{OHint|exit |mile=46.54 |mile2=47.16 |exit=47 |road={{jct|state=OH|SR|109|city1=Liberty Center|city2=Malinta}} |notes=Diamond interchange }}{{OHint|exit |county=Lucas |cspan=15 |township=Providence |ctdab=Lucas |mile=56.91 |mile2=57.39 |exit=57 |road={{jct|state=OH|SR|295|city1=Whitehouse|location2=Grand Rapids (Ohio)}} |notes=Diamond interchange }}{{OHint|exit |township=Waterville |ctdab=Lucas |mile=62.81 |mile2=63.32 |exit=63 |road={{jct|state=OH|SR|64|city1=Whitehouse|city2=Waterville}} |notes=Diamond interchange }}{{OHint|exit |township1=Waterville |township2=Monclova |ctdab=Lucas |mile=65.62 |mile2=66.09 |type=incomplete |exit=66 |road=Anthony Wayne Trail – Waterville |notes=Westbound exit and eastbound entrance; exit ramp flies under US 24 }}{{OHint|exit |location=Maumee |lspan=4 |mile=66.49 |mile2=66.93 |exit=67 |road=Fallen Timbers Lane |notes=Access to The Shops at Fallen Timbers; partial cloverleaf interchange, was originally signed Jerome Road, Stitt Road }}{{OHint|exit |mile=67.65 |mile2=68.26 |mspan=2 |exit=68 |road={{jct|state=OH|I|475|US|23|city1=Dayton|location2=Ann Arbor (Michigan)}} |notes=Cloverleaf interchange; signed as 68A (south) and 68B (north); exit 4 on I-475 }}{{OHint|exit |mile=none |place=Eastern end of freeway }}{{OHint|exit |type=concur |mile=69.77 |road={{jct|state=OH|US|20|SR|25|I|80|I|90|OHTP|dir2=south|name2=Conant Street|to3=to}} |notes=Southern end of SR 25 concurrency }}{{OHint|exit |location1=Maumee |location2=Toledo |location_group=city |mile=72.14 |type=concur |road={{jct|state=OH|SR|25|name1=Anthony Wayne Trail|dir1=north|road=South Detroit Avenue}} |notes=Northern end of SR 25 concurrency }}{{OHint|exit |location=Toledo |lspan=7 |mile=75.80 |road={{jct|state=OH|SR|2|name1=Airport Highway}} |notes= }}{{OHint|exit |mile=77.48 |road={{jct|state=OH|SR|246|name1=Dorr Street}} |notes= }}{{OHint|exit |mile=78.37 |road={{jct|state=OH|SR|51|name1=Monroe Street}} |notes= }}{{OHint|exit |mile=78.54 |mile2=78.65 |road={{jct|state=OH|I|75|location1=Detroit|city2=Dayton}} |notes=Exit 203B on I-75 }}{{OHint|exit |mile=79.42 |road={{jct|state=OH|SR|120|name1=Central Avenue}} |notes= }}{{OHint|exit |mile=82.76 |road={{jct|state=OH|SR|184|name1=Alexis Road}} |notes= }}{{OHint|exit |mile=83.33 |road={{jct|state=MI|US|24|dir1=north|name1=Telegraph Road|city1=Detroit}} |notes=Continuation into Michigan}}{{Jctbtm|exit|keys=concur,incomplete}} References1. ^1 {{cite web |url= http://www.dot.state.oh.us/Divisions/Planning/TechServ/TIM/Pages/DESTAPE.aspx |title= DESTAPE |publisher= Ohio Department of Transportation |date= July 16, 2013 |accessdate= September 21, 2014}}*Paulding County*Defiance County*Henry County*Lucas County 2. ^{{cite web |author= Staff |url= http://www.dot.state.oh.us/projects/us24/NapoleontoToledo/Pages/default.aspx |title= U.S. Route 24—Fort to Port: Napoleon to Toledo, Ohio |publisher= Ohio Department of Transportation |accessdate= September 11, 2014}} 3. ^{{cite web |author= Staff |url= http://www.dot.state.oh.us/projects/us24/Pages/default.aspx |title= U.S. Route 24—Fort to Port Realignment/Expansion |publisher= Ohio Department of Transportation |accessdate= September 11, 2014}} 4. ^{{cite news |url= http://www.toledoblade.com/local/2012/08/29/Expanded-U-S-24-read-to-open-today-after-decades-of-struggle.html |title= Expanded US 24 Open Today After Decades of Struggle 200 Gather near Waterville to Celebrate Fort to Port Project |last= Patch |first= David |date= August 29, 2012 |work= The Blade |location= Toledo, OH ||accessdate= September 11, 2014}} External links{{Attached KML|display=inline,title}}
6 : U.S. Highways in Ohio|U.S. Route 24|Transportation in Paulding County, Ohio|Transportation in Defiance County, Ohio|Transportation in Henry County, Ohio|Transportation in Lucas County, Ohio |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。