请输入您要查询的百科知识:

 

词条 New Haven–Springfield Line
释义

  1. History

     Interstate 84 

  2. Shuttles

  3. Hartford Line

  4. Stations

  5. References

  6. Notes

  7. External links

{{Use mdy dates|date=April 2018}}{{Infobox rail line
| box_width =
| name = New Haven–Springfield Line
| color =
| logo =
| logo_width =
| logo_alt =
| image = NHS Shuttle at New Haven.jpg
| image_width = 300px
| image_alt =
| caption = Amtrak Shuttle #470, a single coach shuttle, awaiting Northeast Regional train #170 from Washington, D.C.
| type = Inter-city rail
| system = Amtrak
| status = Operating
| locale = Connecticut and Massachusetts
| start = Union Station, New Haven, Connecticut
| end = Union Station, Springfield, Massachusetts
| stations = 9
| routes ={{Plainlist|
  • New Haven–Springfield Shuttle
  • Northeast Regional
  • Vermonter
  • Hartford Line

}}
| daily_ridership =
| ridership2 =
| open = 1844
| close =
| owner = Amtrak
| operator = Amtrak, Connecticut Southern Railroad (freight)
| character =
| depot =
| stock =
| linelength ={{convert|62|mi|km}}
| tracklength =
| tracks = 1–2
| gauge = {{Track gauge|ussg|allk=on}}
| routenumber =
| electrification =
| speed = Up to {{cvt|110|mph}}[1]
| elevation =
| map = {{New Haven–Springfield Line}}
| map_state = collapsed
}}

The New Haven–Springfield Line is a railroad line owned by Amtrak from New Haven, Connecticut, north to Springfield, Massachusetts. As a branch of the Northeast Corridor just north of New Haven State Street station, it is served by approximately seven daily Northeast Regional round trips, some continuing from New Haven to Washington, D.C., along the Corridor and others terminating at New Haven as shuttles. On weekends, there is one train daily to Roanoke, Virginia. It is also served by the daily Vermonter, which starts in Washington, D.C. and continues north from Springfield, finally terminating in St. Albans, Vermont.[2] The line is part of the Inland Route connecting Boston and New York via Hartford, Springfield, and Worcester, in contrast to the "Shore Line" along the Connecticut Shore and through Rhode Island.

In 2004, Congress added the New Haven–Springfield Line onto the Northern New England Corridor, one of ten federally designated corridors for potential high-speed rail service. Upgrades needed for higher-speed rail, including rebuilding portions of double tracking removed in the 1980s, were performed in preparation for the CTrail Hartford Line commuter service, which launched on June 16, 2018.[3]

History

The New Haven–Springfield Line was built by the Hartford and New Haven Railroad (H&NH) and began operations in 1844, forming the first all-rail route between Boston and New Haven, with steamship service on Long Island Sound completing service to New York. The Shore Line, today's Northeast Corridor, was completed in 1858, but the Springfield route continued to carry most traffic until the bridge over the Thames River at New London, Connecticut, opened in 1889.{{citation needed|date=February 2016}}

The H&NH was merged into the New York, New Haven and Hartford Railroad (NYNH&H) in 1872, and the NYNH&H continued to operate regular service between New York City and Springfield over the line. Various services were also operated over the Inland Route, starting July 1, 1911 by agreement of the NYNH&H and the New York Central and Hudson River Railroad (lessee of the Boston and Albany Railroad). By the startup of Amtrak on May 1, 1971, the Inland Route was no longer in use, but frequent trains continued to serve the New Haven–Springfield Line.{{citation needed|date=February 2016}}

On May 17, 1971, Amtrak added a train between Philadelphia and Boston via the Inland Route. With the November 14, 1971 timetable, this was assigned the name Bay State, and extended south from Philadelphia to Washington, DC. The train was discontinued March 1, 1975, though on October 31 of that year, the Boston section of the Lake Shore Limited began, restoring Springfield–Boston service.[4]

On April 1, 1976, Amtrak acquired the New Haven–Springfield Line from the newly formed Conrail, along with most of the Northeast Corridor, the Keystone Corridor, and several other lines.{{citation needed|date=February 2016}}

During the mid-1980s, due to the high cost of operating the New Haven–Springfield Line and the competing newly-constructed expressways, Amtrak removed {{convert|25|mi}} of track, turning the line from a double-track line to a line with a single track with passing sidings.[5][6] Of the {{convert|62|mi}} between New Haven and Springfield, {{convert|23.3|mi}} of double track and {{convert|38.7|mi}} of single track were left.[7]

The final iteration of Inland Route service began with the November 10, 1996, timetable, with the extension of the daily Virginia Service train 85/86 to Boston via Springfield. That train was later truncated, and the former Washington–Boston Bay State was reinstated via the Inland Route.[8] By the October 28, 2002 schedule, trains 140 (weekend) and 142 (weekday) provided northbound Inland Route service, while the only weekend service was provided southbound via the 147. Train 142 was dropped October 27, 2003, and the November 1, 2004 timetable dropped 140 and 147, ending the use of the Inland Route.{{citation needed|date=February 2016}}

On May 22, 2012, construction started on the CTfastrak busway between New Britain and Hartford in the northern two track slots between Hartford and {{cdots|Newington Junction}}.[9] The southern two track slots are used for the active double-track rail line. Any future re-addition of a third or fourth track would require removing or relocating the busway.

The connection between a new double track section from Hartford to Windsor and an existing section from north of Windsor to south of Windsor Locks was completed on September 25, 2018, leaving less than {{convert|12|mi|spell=in}} of single track on the line.[10][10] The new section was not expected to allow additional service, but to increase reliability.[11]

Interstate 84

One proposal to replace the aging Interstate 84 viaduct through Hartford as part of the I-84 Hartford Project is an at-grade roadbed, which would require relocating the rail tracks and busway north of the new road. The viaduct crosses the tracks and busway twice, a route dictated by the placement of abutting development back when the viaduct was constructed in the 1960s. Subsequent demolition has made the proposal to move the tracks a viable option to consider.[12]

Shuttles

{{main|New Haven–Springfield Shuttle}}

Amtrak runs Shuttles between Springfield, Massachusetts, and New Haven, Connecticut. These trains connect with Northeast Regional or Metro-North New Haven Line service at New Haven's Union Station, usually by a cross-platform or same-track transfer. Shuttles are in the 400 series, with the last two digits usually denoting the number of the Amtrak train it is connecting to.[13][14]

Hartford Line

{{main|Hartford Line}}

The Connecticut Department of Transportation (ConnDOT) and the Massachusetts Executive Office of Transportation studied adding a dedicated New Haven–Hartford–Springfield Commuter Rail Line between New Haven and Springfield to create a more accessible commuter connection to the Metro North commuter lines between New York City and Southwestern Connecticut, and also give more transit options to people commuting within the Knowledge Corridor region surrounding Hartford and Springfield. As part of this, extending or adding stations and right of way and new rail options were investigated. The study culminated in a final report in 2005, which was presented for a grant application to the Federal Transit Administration New Starts program.[15]

Construction added {{convert|27|mi}} of double track[16][17] as well as {{Convert|2|mi}} of new passing sidings, leaving less than {{Convert|12|mi}} of single track.[10] Five new interlockings were built and new signal systems were installed, including the installation of Positive Train Control. Bridges and culverts on the line have been repaired, rehabilitated or replaced. Stations at {{cdots|Wallingford}}, {{cdots|Meriden}}, and {{cdots|Berlin}} were completely rebuilt, while {{cdots|New Haven State Street}} and {{cdots|Hartford}} had improvements made.[17]

New Hartford Line commuter rail service on the line began on June 16, 2018.[18] Expanded Amtrak Shuttle service on the line launched one week earlier on June 9, 2018.[19] Connecticut DOT provides eight round trip commuter trains on weekdays under its new CTrail branding that are operated by its new contractor, a joint venture between TransitAmerica Services and Alternate Concepts Inc.[20] Half of these trains operate between New Haven and Hartford, with the other four running the whole line between New Haven and Springfield.[13] Amtrak has added three new Shuttle round trips on top of its previous service. This brings the total round trips on the line to sixteen between New Haven and Hartford, with twelve of them operating along the full line to Springfield. On weekends and holidays, CTrail operates four New Haven–Hartford round trips and three New Haven–Springfield round trips. Amtrak continues to offer its existing weekend service with some minor schedule changes. Together, twelve–thirteen round trips are offered on weekends.[13]

Stations

Milepost[21]StateTown/CityStation[22]Connections[23][22][24][25]
0MASpringfieldSpringfield Union Station Amtrak: Lake Shore Limited, New Haven–Springfield Shuttle, Northeast Regional, Vermonter
CTrail: Hartford Line
{{bus icon}} PVTA Bus: 1, 2, 3, 4, 5, 6, 7, 10, 11E, 12E, 14, 17, 20, 20E, 21, 21E, 92
14.6CTWindsor LocksWindsor Locks}}Amtrak: New Haven–Springfield Shuttle, Northeast Regional, Vermonter
CTrail: Hartford Line
{{bus icon}} CTtransit Hartford: 905W
Bradley International Airport, {{Convert>3|mi|km}} NW
19.1WindsorWindsor, CT}} Amtrak: New Haven–Springfield Shuttle, Northeast Regional
CTrail: Hartford Line
{{bus icon}} CTtransit Hartford: 32, 34, 36
25.3HartfordHartford Union Station Amtrak: New Haven–Springfield Shuttle, Northeast Regional, Vermonter
CTrail: Hartford Line
{{bus icon}} CTtransit Hartford: 30, 60, 62, 64, 66, 72, 74, 76, 82, 83, 84, 901, 903, 904, 905, 906, 907, 910, 913, 914, 918, 921, 950, dash
{{bus icon}} CTfastrak: 101, 102, 128, 923, 924, 925, 928
35.9BerlinBerlin}} Amtrak: New Haven–Springfield Shuttle, Northeast Regional
CTrail: Hartford Line
{{bus icon}} CTtransit New Britain: 512
43.3MeridenMeriden}} Amtrak: New Haven–Springfield Shuttle, Northeast Regional, Vermonter
CTrail: Hartford Line
{{bus icon}} CTtransit Hartford: 919
{{bus icon}} CTtransit New Haven: 215M
{{bus icon}} CTtransit Meriden: 561, 563, 564, 565, 566
{{bus icon}} Middletown Area Transit: M-Link
49.0WallingfordWallingford}} Amtrak: New Haven–Springfield Shuttle, Northeast Regional
CTrail: Hartford Line
{{bus icon}} CT Transit New Haven: 215M/W
{{bus icon}} CT Transit Wallingford: 292
61.4New HavenState Street CTrail: Hartford Line, Shore Line East
Metro-North Railroad: New Haven Line
Amtrak: New Haven–Springfield Shuttle
{{bus icon}} CT Transit New Haven
62.0Union Station Amtrak: Acela Express, New Haven–Springfield Shuttle, Northeast Regional, Vermonter
CTrail: Hartford Line, Shore Line East
Metro-North Railroad: New Haven Line
{{bus icon}} CT Transit New Haven: 271, 272, 278, 950, Union Station Shuttle
{{bus icon}} Megabus
{{bus icon}} Greyhound Lines
{{bus icon}} Megabus
{{bus icon}} Peter Pan Bus Lines
{{bus icon}} Yale University Shuttle

The Springfield–New Haven corridor is served by some Northeast Regional trains in the 136 and 140 series. These trains run from Springfield all the way to Washington, D.C., without the need to change trains. The corridor is also served by Amtrak's Vermonter. All of the Shuttle and Regional trains stop at all stations on the line, while the Vermonter skips {{amtk|New Haven State Street}}, {{amtk|Wallingford}}, {{amtk|Berlin}}, and {{amtk|Windsor, CT}}.

References

1. ^{{Cite press release |url=http://www.ct.gov/dot/cwp/view.asp?A=1373&Q=603150 |title=AMTRAK RUNS TEST TRAINS OF UP TO 110 MPH IN PREPARATION FOR THE LAUNCH OF THE HARTFORD LINE ON JUNE 16 |date=June 6, 2018 |access-date=June 17, 2018 |publisher=Connecticut Department of Transportation}}
2. ^{{Cite web |url=http://www.masslive.com/news/index.ssf/2014/12/first_passenger_train_in_a_gen.html |title=First passenger train in a generation stops at Northampton as new Amtrak service begins}}
3. ^{{Cite web |url=http://www.courant.com/news/connecticut/hc-hartford-line-opens-20180615-story.html |title=Thousands Take A Free Ride On Hartford Line's Inaugural Run |last=Porter |first=Mikaela |last2=Owens |first2=David |website=Hartford Courant |date=June 17, 2018 |access-date=June 17, 2018}}
4. ^{{Cite web |url=http://allaboardohio.org/2015/10/31/amtraks-lake-shore-ltd-turns-40/ |title=Amtrak’s Lake Shore Ltd turns 40! |last=Wicker |first=Tom |date=October 31, 2015 |website=All Aboard Ohio |access-date=April 9, 2018}}
5. ^{{Cite web |url=http://www.nhhsrail.com/objectives/history.aspx |title=Objectives & Scope |website=New Haven–Hartford–Springfield Rail Program |publisher=Connecticut Department of Transportation |access-date=July 1, 2018}}
6. ^{{Cite book |title=The Rail Lines of Southern New England |last=Karr |first=Ronald Dale |publisher=Branch Line Press |year=1995 |isbn=0942147022 |page=78}}
7. ^{{Cite magazine |title=Connecticut: New Travel Options for the Northeast Region |date=June 2018 |url=http://www.apta.com/resources/hottopics/highspeedrail/Documents/SPEEDLINES_June2018.Final.pdf |magazine=SPEEDLINES |publisher=High-Speed Intercity Passenger Rail Committee |issue=23 |page=20 |access-date=July 1, 2018}}
8. ^{{Cite news |title=Amtrak says: Riders wanted; Lack of support may derail trains |last=Kush |first=Bronislaus B |date=December 28, 1996 |work=Telegram & Gazette |page=A1}}
9. ^{{Cite web |url=http://articles.courant.com/2012-05-22/news/hc-busway-0523-20120522_1_busway-ctfastrak-dannel-p-malloy |title=Busway: After More Than 12 Years, Work Starts In Earnest On Busway |website=Hartford Courant}}
10. ^{{cite press release |url=https://www.ct.gov/dot/cwp/view.asp?A=1373&Q=605158 |title=CTDOT ANNOUNCES COMPLETION OF A SECOND RAIL TRACK ON THE CTrail HARTFORD LINE BETWEEN HARTFORD AND WINDSOR |publisher=Connecticut Department of Transportation |date=September 25, 2018 |access-date=September 25, 2018}}
11. ^{{Cite news |url=http://www.courant.com/business/hc-biz-hartford-line-windsor-20180611-story.html |title=Despite New Commuter Line, Rail Upgrades Lag North Of Hartford |first=Rebecca |last=Lurye |newspaper=Hartford Courant |date=June 12, 2018 |access-date=September 25, 2018}}
12. ^{{Cite web |url=http://i84hartford.com/analysis |title=Alternatives Analysis |website=I-84 Hartford Project |publisher=Connecticut Department of Transportation |access-date=January 4, 2018}}
13. ^{{Cite web |url=http://www.hartfordline.com/pdf/2018_nov12_schedule_printable.pdf |title=CTrail Hartford Line Schedules: Effective November 12, 2018 |date=November 12, 2018 |access-date=November 11, 2018 |website=Hartford Line}}
14. ^{{Cite web |url=https://www.amtrak.com/content/dam/projects/dotcom/english/public/documents/timetables/Northeast-Schedule-W04-111218.pdf |title=Northeast Corridor Boston/Springfield–Washington Timetable |website=Amtrak |date=November 12, 2018 |access-date=February 25, 2019}}
15. ^{{Cite web |url=http://www.ct.gov/dot/lib/dot/documents/dpolicy/nhr/docs/Recommended_Action_1.pdf |title=New Haven Hartford Springfield Commuter Rail Implementation Study: Recommended Action |website=Connecticut Department of Transportation |access-date=April 9, 2018}}
16. ^{{Cite web |url=http://www.nhhsrail.com/pdfs/winter%202018%20final%20draft.pdf |title=Winter 2018 Newsletter |date=January 17, 2018 |website=NHHS Rail Program |access-date=January 17, 2018}}
17. ^{{Cite web |url=http://hartfordline.com/about/ |title=What the Hartford Line Brings to Customers |website=Hartford Line |date=2018 |access-date=May 19, 2018}}
18. ^{{Cite web |url=http://www.courant.com/news/connecticut/hc-hartford-line-opens-20180615-story.html |title=Thousands Take A Free Ride On Hartford Line's Inaugural Run |last=Porter |first=Mikaela |last2=Owens |first2=David |date=June 17, 2018 |access-date=June 18, 2018}}
19. ^{{Cite news |url=https://www.progressiverailroading.com/passenger_rail/news/Connecticut-DOT-gears-up-for-Hartford-Line-testing--54827 |title=Connecticut DOT gears up for Hartford Line testing |date=June 6, 2018 |access-date=June 6, 2017}}
20. ^{{Cite web |url=http://portal.ct.gov/Office-of-the-Governor/Press-Room/Press-Releases/2017/07-2017/Gov-Malloy-Announces-TransitAmerica-Services-and-Alternate-Concepts-Selected-for-the-Hartford-Line |title=Gov. Malloy Announces TransitAmerica Services and Alternate Concepts Selected as Service Provider for the Hartford Line |website=The Office of Governor Dannel P. Malloy |publisher=Connecticut DOT |access-date=July 24, 2017}}
21. ^{{Cite web |url=http://www.nhhsrail.com/pdfs/ea/executive_summary.pdf |title=Executive Summary |publisher=Connecticut Department of Transportation |access-date=June 4, 2018 |page=4}}
22. ^{{Cite web |url=http://www.hartfordline.com/route_stations/stations.aspx |title=Stations |website=Hartford Line |access-date=February 25, 2019}}
23. ^{{Cite web |url=https://www.amtrak.com/content/dam/projects/dotcom/english/public/documents/timetables/Northeast-Schedule-W04-111218.pdf |title=Northeast Corridor Boston/Springfield–Washington Timetable |website=Amtrak |date=November 12, 2018 |access-date=February 25, 2019}}
24. ^{{Cite web |url=http://web.mta.info/mnr/html/planning/schedules/pdf/NH_SS_Sept30_2018_JAN2019_REVISED_EDITION.pdf |title=Metro-North New Haven Line Timetable |website=Metro-North Railroad |date=January 22, 2019 |access-date=February 25, 2019}}
25. ^{{cite web |url=https://shorelineeast.com/images/docs/SLE-Timetable.pdf |title=Shore Line East Rail Service Information |website=Shore Line East |date=January 22, 2019 |access-date=February 25, 2019}}

Notes

  • Mike Schafer, Amtrak's atlas, Trains June 1991
  • Scanner, Trains February 1997

External links

{{commons category|New Haven–Springfield Line}}
  • New Haven–Hartford–Springfield Rail Program
  • Hartford Line
  • New Haven–Hartford–Springfield Track Chart
{{Connecticut transit|state=collapsed}}{{Higher-speed rail|state=collapsed}}{{DEFAULTSORT:New Haven-Springfield Line}}

5 : New York, New Haven and Hartford Railroad lines|New Haven–Springfield Line|Rail infrastructure in Connecticut|Rail infrastructure in Massachusetts|Railway lines in the United States

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/14 3:49:11