词条 | Węgliniec–Roßlau railway | ||||||||||||||||||||
释义 |
| name = Węgliniec–Roßlau (Elbe) railway | routenumber = 216, 228, 229 | linenumber = * 6207 (Germany)
| linelength_km = 233.2 | gauge = {{Track gauge|sg|allk=on}} |electrification = * Horka–Roßlau: 15 kV/16.7 Hz AC catenary
| maxincline = 0.07% | minradius = {{convert|470|m|ft|0|abbr=on}} | speed={{convert|120|km/h|mph|1|abbr=on}} (maximum) | tracks = 2 | image = Map-of-295-and-6207-Węgliniec-Roßlau.png | image_width = 300px | caption = Węgliniec–Roßlau railway with a short section in Western Poland (red) and a longer section in Southeastern Germany (orange) | locale = Germany and Poland | map ={{Routemap|inline=1|title =no |footnote=Source: German railway atlas[1]|map= STR~~ ~~ ~~From Wrocław ABZg+l~~ ~~ ~~From Lubań BHF~~0.523~~{{BSto|{{rws|Węgliniec}}|formerly Kohlfurt}}~~island station~~189 m eABZgl~~ ~~ ~~To Czerwona Woda ABZgr~~ ~~ ~~To Żary ABZgl~~ ~~ ~~To Görlitz eBST~~3.32~~Block Hartmannseichen eHST~~6.623~~Szklenice~~formerly Glaserberg eBST~~10.60~~Block Stojanów~~formerly Penzighammer eHST~~12.540~~Bielawa Dolna~~formerly Niederbielau hKRZWae!~lZOLL~~13.424~~ ~~{{BSsplit|Poland|Germany|line=1|align=right}} Lusatian Neisse (100 m) eDST~~15.15~~Zentendorf~~until 1930 ABZg+r~~ ~~ ~~From Przewóz DST~~21.31~~Horka freight yard~~ ~~165 m ABZgr~~ ~~ ~~Connecting line to Horka Pbf eHST~~22.81~~{{stn|Horka}}~~(passage to Horka station)~~171 m KRZo~~ ~~ ~~Berlin Görlitzer Bf–Görlitz WBRÜCKE2~~23.1~~ ~~Weißer Schöps (12 m) WBRÜCKE2~~23.7~~ ~~Neugraben (14 m) ABZg+l~~ ~~ ~~Connecting line from Mückenhain junction BST~~23.745~~Särichen junction BHF~~27.80~~{{rws|Niesky}}~~ ~~171 m eBST~~31.79~~Block Moholz~~170 m HST~~33.82~~{{rws|Petershain}}~~ ~~160 m BHF~~36.86~~{{rws|Mücka}}~~ ~~148 m WBRÜCKE2~~37.44~~ ~~Schwarzer Schöps (10 m) eBST~~43.3~~Block Tauer~~142 m BHF~~45.84~~{{rws|Klitten}}~~ ~~131 m eDST~~49.10~~Uhyst Vorbf~~ ~~132 m WBRÜCKE2~~51.30~~ ~~Spree (40 m) ABZg+r~~ ~~ ~~From Boxberg BHF~~52.02~~Uhyst~~ ~~132 m KMW~~52.56~~ ~~Beginning of the 1962 realignment WBRÜCKE2~~59.55~~ ~~Kleine Spree (16 m) BHF~~60.40~~Lohsa~~since 1962~~125 m KMW~~{{BSsplit|61.66|60.06|line=1|align=right}}~~ ~~km change +1,600 km eBHF~~60.13~~Lohsa~~until 1962~~125 m eKRZo~~60.8~~ ~~Lusatian mining railway eKRZo~~63.13~~ ~~Weißkollm–Königswartha eABZg+r~~ ~~ ~~From Sornoer Buden junction ABZg+l~~ ~~ ~~From Bautzen eKRZo~~64.5~~ ~~Lusatian mining railway DST~~66.17~~Knappenrode~~formerly Werminghoff~~123 m eBST~~68.75~~Block Groß Zeißig~~120 m HST~~70.15~~Hoyerswerda-Neustadt~~ ~~119 m WBRÜCKE2~~70.9~~ ~~Schwarzwasser (30 m) WBRÜCKE2~~71.9~~ ~~Black Elster (27 m) eABZg+l~~ ~~ ~~From Bautzen BHF~~72.76~~{{rws|Hoyerswerda}}~~ ~~118 m eABZgr~~ ~~ ~~To Neupetershain BHF~~79.68~~Schwarzkollm~~ ~~118 m HST~~82.56~~Lauta (Niederlausitz)~~ ~~125 m DST~~83.74~~Lauta (Niederlausitz) Bbf~~ ~~126 m eBST~~84.47~~Block Lauta STR+GRZq~~ ~~ ~~{{BSsplit|Saxony|Brandenburg|line=1|align=right}} state border ABZg+l~~ ~~ ~~From Kamenz (Sachs) TBHFxu~~87.91~~{{BSto|{{stn|Hosena}}|(formerly Hohenbocka)}}~~Lübbenau–Kamenz~~109 m ABZgr~~ ~~ ~~To Lübbenau eHST~~Schwarzbach (b Ruhland) ABZg+r~~ ~~ ~~From Cottbus BHF~~98.32~~{{stn|Ruhland}}~~ ~~99 m ABZgl~~ ~~ ~~To Großenhain Cottb Bf WBRÜCKE2~~ ~~ ~~Black Elster eHST~~Lauchhammer Süd BHF~~109.0~~{{BSto|Lauchhammer|formerly Lauchhammer West}} HST~~117.8~~Plessa eHST~~Kahla (Oberlausitz) KRZo~~ ~~ ~~Berlin–Dresden BHF~~124.7~~Elsterwerda-Biehla~~(Keilbahnhof) ABZgl~~ ~~ ~~Connecting line to Elsterwerda eHST~~Haida (Oberlausitz) eHST~~130.0~~Zeischa BHF~~134.6~~Bad Liebenwerda WBRÜCKE2~~ ~~ ~~Black Elster eBHF~~139.3~~Wahrenbrück WBRÜCKE2~~ ~~ ~~Ditch eHST~~Beiersdorf (b Bad Liebenwerda) ABZgr+r~~ ~~ ~~From Cottbus ABZg+l~~ ~~ ~~From Röderau Bogendreieck junction TBHFu~~148.2~~{{stn|Falkenberg (Elster)}}~~Halle–Cottbus ABZgr~~ ~~ ~~To Jüterbog ABZgr~~ ~~ ~~To Luckau-Uckro eHST~~153.7~~Beyern SBRÜCKE~~ ~~ ~~Bundesstraße 87 BHF~~156.5~~Fermerswalde STR+GRZq~~ ~~ ~~{{BSsplit|Brandenburg|Saxony|line=1|align=right}} state border eABZg+l~~ ~~ ~~From Prettin BHF~~170.1~~Annaburg WBRÜCKE1~~ ~~ ~~Black Elster BHF~~179.1~~Jessen (Elster) eABZg+nl~~ ~~ ~~Company siding BHF~~189.0~~Elster (Elbe) eABZg+nr~~ ~~ ~~Company siding HST~~195.1~~Mühlanger~~formerly Prühlitz HST~~199.2~~{{BSto|Lutherstadt Wittenberg-Labetz|formerly Wendel}} ABZg+r~~ ~~ ~~From Berlin BHF~~201.9~~{{stn|Lutherstadt Wittenberg}} ABZgl~~ ~~ ~~To Halle (Saale) HST~~203.7~~{{BSto|Lutherstadt Wittenberg Altstadt|formerly LW Elbtor}} SBRÜCKE~~ ~~ ~~Bundesstraße 2 ABZgr~~ ~~ ~~To Straach BHF~~206.1~~{{BSto|Lutherstadt Wittenberg West|formerly Klein Wittenberg}} eABZg+r~~ ~~ ~~From Straach ABZg+nr~~ ~~ ~~Company siding ABZg+nr~~ ~~ ~~SKW GmbH port siding ABZg+nr~~ ~~ ~~Melamine works siding BHF~~208.3~~Lutherstadt Wittenberg-Piesteritz ABZg+nr~~ ~~ ~~SKW northern siding ABZg+nl~~ ~~ ~~SKW nitrogen works siding ABZg+nl~~ ~~ ~~PCI Augsburg siding eHST~~210.3~~Apollensdorf HST~~212.1~~Griebo HST~~216.7~~Coswig (Anh) Hp SBRÜCKE~~ ~~ ~~Bundesstraße 187a eABZg+nl~~ ~~ ~~Former match factory siding DST~~217.6~~Coswig (Anh) freight yard eABZg+nr~~ ~~ ~~Coswig port siding ABZgnl~~ ~~ ~~Commercial zone siding BRÜCKE1~~ ~~ ~~Bundesautobahn 9 HST~~222.7~~Klieken BST~~229.3~~Roßlau (Elbe) junction Aw ABZgr~~ ~~ ~~To Roßlau (Elbe) freight yard ABZg+r~~ ~~ ~~From Wiesenburg BST~~Roßlau Ra HST~~231.2~~Meinsdorf WBRÜCKE2~~ ~~ ~~Rossel ABZgr+r~~ ~~ ~~From and to Trebnitz (Magdeburg) SBRÜCKE~~ ~~ ~~Bundesstraße 184 BHF~~233.7~~{{stn|Roßlau (Elbe)}} STR~~ ~~ ~~To Leipzig Hbf }} }} The Węgliniec–Roßlau (Elbe) railway is a mainline railway in Poland and the German states of Saxony, Brandenburg and Saxony-Anhalt, originally built by the Berlin-Anhalt Railway Company and the Upper Lusatian Railway Company as part of the trunk line from Breslau (now Wrocław) to Magdeburg. It runs from Węgliniec (formerly Kohlfurt) via Niesky, Hoyerswerda, Falkenberg (Elster) and Wittenberg to Roßlau (Elbe). The line is sometimes called the Niederschlesische Gütermagistrale (Lower Silesian freight trunk line) because it provides a direct connection from the province of Lower Silesia to Central Germany. The western section of the line is one of the oldest lines in Germany. HistoryThe Berlin-Anhalt Railway Company ({{lang-de|Berlin-Anhaltische Eisenbahn-Gesellschaft}}, BAE) was one of the major railway companies in Germany for more than four decades during the 19th century. Apart from the Anhalt trunk line, during this period it built a network of important railway connections between Berlin and the northern part of the Kingdom of Saxony, the Prussian province of Saxony and the Duchy of Anhalt, which eventually included a length of approximately 430 kilometres. Planning and constructionThe Wittenberg–Dessau section was part of the original route of the Anhalt line. Between Dessau and Coswig (Anhalt), the line was opened on 18 August 1841 and the section between Wittenberg and Coswig (Anhalt) followed on August 28 of the same year. On 10 September 1841, traffic began to run between Berlin and Köthen. The construction of new routes by the BAE, along with the growth of competing railway networks, forced constant adjustments to rail services to respond to changing demand . After the construction of the direct route from Wittenberg to Bitterfeld, the importance of the Wittenberg–Dessau–Köthen section declined. The Upper Lusatian Railway Company (Oberlausitzer Eisenbahn-Gesellschaft) opened the line between Kohlfurt and Falkenberg on 1 June 1874. The gap between Falkenberg and Wittenberg was opened by the BAE on 15 October 1875. The Upper Lusatian Railway Company transferred the management of its section of the route to the BAE in 1878. The line was nationalised on 1 May 1882 and became part of the Prussian state railways. Second World WarOn 20 April 1945, there was an air raid on Piesteritz station, which blew up several wagons and also caused significant damage to a nitrogen plant. The explosion was so powerful that the wheels and axles of a tank wagon were hurled 500 metres to the present federal highway 187.[2] After the Second World WarAfter the end of the Second World War, the line was divided by the Oder-Neisse line; the railway node of Kohlfurt became part of Poland and was renamed Węgliniec. The cross-border route has remained of importance for freight, but there was no longer any passenger transport between Horka station and Węgliniec station after 1945. In 1946, the second track on sections of the line were dismantled.[3] The stations lying in area where the Sorbian language is spoken received additional signs in the Sorbian language. These names were now also listed in the timetable of Deutsche Reichsbahn.
In the early 1960s, the line was realigned between Uhyst and Lohsa because of the expansion of the Lohsa open cut mine. The new line was opened on 11 January 1962. The line between Knappenrode and Falkenberg/Elster was electrified in the 1980s to serve the heavy coal traffic. Electric rail operations began between Hohenbocka and Ruhland and between Knappenrode and Hohenbocka on 19 December 1987 and on 1 April 1988. There was a collision of a Polish freight train and a Deutsche Reichsbahn train on 3 December 1988, close to the state border between the stations of Horka, East Germany, and Bielawa Dolna, Poland. Here, five German and three Polish railway workers were killed and three other railway workers were seriously injured. Passenger services between Horka and Niesky had always been of minor importance only and the last class 771 railbus ran on 14 December 2002, after a rail replacement bus service had already been operated for a few weeks. Extensive renovation has been carried out since 2009, including a major renovation of the track and overhead line equipment from the Roßlau/Dessau railway transport hub. As part of this project, the modernisation of the railway stations of Roßlau, Coswig, Wittenberg-Piesteritz and Wittenberg-West is planned during the next few years. In 2010, a regular service ran again between Horka and Hoyerswerda, hauled by a class 50 steam locomotive.[4] The {{rws|Klitten}}–{{rws|Hoyerswerda}} section has been blocked since 12 December 2010, while the Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft (Lusatian and Central German Mining Administration Company, LMBV) re-inforces the eastern embankment of the Silbersee (Silver Lake) in the area around Lohsa station. During the stabilisation work there is an increased risk, so that the line, which runs directly along the eastern shore, cannot currently be used. Freight trains are rerouted via Weißwasser, Knappenrode, Spremberg and Cottbus. In passenger traffic, the Görlitz–Niesky–Hoyerswerda service, which is operated by Ostdeutsche Eisenbahn (ODEG), runs only to Horka; between Horka and Hoyerswerda additional buses run as a rail replacement service. The end of the stabilisation work has been delayed from late 2012 to 2014, after a 200 metre long section of the bank slipped on 8 March 2012 during the remedial work.[3] Route development between the Polish border and KnappenrodeBecause of the ever increasing volumes of freight traffic, the full doubling and electrification of the line was agreed on the section between the Polish border and Knappenrode in December 2001. A project with this objective, along with a planned maximum speed of 120 km/h, was included in the Bundesverkehrswegeplan (Federal Transport Infrastructure Plan) of 2003 and included in the Bedarfsplan Schiene (“rail demand plan”, which was added as an annex to the Federal Railway Infrastructure Expansion Act). The planning approval process for the 52 kilometre commenced in 2009. In the spring of 2012, the necessary funding agreement to develop the line was signed between the federal government and Deutsche Bahn. The construction was scheduled to start in early September 2012 with the rebuilding of Knappenrode station and doubling of the line would start at the end 2013 and was planned to be completed by the end of 2016. The total investment would be about €420 million. The stations of Lohsa, Uhyst, Klitten, Mücka and Petershain are to be rebuilt with two platforms and at Niesky station two new platforms and a pedestrian tunnel will also be built. Five electronic interlocking systems are to be built and the route across the border will be equipped with European Train Control System. Noise barriers are to be installed on 16 kilometres of the line.[3] Work on route development began with the renovation of Knappenrode station in 2012. The new overhead line in the station was energised on 1 October. With the commissioning of a new electronic interlocking system at the station, the renovation is to be completed in the spring of 2014. A synchronous converter has been under construction in Lohsa and a transformer in Ruhland for the traction power supply since the spring of 2013. The Federal Railway Authority gave planning approval for the Horka freight yard–German/Polish border section in August 2013. The construction work on this section will begin in March 2014 and is expected to last two years.[5] Funding is provided by the Federal Republic of Germany under the Federal Railway Expansion Act (Bundesschienenwegeausbaugesetz) with co-financing by the European Union. On 7 June 2012, a financing agreement was signed between the Free State of Saxony and Deutsche Bahn, using state funds of €1.6 million and in accordance with relevant provisions in the state’s development plan, to increase the line speed on the Horka–Niesky–Knappenrode section to 160 km/h from the current 120 km/h in order to attract patronage for passenger transport services.[6] At the same time the Neisse bridge will also be rebuilt by the Polish State Railways. Due to the upgrading measures, the line capacity will be increased from 50 to 180 trains (of which 160 are freight trains) per day. The line upgrade on the Polish section from Węgliniec to the Neisse bridge was completed on 23 March 2006. Both the newly built second track and the electric catenary end on the bridge. The German section of the development work began in December 2012 with the renovation of the superstructure and the conversion of the overhead line by Deutsche Bahn construction on the line between Knappenrode and Spreewitz (the remaining part of the Knappenrode–Sornoer Buden mining railway). From mid-2013, electrically operated trains could run to Spreewitz again. The upgrade will restore four of the seven tracks and two sidings in Knappenrode station. The completion of the upgrade will be delayed to 2016 due to problems with the embankment of the Silbersee. OperationsPassengersCurrently, this route is served by DB Regio Regionalbahn trains running between Dessau and Falkenberg. The trains take around 80 minutes to cover the approximately 91 km long line and run hourly. In the peak hour additional services run on the line between Dessau Hbf and Lutherstadt Wittenberg and serve only some of the stations. Since the timetable change in December 2011, some services end in Lutherstadt Wittenberg or Annaburg due to low demand. Services are provided by push-pull trains consisting of Class 143 locomotives and at least two double-deck coaches, including a double-deck driving coach. Services have been operated since 15 December 2013 between Falkenberg (Elster) and Hoyerswerda on the new S-Bahn line S4 of the Mitteldeutschland S-Bahn with Bombardier Talent 2 railcars at two-hour intervals. In addition, Regionalbahn trains to Cottbus operate between Falkenberg and Ruhland and Regional-Express trains to Dresden operate between Ruhland and Hoyerswerda, which connect with each other in Ruhland and thus provide a nearly hourly service of the section from Falkenberg to Hoyerswerda. Freight trafficThe line is also important for freight transport. That line carries frequent services to the Piesteritz nitrogen works (Stickstoffwerke Piesteritz) in Wittenberg, using an extensive network of freight rail facilities. In addition, the line is being developed to play an important role in international freight services to Poland. Once construction work is completed, it is one of the most important corridors for freight between Eastern and Western Europe.[7][8] In the spring of 2011, the siding the PCI Augsburg company was reactivated with new track and the old track was dismantled. The siding is at the western end of the freight depot of the Stickstoffwerke Piesteritz Piesteritz works. {{clear}}Stations
References1. ^{{cite book|title=Eisenbahnatlas Deutschland (German railway atlas) |publisher= Schweers + Wall | year= 2009 |isbn= 978-3-89494-139-0|pages=46–7, 49, 59–61}} 2. ^{{cite web|url=http://www.dchm.de/index.php?id=34 |title=Deutsches Chemie-Museum Merseburg: Wittenberg/Piesteritz |accessdate=10 August 2014|language=German}} 3. ^1 2 {{cite journal|title=Knappenrode–Horka–Grenze zu Polen wird endlich ausgebaut |journal=Signal |issue=3 |year=2012 |page=5|language=German}} 4. ^{{cite news|url=http://www.lr-online.de/regionen/hoyerswerda/Private-Dampflok-darf-noch-mal;art1060,2921134 |title=Privatlok darf noch mal |newspaper=Lausitzer Rundschau |date=26 May 2010 |accessdate=10 August 2014 |language=German}} 5. ^{{cite press release |url=http://www.deutschebahn.com/de/presse/presseinformationen/pi_it/4386080/ubd20130830a.html |archive-url=https://web.archive.org/web/20140104042802/http://www.deutschebahn.com/de/presse/presseinformationen/pi_it/4386080/ubd20130830a.html |archive-date=4 April 2014 |title=Grünes Licht für weiteren Bauabschnitt beim Ausbau der Bahnstrecke Knappenrode – Horka |publisher=Deutsche Bahn AG |date=30 August 2013 |accessdate=10 August 2014 |language=German}} 6. ^{{cite web|url=http://www.newstix.de/?session=&site=actual&startentry=10&entmsg=true&mid=18503| date=7 June 2012|title=Rekordinvestitionen im Freistaat Sachsen: DB investiert rund 12 Millionen Euro in neues IC-Werk in Leipzig und 2,3 Milliarden Euro in sächsisches Schienennetz |publisher=News Tix|accessdate=10 August 2014|language=German}} 7. ^{{cite press release|url=http://www.deutschebahn.com/de/konzern/bauen_bahn/aus_und_neubauprojekte/knappenrode__horka/projekt.html |title=Deutsche Bahn: Internationaler Güterverkehr wird beschleunigt |archive-url=https://web.archive.org/web/20141212055700/http://www.deutschebahn.com:80/de/konzern/bauen_bahn/aus_und_neubauprojekte/knappenrode__horka/projekt.html |archive-date=12 December 2014 |date=8 July 2014 |accessdate=10 August 2014 |language=German}} 8. ^{{cite news |url=http://www.lr-online.de/nachrichten/wirtschaft/Impulse-fuer-die-Guetermagistrale-Wroclaw-Berlin;art1067,2647538 |author= Harry Müller |title=Impulse für die Gütermagistrale Wroclaw-Berlin |newspaper= Lausitzer Rundschau |date= 19 August 2009 |accessdate=10 August 2014|language=German}} External links
6 : Railway lines in Poland|Railway lines in Brandenburg|Railway lines in Saxony|Railway lines in Saxony-Anhalt|Railway lines opened in 1841|1841 establishments in Germany |
||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。