词条 | Newport railway station |
释义 |
| symbol = rail | name = Newport | other_name = {{lang-cy|Casnewydd}} | code = NWP | dft_category = B | manager = Transport for Wales | locale = Newport | borough = Newport
Newport railway station ({{lang-cy|Casnewydd}}) is the third-busiest station in Wales (after Cardiff Central and Cardiff Queen Street), situated in Newport city centre. It is {{convert|133.5|miles|km|0}} from London Paddington on the British railway network. The station was originally opened in 1850 by the South Wales Railway Company and was greatly expanded in 1928. A new station building was built in 2010 with four full size platforms, to facilitate new Great Western Railway 10-car Intercity Express Programme trains. The station is owned by Network Rail and managed by Transport for Wales. The main station entrance is located on Queensway, connected by Station Approach to the High Street, with a further entrance adjoined to the National Car Parks site at its rear, reached from Devon Place. ServicesAs at February 2019, the station is a calling point for services by Transport for Wales, as well as GWR and CrossCountry. Transport for Wales
In October 2008 the Welsh Government announced the launch of a new faster services between Cardiff and North Wales. The service was first operated by {{brc|57}} locomotives and Mark 2 passenger rolling stock. The Premier Service has premier business-class accommodation.[3] In March 2012 the service was upgraded to {{brc|67}} locomotives and Mark 3 rolling stock. CrossCountry
Great Western Railway
Ebbw Vale servicesPhase Two of the Ebbw Valley Railway project would see the restoration of direct trains between Newport and Ebbw Vale and resurrect the suburban rail link with Rogerstone. In March 2008 following the success of phase one - direct services between Cardiff Central and Ebbw Vale - the Welsh Government's Minister for Economy and Transport launched a feasibility study into the restoration of direct trains from Newport. Significant works need to be carried out including the re-instatement of a set of points, refurbished track, new signals at the Gaer and Park junctions as well as track extensions between Crosskeys and Llanhilleth. The Welsh Government announced in July 2009 that the relevant works to enable direct trains between Ebbw Vale and Newport would be complete by 2011.[8] After securing the Wales & Borders franchise in 2018, Transport for Wales announced that services will reopen between Newport and Ebbw Vale Parkway by 2021.[9] {{rail start}}{{rail line one to two three routes|previous=Cardiff Central|next1=Severn Tunnel Junction|next2=Cwmbran |route1=Transport for WalesMaesteg / Cardiff Central - Cheltenham Spa |route2=Transport for Wales Milford Haven/Carmarthen - Manchester Piccadilly|route3=Transport for Wales Cardiff - Holyhead |col={{KAW colour}} |lightcol1={{CV colour|Cheltenham}} }}{{rail line one to two|previous=Cardiff Central|next1=Severn Tunnel Junction or Chepstow|next2=Severn Tunnel Junction|route1=CrossCountry Cardiff Central - Nottingham|route2=CrossCountry {{rws|Cardiff Central}} to {{rws|Manchester Piccadilly}} via Bristol Temple Meads (Mondays to Saturdays only, limited service) |col={{XC colour}} }}{{rail line one to three|previous=Cardiff Central|next1={{rws|Bristol Parkway}}|next2=Severn Tunnel Junction|next3=Filton Abbey Wood|route1=Great Western Railway Cardiff Central / Swansea - London Paddington|route2=Great Western Railway Cardiff Central - Taunton|route3=Great Western Railway Cardiff Central - Brighton / Portsmouth Harbour |col={{FGW colour}} }}{{s-note|text=Future services}}{{rail line |route=Transport for Wales Ebbw Valley Railway |previous=Pye Corner |col={{KAW colour}} |lightcol={{CV colour|Ebbw Vale}} }}{{s-end}} HistoryThe current station layout consists of four through-platforms numbered 1 to 4 from the south side. The original broad gauge station had only two {{convert|200|ft|m|adj=mid|-long}} through platforms and a bay platform at the east end of the down platform. The Hillfield railway tunnels to the west of the station were dug under Stow Hill in the 1840s.[10] On the closure of Dock Street and Mill Street stations to passengers in 1880, High Street station was greatly expanded: The up platform was made into an island - the north face {{convert|825|ft}} in length, and the south side {{convert|814|ft}}. The down platform was extended to {{convert|897|ft}}, with the west end bay extended to {{convert|428|ft}}. Two scissors crossovers were provided on these new platforms, effectively dividing them into two. The original down platform became Nos. 1 and 2. The bay became No. 3, the south face of the up platform Nos. 4 and 5 and the north face Nos. 6 and 7. The bay platform was mostly used for Monmouthshire western valleys services, but with the quadrupling of the line in 1912 trains from the bay platform (on the south side) now had to cross the entire station to get to the Gaer Tunnel on the north side. To address this the former loading dock on the north side of the station was made into a passenger platform (No. 8). April 1961 saw the introduction of colour Multiple-Aspect Signalling and associated modifications to the station layout. The north face of the island platform became the new up platform, with the south face becoming the new down. The platforms were also renumbered in the opposite direction to match the new line designations — No. 8 became No. 1, Nos. 6/7 became 2, Nos. 4/5 became No. 5 and Nos. 1/2 became No. 6. Lines 3 and 4 became the designations for the through non-platform lines. Subsequent removal of the scissors crossovers saw a further combination and renumbering of platforms to the current layout. NameOriginally named Newport High Street, the suffix High Street became unnecessary on the closure of Mill Street and Dock Street stations to goods traffic in the 1960s.[11] Printed tickets and National Rail enquiries use the suffix "South Wales" to differentiate this station from its namesake in Essex. In 2007 the Newport Unlimited urban regeneration company proposed the station be renamed Newport City railway station; however, this suggestion was not taken up.[12] Accidents and incidents
FacilitiesPlatform 1 is only mainly used for westbound services to Cardiff Central during peak times. Platform 2 is usually the stopping point for all westbound services to Cardiff Central. Platform 3 is usually the stopping point for eastbound services to London Paddington and Nottingham. Platform 4 is usually the stopping point for eastbound services to Manchester Piccadilly, Holyhead, Portsmouth Harbour, Taunton and Cheltenham Spa and will also be used by trains to Ebbw Vale following the full re-opening of the Ebbw Valley Railway. A British Transport Police station and a branch of WH Smith are situated on platform 1. The waiting room and customer toilets are situated between platforms 2 and 3, as is the Upper Crust café. Also between platforms 2 and 3 is a customer help desk. The booking hall is situated between the main entrance and platform 1. There are three main windows for tickets for immediate travel and a travel centre which handles enquiries, complaints and issues tickets for future travel. In the booking hall there is also a small buffet, telephones, automatic ticket machines and a photo booth. Wheelchair access between platforms is provided by a subway, accessed by a lift from the platforms. Also, a ramp from platforms 2 and 3 leads into a subway that links Mill Street to the city centre. There is a short-stay car park and taxi rank situated to the front and a long-stay car park to the rear which is accessible via a footbridge from all platforms. Since October 2005, automatic ticket barriers have been installed. At the same time, the ticket barriers are being used more often, before used during peak periods and match days, now manned throughout the day until late in the evening. 2007 developmentThe Welsh Government and Network Rail agreed a £20 million makeover for the station that provided two new concourses, a second pedestrian bridge over the tracks and a user-friendly bus-rail interchange at the station. The plans also included an extended platform 4 capable of accommodating up to twelve-carriage intercity trains and a new multi-storey car park for long-stay travellers. The initial redevelopment of Platform 4 did not allow for disabled access, resulting in station staff using a locally contracted taxi firm at £3 a passenger to move disabled and elderly passengers the half-mile from one side of the station to the other, in a complimentary service provision.[14] The first phase, platform 4 extension, was completed on 2 July 2007, with design works completed by Atkins.[15] 2009 developmentPlanned to enable the station to cope with passenger traffic associated with the 2010 Ryder Cup, a second passenger bridge was built linking the whole station with a lift for all platforms. Network Rail claimed accessibility and safety are at the heart of the new design. The new bridge is clad in ethylene tetrafluoroethylene (ETFE),[16] the material which protects the Eden Project in Cornwall. The station enhancements were engineered by Atkins Engineers, based in Exeter and Swindon, with design support from Grimshaw Architects and Vector Foiltec working as sub-consultants.[16] The new north and south concourses opened on 13 September 2010.[17] Arriva Trains Wales had expressed concern about a leaking roof, an inadequate customer service area and insufficient ticket gates.[18] Network Rail said the roof was fixed in mid-May 2011, but issues had resumed in 2013.[19] Transport for Wales acquired the management of the station in 2018 and are replacing station infrastructure across the network.[9] Future developmentsThe whole Newport area was re-signalled from 2009–12, providing speed improvements on the relief lines. The Great Western Main Line is being electrified as part of the Great Western Main Line electrification scheme.[20] As part of this the former footbridge was removed in 2017.[21] Journey times between Newport and London Paddington will eventually be reduced to around 1 hour 30 minutes[22], and Hitachi Rail bi-mode British Rail Class 800 trains will switch from running on diesel to electric supply from London through to Cardiff Central. Completion is set for 2019.[22] In September 2018, plans were submitted to Newport City Council for a new footbridge between Devon Place and Queensway, to replace the subway used since the closure of the previous footbridge.[23] The South East Wales Transport Alliance (SEWTA) have proposed an additional service (one in every two hours) to Abergavenny with a re-opened station in Caerleon, two trains per hour between Cwmbran and Abergavenny, and an hourly service to Pontypool and New Inn, subject to line enhancements in Abergavenny. Transport for Wales have included some of these proposals in their plans for the later stages of their South Wales Metro scheme.[9] See also
References1. ^GB eNRT 2015-16 Edition, Table 131 (Network Rail) 2. ^GB eNRT 2015-16 Edition, Table 128 (Network Rail) 3. ^{{cite web |url=http://www.sewta.gov.uk/ |archive-url=https://web.archive.org/web/20060207175703/http://www.sewta.gov.uk/ |dead-url=yes |archive-date=2006-02-07 |title=SEWTA |publisher=SEWTA|date= |accessdate=2013-01-22 }} 4. ^GB eNRT 2015-16 Edition, Table 51 (Network Rail) 5. ^GB eNRT 2015-16 Edition, Table 125 (Network Rail) 6. ^GB eNRT 2015-16 Edition, Table 123 (Network Rail) 7. ^GB eNRT 2015-16 Edition, Table 134 (Network Rail) 8. ^{{cite web| url=http://wales.gov.uk/docs/det/consultation/090715nationaltransportplanen.pdf| archive-url=http://webarchive.nationalarchives.gov.uk/20090806165234/http%3A//wales.gov.uk/docs/det/consultation/090715nationaltransportplanen.pdf| dead-url=yes| archive-date=2009-08-06| format=PDF| title=National Transport Plan| accessdate=3 December 2017| date=July 2009| publisher=Welsh Government|page=26}} 9. ^1 2 {{Cite web|url=https://tfw.gov.wales/whats-happening-south-east-wales|title=What's Happening in South East Wales {{!}} Transport for Wales|website=tfw.gov.wales|access-date=2019-02-19}} 10. ^{{cite web | publisher = Bob Trett, newportpast.com| url = http://www.newportpast.com/early/summary/ | title = A Summary of the Early History of Newport | accessdate = 1 October 2007}} 11. ^Railway Magazine, July 1960 12. ^{{cite web|url=http://www.newportunlimited.co.uk/10778.file.dld |title=Newport Unlimited Minutes of the Meeting of the Board held on 22 November 2007 |publisher=Newport Unlimited |date=2007-11-22 |accessdate=2008-02-05 |deadurl=yes |archiveurl=https://web.archive.org/web/20081121015529/http://www.newportunlimited.co.uk/10778.file.dld |archivedate=21 November 2008 }} 13. ^{{cite book |last=Earnshaw |first=Alan |title=Trains in Trouble: Vol. 7 |year=1991 |publisher=Atlantic Books |location=Penryn |isbn=0-906899-50-8 |page= }} 14. ^Taxis used between rail platforms BBC News - 17 August 2007 15. ^{{cite web|url=http://www.newportunlimited.co.uk/10481.file.dld |title=Newport Unlimited Annual Review 2005-06 |date= |accessdate=2013-01-22 |deadurl=yes |archiveurl=https://web.archive.org/web/20120207100046/http://www.newportunlimited.co.uk/10481.file.dld |archivedate=7 February 2012 }} 16. ^{{cite news|url=http://news.bbc.co.uk/1/hi/wales/8170949.stm|title=Station revamp ahead of Ryder Cup |publisher=BBC News|date=2009-07-27|accessdate=2009-07-27}} 17. ^{{cite web|url=http://www.railnews.co.uk/news/general/2010/09/14-lasting-benefits-from-22m-newport.html|accessdate=2010-09-16| title=Lasting benefits from £22m newport station upgrade }} 18. ^1 {{cite magazine |last1=Clark |first1=Rhodri |last2= |first2= |title=Newport station roof leaks |magazine=Modern Railways |date=July 2011 |page=12 |publisher=Ian Allan Publishing |doi= |url= }} 19. ^{{cite news| url=https://www.bbc.co.uk/news/uk-wales-22294831 | work=BBC News | title=Newport £22m railway station futuristic roof 'leaking' | date=26 April 2013}} 20. ^{{cite web |url=http://www.railnews.co.uk/news/general/2011/03/01-great-western-electrification-and-iep.html |title=Great Western electrification and IEP to go ahead |publisher=Railnews.co.uk |date=1 March 2011 |accessdate=2013-01-22}} 21. ^Newport railway station footbridge set to be removed South Wales Argus 18 March 2017 22. ^1 {{Cite web|url=https://www.networkrail.co.uk/running-the-railway/our-routes/wales/south-wales-electrification/|title=South Wales electrification|website=Network Rail|language=en-GB|access-date=2019-02-19}} 23. ^{{cite news|url=https://www.southwalesargus.co.uk/news/16838133.plans-for-attractive-footbridge-to-replace-city-subway-move-step-closer/|title=Plans for 'attractive' footbridge to replace city subway move step closer|publisher=South Wales Argus|date=12 September 2018}}
External links{{commons category|Newport railway station}}
9 : Railway stations in Newport, Wales|Former Great Western Railway stations|Railway stations opened in 1850|1850 establishments in Wales|South Wales Main Line|Railway stations served by Transport for Wales Rail|Railway stations served by CrossCountry|Railway stations served by Great Western Railway|History of Newport, Wales |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。