请输入您要查询的百科知识:

 

词条 A10 motorway (Romania)
释义

  1. Sections

  2. Openings timeline

  3. Exit list

  4. See also

  5. References

  6. External links

{{Use dmy dates|date=July 2013}}{{Infobox road
|country = ROU
|type = A
|route = 10
|alternate_name = Sebeș–Turda Motorway
{{lang|ro|Autostrada Sebeș–Turda}}
|maint = Compania Națională de Autostrăzi și Drumuri Naționale din România
|map = Romania Motorway A10.svg
|length_km = 28.8
|length_ref =
|length_notes = {{convert|70.0|km|abbr=on}} planned
{{convert|41.2|km|abbr=on}} under construction
|established = 2018
|direction_a = South
|terminus_a = Sebeș (junction with A1)
|junction =
|cities = Alba Iulia, Aiud
|direction_b = North
|terminus_b = Turda (junction with A3)
|beltway_city =
|counties = Alba, Cluj
|system =
|spur_type =
|spur_of =
|previous_type =
|previous_route =
|next_type =
|next_route =
|browse =
|commons =
|customcommons =
}}

The A10 motorway ({{lang-ro|Autostrada A10}}), also known as the Sebeș–Turda Motorway ({{lang-ro|Autostrada Sebeș–Turda}}), is a partially built motorway in the central-western part of Romania, that when completed will connect the A1 and the A3 motorways, between the cities of Sebeș and Turda, also providing access to Alba Iulia and Aiud. It is planned to be 70 km long, with a total cost of 420 million euro, which is financed in proportion of 85% from the European Union funds, the rest of 15% being insured from the state budget. The motorway is divided into four lots:[1] works for lots 3 and 4 began on 20 May 2014, whereas for the other two lots began in 2015.[2] Since 30 July 2018, it is operational on lots 3 and 4, from Aiud to Turda (28.9 km).

Sections

The construction is split into the following four segments, the contracts for which have been awarded in December 2013:[3]

  • Lot 1: 17.0 km, from the highway entrance near the interchange with the A1 motorway at Sebeș to Paraul Iovului, awarded to the building consortium of Impresa Pizzarotti & Pomponio Construcţii SRL, for a cost of 541.739.137 lei.
  • Lot 2: 24.3 km, from Paraul Iovului to Aiud, awarded to building consortium of Aktor SA & Euroconstruct Trading ’98 SRL for a cost of 549.332.493 lei.
  • Lot 3: 12.5 km, from Aiud to the Decea interchange, awarded to the building consortium of Tirrena Scavi SpA and Società Italiana per Condotte d'Acqua, for a cost of 420,511,921 lei.
  • Lot 4: 16.3 km, from the Decea interchange to the interchange with the A3 motorway near Turda, awarded to Porr Construct SRL and Porr Bau GmbH, for a cost of 470,004,894 lei.

Openings timeline

  • The Aiud to Turda segment (28.8 km) opened to traffic on 30 July 2018.[4][5]
  • Both segments from Sebes to Aiud are only half-way complete, and won't be opened before 2020.

Exit list

Exits and buildings (Northbound)
Sebeș – Turda (70 km)
km 0Sebeș Northunder construction
km 4Parkingunder construction
km 8Alba Iuliaunder construction
km 17Alba Iulia North under construction
km 26Teiuş, Blajunder construction
km 41AiudOpened July 2018
km 53Decea, Unirea, Ocna Mureş Opened July 2018
km 60ParkingOpened July 2018
km 70TurdaOpened July 2018

See also

  • Roads in Romania
  • Transport in Romania

References

1. ^{{cite web|title=Licitație pentru autostrada Sebeș-Turda. Proiectul a fost împărțit în patru loturi|url=http://www.adevarul.ro/locale/alba-iulia/licitatie-autostrada-sebes-turda-proiectul-fost-impartit-4-loturi-1_51ed8c31c7b855ff5663960c/index.html|publisher=Adevărul|date=22 July 2013|language=Romanian}}
2. ^{{cite web|title=AUTOSTRADA SEBEȘ-TURDA: Au început lucrările pe loturile 3 și 4, faza de proiectare, de la intrarea în Aiud până la Turda|url=http://www.alba24.ro/autostrada-sebes-turda-au-inceput-lucrarile-pe-loturile-3-si-4-faza-de-proiectare-de-la-intrarea-in-aiud-pana-la-turda-308189.html|publisher=Alba24|date=20 May 2014|language=Romanian}}
3. ^{{cite web | url = http://130km.ro/a10.html | publisher = 130km.ro | title = Autostrada 10 Sebes-Turda | accessdate = 24 December 2013 | language = Romanian}}
4. ^{{cite web|title=Circulația a fost deschisă pe cei 29 km de pe Loturile 3 și 4 din autostrada A10 Sebeș - Turda, la patru ani de la demararea lucrărilor|url=https://monitorizari.hotnews.ro/stiri-infrastructura_articole-22593584-primii-kilometri-autostrad-termina-dup-19-luni-guvernare-psd-compania-drumuri-nceput-inspec-loturilor-3-4-din-autostrada-a10-sebe-turda-circula-putea-deschis-luni-sear.htm|publisher=Hotnews.ro|date=30 July 2018|language = Romanian}}
5. ^{{cite web|title=Şoferii au încă 30 de km de autostradă în România|url=https://www.digi24.ro/stiri/economie/transporturi/soferii-au-inca-30-de-km-de-autostrada-in-romania-972282|publisher=Digi24.ro|date=30 July 2018|language=Romanian}}

External links

  • Collection of news articles about the motorway
  • Map of the planned motorway route
  • [https://web.archive.org/web/20131224111852/http://www.cnadnr.ro/sebes-turda/ Detailed planning documentation]
{{Roads in Romania}}{{DEFAULTSORT:Sebes-Turda motorway}}

1 : Motorways in Romania

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/23 7:19:47