请输入您要查询的百科知识:

 

词条 Bhubaneswar Duronto Express
释义

  1. Time Table

  2. Important Stoppages

  3. Loco Link

  4. Gallery

  5. See also

  6. References

  7. External links

{{Use dmy dates|date=January 2016}}{{Use Indian English|date=January 2016}}{{Infobox rail service
| name = Bhubaneswar Duronto Express
| image= Bhubaneswar Duronto Express.jpg
| caption =
| type = Duronto Express
| locale = Odisha & Delhi
| first =
| last =
| operator = East Coast Railway
| ridership =
| start = Bhubaneswar
| stops = 4
| end = New Delhi
| distance = {{convert|1724|km|abbr=on}}
| journeytime = 21 hours 50 minutes
| frequency = Once a week
| class = AC 1st Class, AC 2 Tier, AC 3 Tier, Sleeper
| seating = No
| sleeping = Yes
| autorack =
| catering = Pantry car coach attached
| observation =
| entertainment =
| baggage =
| otherfacilities=
| stock =
| gauge = {{RailGauge|1676mm|lk=on}}
| el =
| trainnumber = 12281 / 12282
| speed = {{convert|78|km/h|abbr=on}} average with halts
| map =
| map_state =
}}

Bhubaneswar Duronto Express is a once-a-week weekly train which runs between Bhubaneswar, capital of Odisha and New Delhi in Delhi . This train was introduced as part of the Duronto Express trains that were announced by the then railways minister Mamata Banerjee in 2010-2011 rail budget. It is operated by East Coast Railway.

This train consists of total 17 no. of bogies out of which there are 8 no. of sleepers (S1-S8), 1 first class AC coach (H1), one 2-tier AC coach (A1), four 3-tier AC coaches (B1-B4), one pantry car and 2 no.s of SLR bogies each at both the ends. It uses hybrid-LHB coaches.

Time Table

12281 train starts from Bhubaneswar (BBS) every Wednesday at 08:00 AM and reach to New Delhi (NDLS) at 06:25 AM next day.[1]

12282 train starts from New Delhi (NDLS) every Thursday at 12:55 PM and reach back to Bhubaneswar (BBS) at 10:45 AM next day.[2]

Important Stoppages

For train no. 12281 Bhubaneswar-New Delhi Duronto, the important stoppages and technical halts are:

  • Balasore
  • Adra Junction
  • Mughalsarai Junction
  • Kanpur Central

For train no. 12282 New Delhi-Bhubaneswar Duronto the important stoppages and technical halts are

  • Kanpur Central
  • Mughalsarai Junction
  • Adra Junction
  • Balasore

Loco Link

Bhubaneswar-New Delhi Duronto Express is hauled by a Visakhapatnam based or Ghaziabad based WAP-7 or Ghaziabad WAP-4 end to end as the route is fully electrified. Now it is mostly hauled by a Ghaziabad WAP-7 up to Bhubaneswar as its loco link has been upgraded and occasionally getting hauled by Ghaziabad WAP-4.

Gallery

See also

  • Types of Passenger Services
  • Types of Accommodation
  • East Coast Railway Zone

References

1. ^http://runningstatus.in/status/12281
2. ^http://runningstatus.in/status/12282

External links

  • [https://web.archive.org/web/20110616001644/http://www.eastcoastrailway.gov.in/ East Coast Railway Official Website]
  • [https://web.archive.org/web/20100208213823/http://www.eastcoastrailway.gov.in/forum/ East Coast Railway Discussions Board]
  • [https://web.archive.org/web/20070512220556/http://www.ecor-waltair.com/index.asp Waltair Division Official Website]
{{Duronto Express}}{{Railway lines in Eastern India}}{{DEFAULTSORT:Bhubaneswar - New Delhi Duronto Express}}

8 : Transport in Delhi|Transport in Bhubaneswar|Duronto Express trains|Rail transport in Odisha|Rail transport in West Bengal|Rail transport in Uttar Pradesh|Rail transport in Delhi|Railway services introduced in 2010

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/20 14:29:37