词条 | Bugoye Hydroelectric Power Station |
释义 |
| name = Bugoye Power Station | name_official = | image = | image_size = | image_caption = | image_alt = | location_map = Uganda | location_map_size = | location_map_caption = Map of Uganda showing the location of Bugoye Station. | location_map_alt = | location_map_relief = | coordinates = {{coord|00|18|20|N|30|05|53|E|region:UG_type:landmark|display=inline,title}} | country = Uganda | location = Bugoye, Kasese District | purpose = P | status = O | construction_began = | opening = | demolished = | cost = | owner = | operator = | dam_type = | dam_crosses = Mubuku River | dam_height = | dam_height_foundation= | dam_height_thalweg = | dam_length = | dam_elevation_crest = | dam_width_crest = | dam_width_base = | dam_volume = | spillway_count = | spillway_type = | spillway_capacity = | res_name = | res_capacity_total = | res_capacity_active = | res_capacity_inactive= | res_catchment = | res_surface = | res_max_length = | res_max_width = | res_max_depth = | res_elevation = | res_tidal_range = | plant_name = Bugoye Power Station | plant_coordinates = | plant_operator = TronderEnergi | plant_commission = 7 October 2009 | plant_decommission = | plant_type = R | plant_hydraulic_head = {{convert|159|m|abbr=on}} | plant_turbines = 2 Francis turbines | plant_capacity = 13 MW | plant_annual_gen = 82 Gwh | website = | extra = }} Bugoye Power Station is a {{convert|13|MW|abbr=on}} mini hydroelectric power station in Uganda. In the literature, Bugoye Power Station is sometimes referred to as Mubuku II Power Station. LocationThe power station is located across the Mubuku River, in Bugoye, Kasese District, in Western Uganda. This location lies in the foothills of the Rwenzori Mountains, close to the border with the Democratic Republic of the Congo. Bugoye lies approximately {{convert|19|km}}, by road, north of Kasese, the location of the district headquarters, and the nearest large city.[1] OverviewThe Bugoye Hydropower Project, is a run of the river mini-hydropower installation, with installed capacity of 13 MW. The energy generated is fed into the national electric grid at Nkenda Substation, located {{convert|6|km|mi}} from Bugoye, via a 33kV transmission line. The power station is owned and operated by TronderEnergi, a Norwegian power company. Construction began in March 2008 and the plant was commissioned 19 months later in October 2009.[2] Bugoye Power Station is the third mini-hydropower station on River Mubuku. The other two are Mubuku I Power Station, owned by Kilembe Mines Limited (KML), with installed capacity of 5 MW and Mubuku III Power Station, owned by Kasese Cobalt Company Limited (KCCL), with installed capacity of 10 MW.[3] Construction costsThe estimated costs for the dam and power plant is approximately US$35 million. The funding was facilitated by a loan from the Emerging Africa Infrastructure Fund, (EAIF). This does not include the construction of a 33kV transmission power line linking the power station to the substation where the power is integrated into the national grid. The power line was funded by a grant from the Government of Norway to the Government of Uganda. By mutual consent between the two governments, [https://web.archive.org/web/20140208091117/http://www.tronderpower.com/ Tronder Power Limited], assumed the responsibility of developing, constructing, maintaining and servicing the power line.[4] Tronder Power Limited is a Ugandan company co-owned by TronderEnergi and Norfund.[5] See also{{stack|{{Portal|Uganda|Water|Renewable energy}}}}
References1. ^{{cite web |publisher=Globefeed.com |accessdate=4 May 2014| url=http://distancecalculator.globefeed.com/Uganda_Distance_Result.asp?fromplace=Bugoye%20(Kasese)&toplace=Kasese%20(Kasese)&fromlat=0.3383333&tolat=0.23&fromlng=30.0772222&tolng=29.9883333 |title=Map Showing Kasese And Bugoye With Distance Marker}} 2. ^{{cite web |title=Bugoye Plant Operating In Uganda| date=11 February 2010 |publisher=Water Power Magazine |accessdate=4 May 2014| url=http://www.waterpowermagazine.com/news/newsbugoye-plant-operating-in-uganda}} 3. ^{{cite web|url=http://www.newvision.co.ug/mobile/Detail.aspx?NewsID=642322&CatID=442 |first=Masereka |last=B |title=River Nyamwamba Spills Wrath |accessdate=4 May 2014 |publisher=New Vision |deadurl=yes |archiveurl=https://web.archive.org/web/20140505055843/http://www.newvision.co.ug/mobile/Detail.aspx?NewsID=642322&CatID=442 |archivedate=5 May 2014 |df= }} 4. ^{{cite web| url=http://www.emergingafricafund.com/news/saems-and-bugoye-power-projects.aspx| title=SEAMS And Bugoye Projects|accessdate=4 May 2014|publisher=Emerging Africa Fund}} 5. ^{{cite web|accessdate=4 May 2014|url=http://www.tronderpower.com/|title=About Tronder Power Limited|publisher=Tronder Power Limited|deadurl=yes|archiveurl=https://web.archive.org/web/20140208091117/http://www.tronderpower.com/|archivedate=8 February 2014|df=}} External links
4 : Energy infrastructure completed in 2009|Hydroelectric power stations in Uganda|Kasese District|Western Region, Uganda |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。