请输入您要查询的百科知识:

 

词条 Canal Bank Road
释义

  1. Interchanges & exits

  2. Extension & reconstruction

  3. See also

  4. References

{{Use Pakistani English|date=January 2018}}{{infobox road
| name=Canal Bank Road
{{nq|سڑک نہر}}
| alternate_name =Khayaban-e-Annemarrie Schimmel
{{nq|خیابان اننمرے سچمل}}
| country= PAK
| type=
| route=
| length_km=29
| length_ref=
| Interchanges=
| terminus_a= Multan Road, Thokar Niaz Beg
| terminus_b=BRB Canal Road, Khaira
| established=2016
| maint=Lahore Development Authority
}}Canal Bank Road (Punjabi, {{lang-ur|{{nq|سڑک نہر}}}}, Sarak-e-Nehr), also known as Khayaban-e-Annemarrie Schimmel (Punjabi, {{lang-ur|{{nq|"خیابان این میری شمل }}}}), is a major six lane east-west signal free road which extends along the banks of the Lahore Canal in Lahore, Punjab, Pakistan.[1] The road serves as a major central artery of Lahore and extends from Multan Road in Thokar Niaz Beg to BRB Canal Road in Khaira, passing through the neighbourhoods of Johar, Gulberg, Mughalpura and Harbanspura.[2] Originally known as Canal Bank Road, in 2000, the Government of Pakistan renamed Canal Bank Road in honour of Annemarie Schimmel, for her works in Sufism and Muhammad Iqbal, a prominent philosopher and national poet of Pakistan.

Interchanges & exits

There are 12 underpasses along the entire route of Canal Bank Road, which allows continuous flow of traffic from Thokar Niaz Beg to Harbanspura. The Thokar Niaz Baig Flyover allows motorists from Multan Road and the M2 motorway to bypass Thokar Niaz Beg Chowk, which previously was a major choke point.

Interchanges Type
Multan Road Thokar Niaz Beg Flyover
Shahrah-e-Nazaria Pakistan Exit (Westbound only)
Abuzar Ghaffari Road Exit (Westbound only)
Yaseen Khan Watoo Road Exit (Westbound only)
Abdul Haque Road Chaudhary Rehmat Ali Underpass
Shahrak-e-Wafaqi Exit (Westbound only)
Maulana Shaukat Ali Road Chakar-e-Azam Rind Underpass
Khayaban-e-Jamia Punjab Waris Mir Underpass
Chaudhary Anwar Ali Road Exit (Eastbound only)
Masood Farooqi Road Lal Pul Underpass
Ferozepur Road Liaquat Ali Khan Underpass
Zahoor Elahi Road F.C. College Underpass
Shah Jamal Road Exit (Eastbound only)
Jail Road Waris Shah Underpass
Mall Road Faiz Ahmed Faiz Underpass
Sunderdas Road
Allama Iqbal Road
Hussain Shaheed Soherwordi Underpass
Choubaca Underpass
Shalimar Road Mughalpura Underpass
Lahore Ring Road Jogindar Lal Mandal Underpass
Harbanspura Interchange
Jallo Park Road Intersection
BRB Canal Road Intersection

Extension & reconstruction

Canal Bank Road has continuously needed widening and repaving due to its heavy use.

  • Multan Road - Abdul Haque Road: Construction to widen this section began on 28 October 2011 and was completed on 15 January 2012 at cost of {{PKRConvert|166|m}} by Habib Construction Services.[3]
  • Thokar Niaz Beg Flyover: Construction began on 1 December 2010 and was completed on 28 February 2011 at a cost of {{PKRConvert|315|m}} by Habib Construction Services.[4]

See also

  • List of streets in Lahore
  • Transport in Lahore
  • List of bus routes in Lahore

References

1. ^http://www.wwfpak.org/191207_canalroad-widening-facts.php Widening plan for road
2. ^https://nation.com.pk/27-Jan-2018/carefree-ride-on-signal-free-corridors
3. ^http://www.hcs.com.pk/completed-projects-advanced-project-contractors/wi-of-canal-road-thokar-niaz-baig-to-defence-road/
4. ^https://www.thenews.com.pk/print/112286-Canal-Road-widening-from-next-month
{{Provincial Highways of Punjab}}{{Pakistan-road-stub}}

2 : Streets in Lahore|Roads in Lahore

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/20 9:25:24