请输入您要查询的百科知识:

 

词条 CGR 0-4-0ST 1873
释义

  1. Cape railways expansion

  2. Manufacturer

  3. Johnston link-and-pin coupler

  4. Cape Midland System

  5. Cape Western System

  6. References

{{Use dmy dates|date=November 2013}}{{Use South African English|date=November 2013}}{{Infobox locomotive
| name = CGR 0-4-0ST 1873
| image = CGR 0-4-0ST 1873 no. M2 Little Bess.jpg
| alt =
| caption = CGR 0-4-0ST of 1873, no. M2 {{nowrap|Little Bess}}
| hatnote =
| powertype = Steam
| designer = Manning Wardle & Company
| builder = Manning Wardle & Company
| ordernumber =
| serialnumber = 434, 442 & 494
| buildmodel =
| builddate = 1873-1874
| totalproduction =
| rebuilder =
| rebuilddate =
| numberrebuilt =
| whytetype = 0-4-0ST (Four-coupled)
| uicclass = Bn2t
| driver = 2nd coupled axle
| gauge = {{Track gauge|Cape|allk=on}}
| leadingdiameter =
| coupleddiameter = {{convert|33+3/4|in|mm|0|abbr=on}}
| trailingdiameter =
| tenderdiameter =
| minimumcurve =
| wheelbase = {{convert|4|ft|9|in|mm|0|abbr=on}}
| engine total =
| leading =
| coupled =
| trailing =
| tender total =
| tenderbogie =
| pivotcentres =
| wheelspacing =
| length =
| over couplers = {{convert|18|ft|7|in|mm|0|abbr=on}}
| over bufferbeams =
| width =
| height = {{convert|9|ft|3/4|in|mm|0|abbr=on}} chimney
{{convert|10|ft|mm|0|abbr=on}} cab roof
| frametype =
| axleload =
| leadingbogie/pony=
| coupled all =
| coupled 1 =
| coupled 2 =
| coupled 3 =
| coupled 4 =
| coupled 5 =
| coupled 6 =
| coupled 7 =
| coupled 8 =
| trail bogie/pony =
| tenderbogieload =
| tenderaxle =
| weightondrivers = {{convert|13|lt|16|lcwt|kg|sigfig=4|abbr=on}}
| locoweight = {{convert|13|lt|16|lcwt|kg|sigfig=4|abbr=on}}
| tenderweight =
| locotenderweight =
| tendertype =
| fueltype = Coal
| fuelcap = {{convert|5|lcwt|t|abbr=on}}
| watercap = {{convert|250|impgal|l|sigfig=3|abbr=on}}
| tendercap =
| sandcap =
| fireboxtype = Round-top
| firearea = {{convert|4.5|sqft|m2|abbr=on}}
| boiler =
| pitch = {{convert|3|ft|10|in|mm|0|abbr=on}}
| boilertype =
| diameterinside =
| lengthinside = {{convert|7|ft|3|in|mm|0|abbr=on}}
| smalltubediameter=
| largetubediameter=
| boilerpressure = {{convert|130|psi|kPa|0|abbr=on}}
| safetyvalvetype =
| feedwaterheater =
| totalsurface = {{convert|246.5|sqft|m2|abbr=on}}
| tubearea = {{convert|217.5|sqft|m2|abbr=on}}
| fluearea =
| tubesandflues =
| fireboxarea = {{convert|29|sqft|m2|abbr=on}}
| superheatertype =
| superheaterarea =
| cylindercount = Two
| cylindersize = {{convert|9|in|mm|0|abbr=on}} bore
{{convert|14|in|mm|0|abbr=on}} stroke
| frontcylindersize=
| rearcylindersize =
| hpcylindersize =
| lpcylindersize =
| valvegear = Stephenson
| valvetype =
| valvetravel =
| valvelap =
| valvelead =
| transmission =
| trainheating =
| locobrakes =
| trainbrakes =
| safety =
| coupling = Johnston link-and-pin
| maxspeed =
| poweroutput =
| tractiveeffort = {{convert|3280|lbf|kN|abbr=on}} @ 75%
| factorofadhesion =
| locobrakeforce =
| operator = Mac Donald & Company
Cape Government Railways
| operatorclass =
| powerclass =
| numinclass = 3
| fleetnumbers = M1-M2, W46
| officialname = Pioneer & Little Bess (M1 & M2)
| nicknames =
| axleloadclass =
| locale =
| deliverydate = 1873-1874
| firstrundate = 1873
| lastrundate =
| withdrawndate =
| preservedunits =
| restoredate =
| scrapdate =
| currentowner =
| disposition =
| notes =
}}

The Cape Government Railways 0-4-0ST of 1873 was a South African steam locomotive from the pre-Union era in the Cape of Good Hope.

In 1873, two Cape gauge saddle-tank locomotives with a 0-4-0 wheel arrangement were placed in construction service by Mac Donald & Company, contractors to the Port Elizabeth and Uitenhage Railway Company. When the contract was completed in 1875, the railway and the locomotives were taken over by the Midland System of the Cape Government Railways. A third locomotive, built to the same design, was delivered to the Western System in Cape Town in 1874. These were the first Cape gauge locomotives to enter service in South Africa.[1][2][3][4]

Cape railways expansion

When the control of railways in the Cape of Good Hope was taken over by the Colonial Government on 1 January 1873 and the Cape Government Railways (CGR) was established with the object of railways expansion, a Select Committee was appointed to study the question of track gauge. The choice which had to be made was between the existing Standard gauge of {{convert|4|ft|8+1/2|in|mm|0|abbr=off}} and the narrower gauge of {{convert|2|ft|6|in|mm|0|abbr=off}}, which would effect savings of up to one-third on construction cost.[5][6][7]

The CGR Chief Railway Engineer William George Brounger was opposed to the adoption of a narrower gauge on the grounds that, while initial cost would be less, operating costs would be higher. The narrow gauge had been proposed by civil engineer R. Thomas Hall, Superintendent of the narrow gauge Redruth and Chacewater Railway in Cornwall, who was involved in the construction, beginning in 1869, of the Namaqualand Railway which was being built to that gauge between Port Nolloth and O'okiep for the Cape Copper Mining Company. The committee, with a three-to-one vote, settled on a compromise between the two recommended gauges and the {{convert|3|ft|6|in|mm|0|abbr=off}} Cape gauge came into existence in Southern Africa.[5][6][7]

Manufacturer

The first three locomotives for the new Cape gauge lines were built by Manning Wardle & Company in 1873 and 1874. The first two, ex works on 12 March and 3 May 1873 respectively, were delivered in 1873 to Mac Donald & Company, contractors to the Port Elizabeth and Uitenhage Railway Company in Port Elizabeth. The contractors named them Pioneer and Little Bess respectively.[1][2][3][4][8]

The third locomotive, ex works on 6 February 1874, was delivered to the Western System in Cape Town in 1874 and was numbered W46 in the Western's number range.[2]

Johnston link-and-pin coupler

From the arrival of the first railway locomotive in South Africa, the Cape Town Railway & Dock 0-4-0T of 1859, all railway rolling stock had been equipped with buffers-and-chain coupling, variations of which are still in use in the United Kingdom and Europe.[9]

These locomotives of 1873 introduced the bell-shaped Johnston link-and-pin coupler, commonly known as a bell link-and-pin coupler, which was to become the standard coupler on Cape gauge rolling stock in the Cape of Good Hope, the Colony of Natal and the Zuid-Afrikaansche Republiek. In South Africa, all new Cape gauge locomotives and rolling stock acquired between 1873 and 1927 were equipped with these or similar couplers.[1][5][10]

Cape Midland System

By 1872, Port Elizabeth already possessed extensive Standard gauge trackage between the harbour and Swartkops, but trains were still animal-hauled. Work by contractors Mac Donald's on railway expansion from Port Elizabeth into the interior commenced in June 1872. The two locomotives which were delivered to them in 1873 were utilised as construction engines.[4][5][8]

The first train ran as far as Sydenham in October 1873, and {{convert|11|mi|km|abbr=off}} of railway was completed by 1874. When the two new lines were opened in 1875, northwestward to Uitenhage and northward from Swartkops to Barkly Bridge, the lines and the construction locomotives were taken over by the CGR and the locomotives were numbered M1 and M2 for the Midland System. These two locomotives, together with a smaller {{nowrap|0-4-0ST}} engine named Mliss which joined them on construction work in 1874, are considered the pioneers of locomotives over the greater part of the Midland System.[4][5][8]

Cape Western System

By 1874, when the third of the first three locomotives, no. W46, was delivered to the Western System, construction work was proceeding in two directions from Wellington. New Cape gauge track was being laid deeper into the interior towards Worcester, while track dual-gauging was being undertaken back from Wellington towards Cape Town.[5]

References

{{Commons category|CGR 0-4-0ST 1873|position=left}}
1. ^{{Holland-Vol 2|pages=117-118}}
2. ^{{cite journal| title=C.G.R. Numbering Revised| first=Dave| last=Littley| journal=SA Rail| date=May–June 1993| pages=94-95}}
3. ^{{Paxton-Bourne|page=6}}
4. ^Pioneer, Little Bess & Mliss
5. ^{{cite book| title=The South African Railways - Historical Survey| editor=George Hart| publisher=Bill Hart, Sponsored by Dorbyl Ltd.| year=1978| pages=9, 11-13}}
6. ^{{Bagshawe|page=8}}
7. ^[https://sites.google.com/site/soulorailway/home/system-1/part-3 Soul of A Railway - System 1 – Part 1: Cape Town prior to the Second World War] (Accessed on 26 November 2016)
8. ^{{cite book| title=Uitenhage Past and Present - Souvenir of the Centenary - 1804-1904| last=Sellick| first=W.S.J.| publisher=W.S.J. Sellick at the "Uitenhage Times" Office| location=Cape Colony| year=1904| pages=144-146}} (Accessed on 18 August 2016)
9. ^Espitalier, T.J.; Day, W.A.J. (1943). The Locomotive in South Africa - A Brief History of Railway Development. Chapter I - The Period of the 4 ft. 8½ in. Gauge. South African Railways and Harbours Magazine, June 1943. pp. 437-440.
10. ^Suid-Afrikaanse Vervoerdienste (South African Transport Services) (1983). Passassierswa- en Trokhandboek (Passenger Carriage and Truck Manual), Vol 1, Hoofstukke 1-15 (Chapters 1-15). South African Transport Services, 1983. Chapter 13.
{{Locomotives of the Cape Government Railways}}{{Locomotives of South Africa}}

7 : CGR locomotives|0-4-0 locomotives|B locomotives|Manning Wardle locomotives|Railway locomotives introduced in 1873|1873 in South Africa|Scrapped locomotives

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/21 13:51:22