请输入您要查询的百科知识:

 

词条 Chilime Hydropower Plant
释义

  1. Gallery

  2. See also

  3. References

{{Infobox dam
| name = Chilime
| name_official = Chilime Hydroelectric Plant
| image =
| image_size =
| image_caption = Power house
| image_alt =
| location_map = Nepal
| location_map_size =
| location_map_caption =
| location_map_alt =
| coordinates = {{coord|28|11|11.47|N|85|17|59.83|E|type:landmark|display=inline,title}}
| country = Nepal
| location = Chilime
| construction_began =
| opening = 2003
| demolished =
| cost = Rs. 248 crore (approx)
| owner = Chilime Hydropower Company Limited
| dam_type = Gravity, weir
| purpose = Power
| dam_crosses = Chilime River
| dam_length = {{Convert|13|m|ft|abbr=on}}
| dam_height ={{Convert|3.25|m|ft|abbr=on}}
| dam_height_foundation=
| dam_height_thalweg =
| dam_elevation_crest =
| dam_width_crest =
| dam_width_base =
| dam_volume =
| spillway_count =
| spillway_type =
| spillway_capacity =
| res_name = Chilime Peaking Pond
| res_capacity_total = {{Convert|53032|m3|acre.ft|abbr=on}}
| res_capacity_active =
| res_capacity_inactive=
| res_catchment =
| res_surface =
| res_max_length =
| res_max_width =
| res_max_depth =
| res_elevation =
| res_tidal_range =
| plant_name = Chilime Hydropower Plant
| plant_coordinates = {{coord|28|9|26.45|N|85|19|55.22|E|type:landmark}}
| plant_hydraulic_head = {{Convert|351.5|m|ft|0|abbr=on}} (gross)
| plant_operator = Chilime Hydropower Company Limited
| plant_commission = 2003
| plant_decommission =
| plant_type = Run-of-the-river
| plant_turbines = 2 x 11.28 MW Pelton-type
| plant_capacity = 22.1 MW
| plant_annual_gen = 132.918 GWh
| website = http://www.chilime.com.np
| extra =
}}Chilime Hydropower Plant is a run-of-the-river type plant situated in Chilime of Rasuwa district in Nepal, which is 133 km north of Kathmandu. Its headworks are located near Chilime, whereas the underground power plant is located about {{Convert|4.5|km|mi|abbr=on}} to the southwest in Syafrubesi on the banks of the local Bhotekoshi river. Water from a weir is diverted into a reservoir before it can be used at the power plant. The difference in elevation between the reservoir and power station affords a gross hydraulic head (water drop) of {{Convert|351.5|m|ft|0|abbr=on}}. The plant has an installed capacity of 22.1 MW. The generated electricity is fed into the national grid via a 38 km 66 kV single circuit transmission line. Most of the power house facilities are underground, with the switchyard the only feature that remains on the surface.The plant employs two horizontal axis Pelton turbines each of 11.28 MW.[1]

The plant is operated by Chilime Hydropower Company Limited which is a subsidiary of Nepal Electricity Authority.

The plant started its commercial generation from August 2003.[2] Chilime is the brainchild of Dr. Damber Bahadur Nepali, a prominent hydropower expert in Nepal, who founded the company and worked as its first Managing Director[3]. The success story of this indigenously-designed, locally-built and Nepali-financed powerplant, largely the result of Dr. Nepali, has become a living proof that the paradigm shift in Nepali hydropower planning has brought real change[4][5].

Gallery

See also

{{stack|{{Portal|Nepal|Water|Renewable energy}}}}
  • Kaligandaki A
  • Nepal Electricity Authority

References

1. ^{{cite web | url=http://www.chilime.com.np/plant/salient.html | title=Chilime Hydropower Plant | publisher=Chilime Hydropower Company Limited | accessdate=5 June 2014}}
2. ^{{cite report|title= Chilime Annual Report |publisher= Chilime Hydropower Company Limited|}}
3. ^{{Cite news|url=http://www.nepalenergyforum.com/energy-minister-to-tap-state-owned-firms-employee-benefit-funds/|title=Energy minister to tap state-owned firms, employee-benefit funds|last=admin|date=2016-08-27|work=Nepal Energy Forum|access-date=2017-06-27|language=en-US}}
4. ^{{Cite web|url=http://nepalitimes.com/news.php?id=4900#.WVGmjOvyvIU|title=Yes, the Nepali can- Nepali Times|website=nepalitimes.com|access-date=2017-06-27}}
5. ^{{Cite web|url=http://nepalitimes.com/~nepalitimes/news.php?id=4860#.WVGsOOvyvIU|title=People power- Nepali Times|website=nepalitimes.com|access-date=2017-06-27}}
  • {{cite book

| title = Chilime Hydropower Company Limited (Annual Report)
| year = 2010
| publisher = Chilime Hydropower Company Limited | location = Kathmandu
| ref = harv{{GeoGroupTemplate}}

6 : Hydroelectric power stations in Nepal|Dams in Nepal|Run-of-the-river power stations|Dams completed in 2003|Energy infrastructure completed in 2003|2003 establishments in Nepal

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/23 20:22:37