请输入您要查询的百科知识:

 

词条 CN York Subdivision
释义

  1. References

{{refimprove|date=April 2016}}

The CN York Subdivision, or York Sub for short, is a railway line in York and Durham regions in the Greater Toronto Area. It runs for 25 miles between the Pickering Junction on the eastern edge of Toronto, and the MacMillan Yard in Vaughan.

Prior to the construction of the York Sub, CN traffic ran through the downtown core along the CN Kingston Subdivision and through the Union Station area. During the 1950s, CN developed a plan to move traffic off of this line to a major new switching yard in what was then farmland far to the north of the city. The switching yard emerged as the MacMillan Yard, and the traffic normally passing through downtown was switched onto two new tracks, the Halton Sub connecting to the west, and the York Sub to the east. Construction of the York Sub took place between 1959 and 1965.[1]

Originally built in what was then farmland, the York Sub is now firmly embedded in the Greater Toronto Area and has little room for expansion. The lines pass from the Kingston Sub to York Sub at Pickering Junction, with a prominent bridge crossing over Highway 401 in an area now surrounded by buildings, including the Pickering Town Centre. The line runs just north of Steeles Ave to Yonge Street, then turns northeast to join John Street from Bayview to Woodbine, Esna Park Road/Alden Road between Woodbine to Warden, and 14th Avenue from Warden to Markham Road. It connects with the Newmarket Sub at Snider, with the Bala Sub at Doncaster, and with the Uxbridge Sub at Hagerman. Originally, there ware diamonds with connecting wye tracks at each of these locations, but since the crossing with the Uxbridge Subdivision was grade separated, the connecting tracks at Hagerman were removed.

The opening of the York Sub led to dramatically less traffic on the portion of the Kingston Sub between Pickering Junction and Union Station in downtown Toronto. This allowed GO Transit to offer passenger trains along this route starting in 1967, on what is today known as the Lakeshore East line. Metrolinx has since purchased this section of the Kingston Sub, which has removed almost all of CN's traffic from the downtown routes. Metrolinx also purchased a portion of the Newmarket Sub from Bradford to Barrie to operate their Barrie line. The Newmarket Sub, south of Bradford, and north of Rama, is still owned by CN.[2] The significant amount of traffic on the York Sub led to delays on the Barrie line, backing up at the Snyder diamond. This led to the creation of a new grade-separated bridge to bypass the junction, allowing GO traffic to operate unhindered.[3]

Similarly, a grade-separated bridge was built at Hagerman, where the Uxbridge subdivision crosses the York subdivision. This bridge opened for service in December 2008.[4]

References

1. ^"CN York Subdivision", Rails in Toronto
2. ^{{Cite web|url=https://www.cn.ca/-/media/Files/About-CN/Company-Information/three-year-plan-en.pdf?la=en&hash=757E78FBABC46810EDFEF99BC7ACE66BC4C17BC6&usg=AOvVaw2qEDprejK5Lb3c0Uboj_-E|title=CNR 3 Year Plan|last=|first=|date=|website=www.google.com|archive-url=|archive-date=|dead-url=|access-date=2019-01-15}}
3. ^{{Cite web |url=http://www.gotransit.com/PUBLIC/news/bulletin/Apr10_Bradfordlineimprovements.htm |title=Bradford line improvements coming your way |work=Customer Bulletins |publisher=GO Transit |year=2006 |accessdate=2006-05-14 |archiveurl=https://web.archive.org/web/20060905230009/http://www.gotransit.com/PUBLIC/news/bulletin/Apr10_Bradfordlineimprovements.htm |archivedate=2006-09-05 |deadurl=yes |df= }}
4. ^{{Cite web|url=http://www.newswire.ca/news-releases/greater-toronto-area-celebrates-completion-of-commuter-rail-project-536945161.html|title=Greater Toronto Area celebrates completion of commuter rail project|work=News Releases|publisher=CNW|year=2009|accessdate=2008-12-19 }}
{{Rail Subdivisions in Ontario}}{{DEFAULTSORT:York}}

3 : Canadian National Railway lines|Transport in the Greater Toronto Area|Rail infrastructure in Ontario

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/10 13:28:51