词条 | European Offshore Wind Deployment Centre |
释义 |
| name = European Offshore Wind Deployment Centre | name_official = | image = | image_alt = | image_caption = | coordinates = {{coord|57|13|N|1|59|W|type:landmark|display=inline,title}} | country = Scotland | location = Aberdeen Bay | status = O | construction_began = | commissioned = {{start date|2018|09}} | decommissioned = | cost = £335 million[1] | owner = European Offshore Wind Deployment Centre | operator = | wind_farm_type = Offshore | ps_site_area = 19 km2[1] | wind_offshore_depth = 32 m[1] | wind_offshore_distance = {{cvt|3|km|0}}[1] | wind_hub_height = 120 m[1] | wind_rotor_diameter = 164 m[1] | wind_rated_speed = | ps_units_operational = | ps_units_manu_model = Vestas V164-8MW | ps_units_uc = | ps_units_planned = 11 × 8 MW[1] | ps_units_decommissioned = | ps_electrical_capacity = 92.4 | ps_electrical_cap_fac = | ps_annual_generation = | website = }} The European Offshore Wind Deployment Centre (EOWDC) is an offshore wind test and demonstration facility located around 3 kilometres off the east coast of Aberdeenshire, in the North Sea, Scotland. It was developed by the European Offshore Wind Deployment Centre consortium.[1] The scheme consists of 11 wind turbines with an installed capacity of 93.2 megawatts.[9] It is located between Blackdog and Bridge of Don near Aberdeen.[10] First power was generated in July 2018,[2] with full commissioning following in September 2018.[3] PlanningThe wind farm was initially proposed by the Aberdeen Renewable Energy Group (AREG) in 2003.[4] The original plan was for 20 two-megawatt turbines in an eight kilometres long row about 1 kilometre offshore.[4] A geological survey of Aberdeen Bay was begun in 2007,[5] and a grant of 40 million euros was offered by the European Commission in 2009.[6] The proposal at that stage was for a maximum of 23 turbines.[6] A planning application was lodged in August 2011.[7] The application was submitted by Aberdeen Renewable Energy Group (AREG) in cooperation with two other companies, Vattenfall and Technip.[7] The proposal was for 11 turbines.[7] Planning consent was granted by the Scottish government in March 2013.[8] In May 2013 Vattenfall announced plans to reduce its stake in the project.[9] In October 2013 Aberdeenshire councillors rejected a planning application to build an electricity substation.[10] In December 2013 it was announced that construction would be delayed for two years, with connection of the grid occurring in 2017.[11] In January 2014 an appeal against the substation vote was lodged.[12] The developers won the appeal in July 2014.[13] Vattenfall decided to proceed with the 92 MW wind farm in July 2016.[14] The plan was for 11 turbines each of 8 MW placed 3 km from land,[15] with a contract for the assembly of suction bucket foundations for the turbines contracted out to Smulders Projects UK.[16] Objections{{main|Trump International Golf Club Scotland Ltd v The Scottish Ministers}}American billionaire Donald Trump purchased a large part of the Menie estate near the village of Balmedie in 2006. He proposed to build a golf course, with a hotel, holiday homes and a residential village.[17] He expressed his concerns about the wind farm in April 2006 stating that "I want to see the ocean, I do not want to see windmills."[18] In 2006 RSPB Scotland expressed concern about the effect both the wind farm and Donald Trump's golf course would have on the wildlife on the Aberdeenshire coast.[18] In 2011 the RSPB called for "more planning, research and monitoring ... to ensure we truly understand the impact this site may have on local birds."[19] In September 2011 the Trump Organization filed an objection to the planning application.[20] By 2012 the RSPB dropped its opposition to the wind farm following the reduction in the number of turbines and a change in the layout."[21] In May 2013 Trump launched a legal challenge against the Scottish government's decision to grant planning permission for the wind farm.[22] The hearing began at the Court of Session in November 2013,[23] but was rejected in February 2014.[24] An appeal against the decision was heard at the Court of Session in January 2015,[25] but Trump lost the appeal in June 2015.[26] After the decision Trump said he would appeal before both the Supreme Court of the UK and the European Courts.[26] Trump's appeal was unanimously dismissed by the UK Supreme Court in December 2015.[27] ConstructionConnection work began in early 2017 which involved the laying of more than four miles of high voltage underground cable between the substation in Dyce (on the outskirts of Aberdeen) and the wind farm's onshore substation at Blackdog.[28] The first foundation was installed offshore in March 2018,[29] and the first turbine was installed in April.[30] The eleventh and final turbine was erected near the end of May.[31] First power was generated in July 2018,[2] with full commissioning following in September 2018.[3] See also{{Portal|Scotland|Weather|Renewable energy}}
References1. ^{{citation| url=http://www.vattenfall.co.uk/en/aberdeen-bay.htm | title=European Offshore Wind Deployment Centre | publisher=Vattenfall | accessdate=29 July 2014 }} 2. ^1 {{cite web|url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-44681278 |title=Aberdeen wind farm opposed by Donald Trump generates first power}} 3. ^1 2 {{cite news|author=|title=Aberdeen offshore wind project opposed by Trump officially opening|url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-45446189|work=BBC News|location=NE Scotland, Orkney & Shetland|date=7 September 2018|access-date=9 September 2018}} 4. ^1 {{citation| url=http://news.bbc.co.uk/1/hi/scotland/3109206.stm | title=Offshore wind farm plan unveiled | publisher=BBC News | date=15 September 2003 }} 5. ^{{citation| url=http://news.bbc.co.uk/1/hi/scotland/north_east/6272740.stm | title=Sea survey for offshore wind farm | publisher=BBC News | date=5 July 2007 }} 6. ^1 2 {{citation| url=http://news.bbc.co.uk/1/hi/scotland/north_east/8037404.stm | title=Offshore wind farm given EC boost | publisher=BBC News | date=7 May 2009 }} 7. ^1 2 {{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-14408064 | title=Wind farm project application for Aberdeen Bay | publisher=BBC News | date=5 August 2011 }} 8. ^{{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-21938247 | title=Consent for Donald Trump row wind farm announced | publisher=BBC News | date=26 March 2013 }} 9. ^{{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-22487325 | title=Aberdeen wind farm partner Vattenfall to reduce stake | publisher=BBC News | date=10 May 2013 }} 10. ^{{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-24734205 | title=Plans for wind test centre off Aberdeen suffers setback | publisher=BBC News | date=29 October 2013 }} 11. ^{{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-25235959 | title=Offshore wind farm plan opposed by Donald Trump is delayed | publisher=BBC News | date=5 December 2013 }} 12. ^{{citation| url=http://news.stv.tv/north/260306-vattenfall-have-appealed-against-council-decision-over-blackdog-substations/ | title=Energy giant to appeal rejection of £230m Aberdeen Bay wind farm | publisher=STV | date=14 January 2014 }} 13. ^{{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-28444474 | title=Substation near Donald Trump golf course to go ahead | publisher=BBC News | date=23 July 2014 }} 14. ^https://www.bbc.com/news/uk-scotland-north-east-orkney-shetland-36854835 15. ^1 2 3 4 5 6 7 {{cite web|url= http://www.4coffshore.com/windfarms/aberdeen-offshore-wind-farm-united-kingdom-uk47.html |title= Aberdeen Offshore Wind Farm |website= 4coffshore.com |accessdate= 2017-03-05}} 16. ^{{cite news|url= https://www.energyvoice.com/otherenergy/130374/130374/ |title= English firm Smulders wins Aberdeen Bay wind farm deal |website= energyvoice.com |first= Keith |last= Findlay |date= 2017-02-01 |accessdate= 2017-03-05}} 17. ^{{citation| url=http://www.heraldscotland.com/news/home-news/first-look-at-trump-plan-for-world-s-best-course-1.1007048?54107 | title=First look at Trump plan for 'world’s best course' | publisher=HeraldScotland | date=16 February 2010 }} 18. ^1 {{citation| url=http://news.bbc.co.uk/1/hi/scotland/north_east/5008624.stm | title=Fears over Trump's golfing plans | publisher=BBC News | date=24 May 2006 }} 19. ^{{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-15538505 | title=RSPB Scotland objection to Aberdeen offshore wind farm | publisher=BBC News | date=1 November 2011 }} 20. ^{{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-14923612 | title=Donald Trump sends wind farm complaint to Alex Salmond | publisher=BBC News | date=14 September 2011 }} 21. ^{{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-19848894 | title=Donald Trump in fresh Aberdeen wind farm attack | publisher=BBC News | date=5 October 2012 }} 22. ^{{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-22540249 | title=Donald Trump launches legal challenge to wind farm decision | publisher=BBC News | date=16 May 2013 }} 23. ^{{citation| url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-24909370 | title=Donald Trump challenge to Aberdeenshire wind turbines begins | publisher=BBC News | date=12 November 2013 }} 24. ^{{citation| url=https://www.telegraph.co.uk/news/uknews/scotland/10632178/Donald-Trump-loses-court-battle-against-offshore-wind-farm.html | title=Donald Trump loses court battle against offshore wind farm | publisher=The Daily Telegraph | date=11 February 2014 }} 25. ^{{cite news|url=http://www.eveningexpress.co.uk/news/local/trump-and-windfarm-team-face-courtroom-battle-over-aberdeen-turbines-plan-1.797187|title=Trump and windfarm team face courtroom battle over Aberdeen turbines plan |date=20 January 2015 |publisher=Evening Express}} 26. ^1 {{citation| url=http://news.stv.tv/north/1322381-donald-trump-loses-battle-over-aberdeen-bay-wind-farm-near-golf-course/ | title=Billionaire Donald Trump loses legal battle over offshore wind farm | publisher=STV | date=5 June 2015 }} 27. ^Trump International Golf Club Scotland Limited v The Scottish Ministers [2015] UKSC 74 28. ^{{cite news|url=https://www.scotsman.com/news/politics/main-players/donald-trump-opposed-wind-farm-in-aberdeen-bay-connected-to-grid-1-4717779|title=Donald Trump-opposed wind farm in Aberdeen Bay connected to grid|publisher=The Scotsman|date=3 April 2018}} 29. ^{{cite news|url=https://www.eveningexpress.co.uk/news/uk/first-foundation-installed-for-pioneering-offshore-wind-project/|title=First foundation installed for pioneering offshore wind project|publisher=Aberdeen Evening Express|date=26 March 2018}} 30. ^{{cite news|url=https://www.bbc.co.uk/news/uk-scotland-north-east-orkney-shetland-43713529|title=First European Offshore Wind Deployment Centre turbine installed|publisher=BBC News|date=10 April 2018}} 31. ^{{cite news|url=http://www.heraldscotland.com/news/16254263.Wind_farm_that_was_opposed_by_Donald_Trump_fitted_with_final_turbine/|title=Wind farm that was opposed by Donald Trump fitted with final turbine|publisher=The Herald|date=28 May 2018}} External links
4 : Wind farms in Scotland|Offshore wind farms in the North Sea|Buildings and structures in Aberdeenshire|Economy of Aberdeenshire |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。