请输入您要查询的百科知识:

 

词条 Everett station (MBTA)
释义

  1. Construction and history

  2. References

  3. External links

{{Infobox station
| name=Everett
| style=MBTA orange
| image=Everett (Main Line Elevated) station, 1918.jpg
| image_caption=Everett station in 1918, shortly before opening
| address=Broadway at Beacham Street,
Everett, Massachusetts
| coordinates={{coord|42|23|52.39|N|71|3|52.85|W|type:railwaystation_region:US-MA|display=inline,title}}
| line=Charlestown Elevated
| other=
| platform=2
| tracks=2
| parking=
| bicycle=
| passengers=
| pass_year=
| pass_percent=
| opened=March 15, 1919[1]
| closed=April 4, 1975[1]
| rebuilt=
| ADA=
| code=
| owned=Massachusetts Bay Transportation Authority
| zone=
| services={{s-rail|title=MBTA}}{{s-line|system=MBTA|line=Orange|previous=Sullivan Square|next=}}
}}Everett was a rapid transit station in Everett, Massachusetts. It served the MBTA's Orange Line. It opened in 1919 as an extension of the Charlestown Elevated, and served as its northern terminus until the Elevated was closed and demolished in 1975, when it was replaced by the Haymarket North Extension.[2][3]

Construction and history

In the 1910s and 1920s, the Boston Elevated Railway (BERy) had plans to extend the Charlestown Elevated to Malden, and the southern portion of this extension, including a drawbridge over the Mystic River, was built in the late 1910s. Everett station was opened in an isolated industrial area just north of the river crossing on March 15, 1919.[1]

Intended to be temporary and to be used only until full service to Malden was implemented, it was constructed of wood like a house rather than a permanent transit station. The light-duty construction style of this station was unique on the Elevated.[2] Due to opposition from Malden residents who preferred a tunnel due to the noise and vibration of the planned elevated line, the Malden extension was not built and Everett remained the terminus.[2] Although Everett thus became a semi-permanent station, it was never rebuilt from its "clapboard house" configuration, and began to look increasingly shabby as the years went by, acquiring a reputation to that effect among riders of the Elevated.

On March 30, 1963, the remaining trackless trolley lines feeding into Everett were replaced with diesel buses. This allowed the somewhat isolated station to be closed on nights and Sundays to improve passenger security and comfort, during which times the buses were simply extended to Sullivan Square.[1]

In the late 1960s and early 1970s, plans to reroute the Orange Line were implemented, culminating in the building of the Haymarket North Extension. The Haymarket North Extension rerouted the Orange Line into a new tunnel under the Charles River and from there followed the Haverhill Line north through Malden, somewhat to the west of the Charlestown Elevated's then-existing and previously-planned route. The Charlestown Elevated was closed on April 4, 1975, and the first section of the Haymarket North Extension was opened three days later.[1] Since then, all transit service to the city of Everett has consisted of buses terminating at Sullivan Square, Wellington, or Malden Center stations.[4]

{{clear left}}

References

1. ^{{NETransit}}
2. ^{{cite book|last1=Cheney|first1=Frank|last2=Sammarco|first2=Anthony Mitchell|date=2000|title=When Boston Rode the EL|url=https://books.google.com/books?id=snRWxEvlJqYC|publisher=Arcadia Publishing|isbn=978-0-7385-0462-9|access-date=May 26, 2015}}
3. ^{{cite web|url=http://bostontoat.blogspot.com/2011/04/history-of-el.html|title=YAY History: The "El"|last=Lampariello|first=Dan|date=April 30, 2011| website=Boston to a T|access-date=May 26, 2015}}
4. ^{{cite web|url=http://www.mbta.com/uploadedFiles/Schedules_and_Maps/System_Map/MBTA-system_map-5.pdf|title=Massachusetts Bay Transportation Authority System Map 5|date=2014|format=PDF|publisher=Massachusetts Bay Transportation Authority|accessdate=May 28, 2015}}

External links

{{commons category inline}}
  • An image of the station on its last day of operation
{{MBTA|state=collapsed}}

4 : Orange Line (MBTA) stations|Defunct railway stations in Massachusetts|Railway stations opened in 1919|Railway stations closed in 1975

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/26 2:22:00