请输入您要查询的百科知识:

 

词条 Gigafactory 1
释义

  1. History

  2. Rationale

      Factory location    State competition and incentives    Logistics    Construction    Future expansion  

  3. Operations

      Production    Cell level    Product level    Output goals  

  4. Future Gigafactories

  5. References

  6. External links

{{for|the first large Tesla factory|Tesla Factory}}{{Use mdy dates|date=September 2014}}{{Infobox factory
| name = Gigafactory 1
| image = File:Tesla's Gigafactory on 2017-08-08 by Planet Labs.jpg
| image_size =
| alt =
| caption = Top view, August 2017
| location_map = USA Nevada#USA
| location_map_size = 250
| location_map_caption =
| location_map_alt =
| coordinates = {{coord|39.538|N|119.440|W|type:landmark|display=inline,title}}
| built = January 2015[1] -2020
| operated = January 2016[2]
| location = Storey County, Nevada, U.S.
| industry = Energy storage
| products = Lithium-ion batteries
| employees =
| architect =
| style =
| area =
| volume =
| address =
| owner = Tesla Inc.
| defunct =
}}

The Tesla Gigafactory 1 is a lithium-ion battery and electric vehicle subassembly factory near Reno, Nevada[1][2][3]. The facility is owned and operated by Tesla, Inc. to supply the battery packs for its electric vehicles and stationary storage systems. It is located at the Tahoe Reno Industrial Center (TRIC) in Storey County, and employs around 3,000 people as of August 2018.[4]

The factory started limited production of Powerwalls and Powerpacks in the first quarter of 2016[5][6] using battery cells produced elsewhere, and began mass production of cells in January 2017.[9] Nevada Governor Brian Sandoval estimated that Nevada would enjoy $100 billion in economic benefit over two decades from the construction and operation of this factory.[7] The grand opening event was held on July 29, 2016.[8]

Gigafactory 1, in Nevada, is aligned on true north, which was done so that the equipment can be mapped by GPS and solar panels on the roof can be accurately aligned. Also the factory has been designed to be entirely energy self-reliant. Tesla intends to power the structure through a combination of on-site solar, wind and geo-thermal sources.[9] The building will have the largest footprint in the world and second largest volume when completed.[10]

Tesla also has Gigafactory 2 in Buffalo, New York, and has begun construction for Gigafactory 3 in Shanghai, China,[11][12][13][14] with plans underway to build another Gigafactory in Europe.

{{toclimit|3}}

History

Initial public mention of the gigafactory concept was made in November 2013,[15][16] although Tesla's internal plans predated that; Tesla had investigated almost 100 sites.

In July 2014, it was announced that Panasonic had reached a basic agreement with Tesla to invest in a factory,[20][17][18] estimated to cost $5 billion.[19][24] The TRIC owners gave the first 1,000 acres to Tesla for free.[20] The northern Nevada site and plans were announced with state officials on September 3, 2014.[3] Panasonic will lead the battery cell production portion of the manufacturing, and Tesla CEO Elon Musk indicated in 2015 that the total Panasonic investment would be {{USD|1.5–2 billion}},[21] and that Tesla would not expand beyond original plans.[22] In early 2016 Panasonic president Kazuhiro Tsuga confirmed a planned total investment of about $1.6 billion by the company to equip the factory to full capacity.[23] However, after the number of Model 3 reservations became known in April,[30] Panasonic moved production plans forward[24][25] and announced a bond sale for $3.86 billion, most of it to be invested in Gigafactory.[26][27][28]

Tesla held a grand opening on July 29, 2016 of the operational facility, having only three of the final 21 "blocks" of the gigafactory built out, or approximately 14 percent of the final factory size, which is expected to be completed by 2020.[36] By September 2016 Tesla had spent $608 million on the Gigafactory.[29]

In October 2016, it was announced that Tesla would build motors and drive units at the Gigafactory, in addition to the previously announced batteries and assembled battery packs called Powerpacks.[31]

By November 2018, as the Model 3 production had successfully ramped up to approximately 5000 vehicles a week for several months, the production rate of battery cells in the Gigafactory had reached 3.5 million 2170 cells per day.[32]{{rp|1:08}}

Rationale

Tesla expects that Gigafactory 1 will reduce the production cost for assembling electric vehicle battery packs from overseas suppliers of batteries and Powerwall and Powerpack packs assembly by 30%. Its projected capacity for 2018 is 50 (GWh)/yr of battery packs, and its final capacity upon completion was, {{as of|May 2016|lc=yes}}, planned to be 150 GWh/yr of battery packs.[33] This would enable Tesla to produce 1,500,000 cars per year.[34]{{primary source inline|date=August 2016}}[24]{{failed verification|date=August 2016}}

The factory is designed to optimize quality while minimizing cost of production battery packs and raw material utilization through vertical integration. Tesla expects to achieve a cost target for production battery packs of under {{USD|100}} per kWh of energy storage by 2020, near the "inflection point at which it begins [to cost] less to build an electric powertrain than [an internal combustion engine powertrain] even without subsidies or [considering] the savings of electricity vs. gas."[36]

Tesla claims that Gigafactory will assemble battery packs from batteries purchased overseas for significantly less cost using economies of scale, innovative manufacturing, reduction of waste, and the simple optimization of locating most manufacturing assembly processes under one roof.[35]

Factory location

{{Pie chart
| thumb = right
| caption = Grants and tax abatements for Gigafactory until year 2034[46][47][48]
| other =
| label1 =$120M: Investment-dependable transferable tax credits, mostly from film tax
| value1 =9
| color1 =yellow
| label2 = $75M: $12,500-per-job transferable tax credits (6,000 jobs)
| value2 =6
| color2 =gold
| label3 =$725M: 20-year 100% sales tax abatement
| value3 =56
| color3 =olive
| label4 =$332M: 10-year 100% property tax abatement
| value4 =26
| color4 =brown
| label5 =$27M: 10-year 100% modified business tax abatement
| value5 =2
| color5 =blue
| label6 = $8M: Discounted electricity rates for eight years
| value6 =1
| color6 =red
}}

Tesla initially considered several sites, but northern Nevada was not one of them. A manager at Reno–Tahoe International Airport offered some of its 3,000 available acres at Reno Stead Airport, and persuaded TRIC owner to split the bill for a private jet to fly Tesla people to the area. They tried several times, and Tesla eventually came to TRIC and was pleased by the speed of regulatory work.[36][37][38]

State competition and incentives

At least five states competed to attract Gigafactory by offering tax incentives, cash grants[39][40] and other methods in the hope of future business; California,[41][42] Arizona,[43] Nevada,[44] New Mexico, and Texas,[45] where San Antonio had offered bigger incentives with no sales tax, but did not get the factory. States without sales tax were topping the list of preferred sites.[46][44][46][47][48]

Nevada estimates a tax base of $1.9 billion over 20 years.[49] After sticky negotiations,[48] Tesla chose the Tahoe-Reno Industrial Center (TRIC) as the location of the Gigafactory mainly due to speed[44] and a State of Nevada incentive package. Other location reasons were rail access, direct sale ability,[40][46] and low air humidity.[50]

The incentives include $195 million in transferable tax credits depending on Tesla's investment schedule and job creation, similar to the Volkswagen Chattanooga Assembly Plant deal and others.[46][47][48][51] Tesla's investments earn them about $10 million in tax credits per quarter,[52][53][54] and by July 2016 had sold these for $20 million cash.[55] At the end of 2016, Tesla and Panasonic had 477 employees and 5,591 construction workers, mostly Nevada residents, and invested $1.1b earning $59m in tax credits.[56]

The incentive package also includes 20 years free from sales tax and 10 years free from property tax, depending on Tesla's ability to meet performance expectations (like investing $3.5 billion in Nevada).[46][48] By 2034, this package could have accumulated to a value of $1.25 billion in missed taxes; the 10th largest in the US. The $725M sales tax abatement was particularly important, as 5 other states charge no sales tax at all and 34 states, including Arizona and Texas, don't charge sales tax on manufacturing equipment.[57][47] With a tax base of $1.9 billion and an incentive package of $1.25 billion, the projected end result was calculated as a tax-per-abatement ratio of 1.52.[58][44][59] The nearby data centers from Apple Inc. and Switch also received incentives.[44][60]

Nevada estimates the construction impact at $2.4 billion and the economic impact from the project at $100 billion over two decades ($5 billion/year, of which $353 million are wages).[58][49] Some economists said that number was "deeply flawed," for instance, it counted every Tesla employee as if they would otherwise have been unemployed and made no allowance for increased government spending to serve the influx of thousands of local residents.[7][61][62][63][64][65][66] Tesla agreed to pay $7.5M per year for 5 years ($37.5M) to the school system.[57]

Logistics

The 6-mile Nevada State Route 439/USA Parkway was built by TRIC, and connects TRIC to Interstate 80. Since 2004, the TRIC owners had planned to extend SR 439 south to U.S. Route 50.[67] In 2014, Nevada Department of Transportation advanced the otherwise dormant south extension.[68][69][70][71] This improves traffic conditions for the many large logistics centres at TRIC and Gigafactory, bypassing Reno on the way to U.S. Route 50.[72][73] Tesla plans to ship batteries by rail[74] to its car factory in Fremont.[40][75]Water is scarce in Nevada, and some of the water for the Gigafactory is piped from a treatment plant in neighboring Washoe County.[48] A {{convert|1.5|USgal|liter|disp=preunit|million |million }} water tank is also used (about two Olympic-size swimming pools).[109][76][77]TRIC built high-pressure natural gas lines to its sites, but Tesla decided to use electricity and not connect natural gas to Gigafactory.[78] Heat pump technology is used for heating,[79][80] and a $6.8 million energy storage tank is scheduled for the site.[109] In 2014 Navigant estimated 100 MW electricity delivery which could be supplied (on average) by nearby wind turbines and roof solar panels,[81] whereas a former Tesla logistics manager in 2016 estimated 300 MW to produce 35 GWh of battery capacity per year.[82]

Tesla works with a mining company to extract lithium {{convert|200|mi|km|abbr=out|-1}} to the southeast, at Silver Peak in Esmeralda County. They intend to process the underground brine water industrially over hours rather than the traditional way of letting the water evaporate from ponds over a year.[45][83]

Construction

Tesla had already started brush clearing[84] and grading[44] during the summer of 2014[85] (prior to official announcement in September; permit date was June 26),[109] with vertical construction reported in January 2015.[86] Tesla and its partners intend to complete the facility by 2018.[125] On March 18, 2016 a group of journalists were allowed to visit the Gigafactory under strict conditions and found that 14% of the final building area had been completed.[126] By April 2016 there were around 600 construction workers.[87] Depending on season and building stage, the number of construction workers has fluctuated between 250 and 1,800.[88] On June 13, 2016, Tesla filed for a $63m expansion into section E on the site. By September 2016, the building had grown to {{convert|1.9|sqft|m2|1|abbr=on|disp=preunit|million |million }} with further areas under construction.[89] {{Asof|January 2017}} the building's footprint is {{convert|1.9|sqft|m2|1|abbr=on|disp=preunit|million |million }} with {{convert|4.9|sqft|m2|1|abbr=on|disp=preunit|million |million }} of usable area across several floors.[90] A combined permit value of $322m was registered in July 2016,[91] and $1.2b in July 2017.[92]

Gigafactory and the other large companies affect the local area by increased needs in transportation (SR 439) and housing;[93] house prices increased by 17% in 2015 from half of the peak in the previous 2008 building bubble. Local businesses were wary of building new homes, which is being done mostly by out-of-state companies.[94]
Design features
HVAC equipment is located "between the floors rather than on walls and ceilings of a floor."[36] All steel is from the US. Tesla is its own contractor on the project, learning how to build other factories should they choose so.[95][76]

Future expansion

Prior to the building of more gigafactories (see below), Tesla may expand and potentially double the size of Gigafactory 1. In June 2015, Tesla announced it exercised its option to buy {{convert|1864|acre|ha|abbr=off}} of land adjacent to the original {{convert|1000|acre|adj=on}} Gigafactory site. According to Tesla spokeswoman Alexis Georgeson, "The purchase gives us the opportunity for future growth." In Tesla's dealings with the state of Nevada expanding the size was always an option should the company choose to do so, said Steve Hill, director of the Governor's Office of Economic Development. "Tesla had said that the factory will be up to 10 million square feet [1 million square meters] in one or two stories," Hill said. "On the earnings call (in May 2015), Elon said they aren't yet committing to this but that they are considering increasing the size of the gigafactory here by 50 to 100 percent." [96]

Early estimates from 2014 projected that the factory would employ approximately 6,500 people by 2022, requiring at least half of them to be Nevadans.[58]

Operations

Tesla owns the land and building, and leases part of the building to Panasonic, which owns some of the cell production equipment.[97] The gigafactory is operated by a management team under executive Jens Peter Clausen, formerly a LEGO executive, who is VP of Gigafactory at Tesla.[98] By April 2016 Gigafactory had 317 Tesla employees and 52 by Panasonic, most of them from Nevada,[87] and 850 by December 2016.[99]

Production

The factory is intended to gradually[100][145] provide cradle-to-cradle handling of batteries, from raw material over components to finished products, and recycling old batteries into new.[24] Cells constitute most of the value creation, whereas packing and electronics are minor parts.[101] Tesla views production as more important than products, and assigns more engineers to developing production equipment than to developing products.[102][103][104]

Cell level

The basis of the energy storage system of Tesla products are lithium-ion cells in the 18650 form factor. These cylindrical cells have a diameter of 18 mm and are 65 mm in length, a size used for the batteries of laptops. Cylindrical cells are generally less expensive (costing 190–200 dollars per kWh as of 2014) than large format cells whose active layers are stacked or folded (approximately 240–250 dollars per kWh).[105]

The battery cells produced at the Gigafactory are of a new form factor, larger than the 18650 cells used in the Model S and Model X automobiles. While the cells were originally expected to be at least 20 mm in diameter and 70 mm in length,[106][107] revised specifications for the optimized form factor are {{convert|21|mm|abbr=on}} by {{convert|70|mm|abbr=on}}. Tesla thus refers to it as the '21–70',[108] whereas Samsung refer to the size as '21700'.[109] Panasonic is expected to begin cell production in 2016,[98] and continue for at least 10 years.[97] Only Panasonic cells are to be used in the Model 3.[110] Among the machines spotted at the opening in July 2016 were presses and rollers for cathodes.[111] Gigafactory began mass production of 21700 cells in January 2017.[112][113] Tesla uses Nickel Manganese Cobalt (NMC) lithium cells for stationary storage (Powerwall and Powerpack), and Nickel Cobalt Aluminium Oxide (NCA) for vehicles.[114]

Product level

In October 2015, Tesla moved the Tesla Powerwall and Powerpack production from its Fremont factory to the Gigafactory. The Tesla Powerwall has been produced in the finished portion since the third quarter of 2015.[115]

Output goals

{{asof|2014}}, the projected capacity of Gigafactory for 2020 was to have been 35 gigawatt-hours per year of cells as well as {{convert|50|GWh/year|MW}} of battery packs.[116] Production could be equivalent of supplying 500,000 Tesla cars per year.[117][118][119] When finished, the factory is planned to produce more lithium ion batteries in a year than were produced in the entire world in 2013.

Future Gigafactories

{{see also|Gigafactory 2|Tesla Gigafactory Europe}}

On April 30, 2015, Elon Musk announced that the factory heretofore known simply as the Gigafactory was now to be known as Gigafactory 1 as Tesla plans to build more such factories in the future. At the same event, Musk also said that he believed that other companies would build their own similar "Gigafactories".[1] After receiving $800M of orders ($179M PowerWall, $625M PowerPack) within 1 week of unveiling, Musk estimated that the Gigafactory 1 is not enough to supply demand.[120]

In May 2017 at a TED Talk, Elon Musk stated his intention to announce three or four new Gigafactory sites. These factories will manufacture both batteries and complete cars to enable "global production" of their products.[121]

References

1. ^{{cite web|url=https://www.youtube.com/watch?v=yKORsrlN-2k|title=Elon Musk Debuts the Tesla Powerwall|date=2015-04-30|website=YouTube|accessdate=2015-05-01}}
2. ^{{cite web|url=http://www.tahoereno.com/|title=Tahoe Reno Industrial Center|last1=|first1=|last2=|first2=|date=|website=|publisher=|accessdate=2014-09-22}}
3. ^{{cite news|url=https://www.nytimes.com/2014/09/05/business/energy-environment/nevada-a-winner-in-teslas-battery-contest.html|title=Nevada a Winner in Tesla’s Battery Contest|last=Wald|first=Matthew L.|date=2014-09-04|work=The New York Times|access-date=2017-01-05}}
4. ^{{Cite news|url=https://electrek.co/2018/08/21/tesla-gigafactory-1-3000-workers/|title=Tesla Gigafactory 1 now employs over 3,000 workers as it becomes biggest battery factory in the world|date=2018-08-21|work=Electrek|access-date=2018-10-31|language=en-US}}
5. ^{{cite news|url=https://vimeo.com/161138986 |title=Tesla Unveils Model 3|date= 2016-03-31|publisher=Tesla|accessdate= 2016-04-01}}
6. ^{{cite web|url= https://cleantechnica.com/2016/01/08/tesla-starts-off-2016-producing-delivering-powerwall/ |title=Tesla Starts Off 2016 By Producing & Delivering Powerwall |first=Adam |last=Johnston |work=CleanTechnica |date= 2016-01-08 |accessdate= 2017-01-06 }}
7. ^{{cite news |url=https://www.bloomberg.com/news/2014-09-05/nevada-expects-100-billion-impact-from-tesla-factory.html |title=Nevada Lures Tesla Plant With $1.3 Billion in Tax Breaks |work=Bloomberg |first1=James |last1=Nash |first2=Alan |last2=Ohnsman |date=2014-09-05 |access-date=2017-01-05}}
8. ^{{cite news |url=http://www.teslarati.com/tesla-gigafactory-grand-opening-event-july-29/ |title=Tesla sets July 29 date for Gigafactory Grand Opening event |work=Teslarati |date=2016-05-27 |access-date=2017-01-05}}
9. ^{{cite web|url= https://www.ted.com/talks/elon_musk_the_future_we_re_building_and_boring |title=Elon Musk: The future we're building – and boring |work=TED Talk |first=Elon |last=Musk |date=April 2017 |access-date=2017-07-02}}
10. ^{{Cite web|url=https://www.theverge.com/transportation/2018/11/30/18118451/tesla-gigafactory-nevada-video-elon-musk-jobs-model-3|title=Tesla will live and die by the Gigafactory|last=O'Kane|first=Sean|date=2018-11-30|website=The Verge|archive-url=|archive-date=|dead-url=|access-date=2018-12-04}}
11. ^{{cite news |url=https://www.scmp.com/news/china/diplomacy/article/2176692/hit-trade-war-tesla-opens-bid-process-build-china-gigafactory |title=Hit by trade war, Tesla opens bid process to build China Gigafactory |work=South China Morning Post |date=6 December 2018 |accessdate=17 December 2018 |quote=Shanghai Construction Group is among several firms bidding … Shanghai Baoye Group, a China Minmetals subsidiary, is preparing for the delivery of a large amount of concrete pipe piles and steel pile tips in the second half of December [2018]}}
12. ^{{cite news |url=https://electrek.co/2017/02/22/tesla-christens-buffalo-solar-factory-gigafactory-2-will-finalize-locations-of-gigafactory-3-4-and-possibly-5-this-year/ |title=Tesla christens Buffalo solar factory ‘Gigafactory 2’, will finalize locations of Gigafactory 3, 4 and possibly 5 this year |work=Electrek |date=2010-02-22}}
13. ^{{cite news |url=https://www.theverge.com/2016/11/8/13561146/tesla-acquisition-grohmann-automation-production |title=Tesla acquisition of Grohmann automation production |work=The Verge |date=2016-11-08}}
14. ^https://www.cnbc.com/video/2018/07/10/tesla-china-shanghai-gigafactory.html
15. ^{{cite news |url=http://www.mercurynews.com/business/ci_24531612/tesla-motors-may-make-its-own-batteries |title=2013: Tesla Motors may make its own batteries |author= |date=2014-11-15 |work=Mercury News |accessdate= 2016-08-01 }}
16. ^{{cite web |url=https://www.theverge.com/2013/11/6/5072186/tesla-giant-battery-factory-plans |title=Tesla's solution to battery shortages is to build its own 'giga factory' |first=Vlad|last=Savov |date= 2013-11-06 |work=theverge.com |accessdate= 2016-08-01 }}
17. ^{{cite news|url=http://asia.nikkei.com/Business/Deals/Panasonic-Tesla-agree-to-partnership-for-US-car-battery-plant |title=Panasonic, Tesla agree to partnership for US car battery plant |publisher=Nikkei Inc |date=2014-07-29 |accessdate=2014-08-01 |deadurl=yes |archiveurl=https://web.archive.org/web/20140731192257/http://asia.nikkei.com/Business/Deals/Panasonic-Tesla-agree-to-partnership-for-US-car-battery-plant |archive-date=2014-07-31}}
18. ^{{cite web|url= http://fortune.com/2014/07/31/tesla-panasonic-gigafactory/ |title=Tesla, Panasonic team up to build Gigafactory |work=Fortune |author=John Kell |date=2014-07-31 }}
19. ^{{cite web|url=http://www.slashgear.com/teslas-nevada-gigafactory-to-cost-5-billion-16365021/ |title=Tesla’s Nevada Gigafactory to cost $5 billion|work=SlashGear|accessdate= 2016-05-29}}
20. ^{{cite web|url=http://lasvegassun.com/news/2014/dec/30/lance-gilmans-43-million-tesla-payoff-has-critics-/ |archiveurl=https://web.archive.org/web/20160330005510/http://lasvegassun.com/news/2014/dec/30/lance-gilmans-43-million-tesla-payoff-has-critics-/ |title=Lance Gilman’s $43 million Tesla payoff has believers — and critics |date=2014-12-30 |archivedate=2016-03-30 |work=Las Vegas Sun |accessdate=2016-10-23 |deadurl=no |quote=Free of charge, they dished Tesla nearly 1,000 acres to build its factory at TRIC}}
21. ^{{cite news| url=https://www.bloomberg.com/news/articles/2015-03-27/tesla-pushes-japanese-suppliers-as-it-seeks-battery-partners | work=Bloomberg | first=Craig | last=Trudell | title=Tesla Pushes Japanese Suppliers as It Seeks Battery Partners | date= 2015-03-27}}
22. ^{{cite web|url=http://lasvegassun.com/news/2015/jul/15/1800-acre-purchase-expands-teslas-footprint-near-r/ |title=1,800-acre purchase expands Tesla's footprint near Reno|work=Las Vegas Sun |date=2015-07-15 |accessdate= 2016-10-23}}
23. ^{{citation| url = https://www.wsj.com/articles/panasonic-will-bet-big-on-gigafactory-1452189826| title = Panasonic Will Bet Big on Gigafactory| first =Mike| last = Ramsey| date = 2016-01-07 | work = www.wsj.com }}
24. ^{{cite web|url=http://asia.nikkei.com/Business/Companies/Panasonic-to-jump-start-US-battery-cell-output-for-Tesla |archiveurl=https://web.archive.org/web/20160710105943/http://asia.nikkei.com/Business/Companies/Panasonic-to-jump-start-US-battery-cell-output-for-Tesla |title=Panasonic to jump-start US battery cell output for Tesla |date=2016-06-21 |archivedate=2016-07-10 |work=Nikkei Asian Review |accessdate=2016-10-23 |deadurl=no}}
25. ^{{cite web|url= http://www.sfgate.com/business/article/Tesla-slams-the-accelerator-on-Gigafactory-8425753.php |title=Tesla slams the accelerator on Gigafactory|date= 2016-07-27 |work=SFGate |accessdate= 2016-10-25}}
26. ^{{cite web|url=https://finance.yahoo.com/news/panasonic-raise-3-9-billion-091120222.html |title=Panasonic to raise $3.9 billion, partly to finance Tesla plant investment|publisher=Reuters |date= 2016-07-29}}
27. ^{{cite web|url=http://www.thecountrycaller.com/48303-tesla-motors-inc-nasdaqtsla-stock-jumps-on-panasonics-39-billion-for-gigafactory/|title=Tesla Motors, Inc. (NASDAQ:TSLA) Stock Jumps On Panasonic's $3.9 Billion For Gigafactory|work=The Country Caller|date=2016-07-29|accessdate=2016-09-04|deadurl=yes|archiveurl=https://web.archive.org/web/20160911140731/http://www.thecountrycaller.com/48303-tesla-motors-inc-nasdaqtsla-stock-jumps-on-panasonics-39-billion-for-gigafactory/|archivedate=2016-09-11}}
28. ^{{cite web |url= http://www.thecountrycaller.com/51161-tesla-motors-inc-tsla-expects-to-spend-2-billion-on-gigafactory-construction/ |title= Tesla Motors Inc Expects To Spend $2 Billion On Gigafactory Construction |work= The Country Caller |date= 2016-08-08 |accessdate= 2016-09-04 |deadurl= yes |archiveurl= https://web.archive.org/web/20160911141931/http://www.thecountrycaller.com/51161-tesla-motors-inc-tsla-expects-to-spend-2-billion-on-gigafactory-construction/ |archivedate=2016-09-11}}
29. ^{{cite web |url= https://www.sec.gov/Archives/edgar/data/1318605/000156459016026820/tsla-10q_20160930.htm |title=Form 10-Q For the quarterly period ended September 30, 2016. Commission File Number: 001-34756 |last= |first= |date=2016-11-01 |website= |publisher=Tesla Motors |access-date=2017-01-06 |page=17|quote=We have incurred $608.4 million of costs for our Gigafactory as of September 30, 2016.}}
30. ^{{cite web|url=https://www.thestreet.com/story/13667117/1/in-another-after-hours-news-dump-tesla-reveals-gigafactory-woes-and-possible-sec-probe.html |title=Tesla Reveals Gigafactory Woes, Possible SEC Probe in Latest After-Hours News Dump|date= 2016-08-05 |work=TheStreet.com |accessdate= 2016-08-06}}
31. ^{{cite news|url= https://electrek.co/2016/10/15/tesla-drive-unit-production-lines-gigafactory-model-3/ |title= Tesla is building new ‘drive unit production lines’ at the Gigafactory, will not only manufacture battery packs |website= electrek.co |first= Fred |last= Lambert |date= 2016-10-15 |accessdate= 2017-02-04}}
32. ^{{cite AV media |url=https://www.youtube.com/watch?v=tdUX3ypDVwI |people=Chris Lister, VP of Gigafactory; Jat Dhillon, Director of Manufacturing |title=This is Elon Musk's key to Tesla's future |date=30 November 2018|medium=video | location= | publisher=The Verge |via=YouTube |accessdate=2 December 2018}}
33. ^{{cite web|url=https://electrek.co/2016/05/31/tesla-triple-battery-output-gigafactory-1-150-gwh-elon-musk/|title=Tesla could triple the planned battery pack output of ‘Gigafactory 1’ to 150 GWh, says Elon Musk|date=2016-06-01 |website=electrek.co|accessdate=2018-01-02}}
34. ^{{cite web |url=https://www.tesla.com/videos/tesla-gigafactory-grand-opening |title=Tesla Gigafactory Grand Opening Video |date=2016-07-30 }}
35. ^{{cite web |url=https://www.tesla.com/gigafactory |title=Tesla Gigafactory |publisher=Tesla Inc |access-date=2017-07-02}}
36. ^{{youtube|WryEJiFZPwc|Commissioner Lance Gilman RMC Presentation, at 13m}}
37. ^{{cite web|url= http://www.rgj.com/story/money/business/2016/01/28/northern-nevadas-direction-seize-opportunity-and-work-hard/79491936/ |title=Northern Nevada's Direction: Seize opportunity and work hard |first=Mike |last=Higdon |date= 2016-01-28 |work=Reno Gazette Journal|accessdate= 2016-11-06 |quote=Originally, they hadn't considered Northern Nevada at all. But Tina Iftiger, vice president of airport economic development at Reno-Tahoe International Airport, helped convince Tesla executives to visit the region over and over again until they put it on the list.}}
38. ^{{youtube|18hiTBDLki0|Tesla – Tahoe Reno Industrial Center, Dean Haymore from Story County Commission, at 2m}}
39. ^{{cite web|url= https://www.greentechmedia.com/articles/read/Teslas-5B-Giga-Battery-Factory-and-Deep-Politics-in-AZ-TX-NV-and-NM |title=Tesla’s $5B Giga Battery Factory and Deep Politics in AZ, TX, NV and NM|first=Eric |last=Wesoff |publisher=GTM |date=2014-03-01 |accessdate= 2016-11-04}}
40. ^{{cite web|url= http://jalopnik.com/why-this-state-is-the-most-likely-to-get-teslas-gigafa-1554902271 |title=Why This State Is The Most Likely To Get Tesla's Gigafactory|work=Jalopnik |date=2014-01-04 |accessdate= 2016-11-04 |quote=A variety of factors will enter into Tesla's decision. First, you have your obvious ones for any such project like land availability, taxes, and tax incentives}}
41. ^{{cite news |url=https://www.forbes.com/sites/michelinemaynard/2014/05/26/californias-improbable-bid-to-land-teslas-gigafactory/ |title=California's ‘Improbable’ Bid To Land Tesla's Gigafactory |work=Forbes |date=2014-05-26}}
42. ^{{cite news |url=http://www.mercurynews.com/business/ci_25906801/california-makes-big-play-land-tesla-battery-gigafactory |title=California makes big plans to land Tesla battery ‘gigafactory’ |work=San Jose Mercury-News |date=2014-06-06}}
43. ^{{cite web|url=http://www.recode.net/2016/10/20/13341340/atieva-launch-december |title=Atieva will launch its Tesla competitor by December|date= 2016-10-20 |work=Recode |accessdate= 2016-10-21}}
44. ^{{cite web|url=http://www.rgj.com/story/news/2014/09/13/art-tesla-deal-nv-won-gigafactory/15593371/ |title=Art of the Tesla deal: How Nevada won a gigafactory |first=Jason |last=Hidalgo |date= 2014-09-16|work=Reno Gazette Journal|accessdate= 2016-10-25|quote=It's a real get things done state. That was a really important part of the decision .. Tesla does not want to deal with stalled development}}
45. ^{{cite web|url= http://www.mystatesman.com/news/business/how-did-texas-lose-its-bid-for-teslas-gigafactory/nhF48/ |title=Tesla dashes Texas’ hope for gigafactory |first=Brian|last=Gaar |publisher=Austin American-Statesman |date=2014-09-04 |accessdate= 2016-10-21}}
46. ^How did Texas lose its bid for Tesla's 'gigafactory'? [https://web.archive.org/web/20160801154930/http://www.theboydcompany.com/docs/Intelligent%20Utility.pdf Archive] 2014-09-04
47. ^{{cite web|url= http://www.eenews.net/stories/1060027985 |archiveurl= https://web.archive.org/web/20160322140719/http://www.eenews.net/stories/1060027985 |title=TECHNOLOGY: Gigafactory lands on Tesla's fast track to Big Battery era |first=Joel |last=Kirkland |date=2015-11-16 |archivedate=2016-03-22 |publisher=EnergyWire |accessdate=2016-11-06 |deadurl=no |quote="We didn't have the biggest incentive package, we know that," said Mike Kazmierski, president of the Economic Development Authority of Western Nevada. Since the Great Recession, states have shelled out billions of dollars in incentives. Tennessee, with the 11th highest poverty rate in the nation, helped Volkswagen amass $566 million in tax breaks in 2008 to build a $1 billion plant in Chattanooga. Nearly $400 million in additional state and local incentives have gone toward expanding the plant since then, according to the Institute for Southern Studies. In 2012, Pennsylvania agreed to $1.6 billion in tax credits for Royal Dutch Shell PLC to build an ethane cracker north of Pittsburgh. Shell hasn't said whether it plans to build the plant. The Legislature in Washington state agreed to a record $8.7 billion package for Boeing in 2013. Tesla was "really concerned about scheduling risk."}}
48. ^{{cite web|url= https://www.ralstonreports.com/blog/my-column-year-changed-nevada-untold-details-how-tesla-deal-was-done |archiveurl= https://web.archive.org/web/20150810202604/https://www.ralstonreports.com/blog/my-column-year-changed-nevada-untold-details-how-tesla-deal-was-done |authorlink=Jon Ralston |first=Jon |last=Ralston |title=The year that changed Nevada – the untold details of how the Tesla deal was done |date=2014-10-04 |archivedate=2015-08-10 |work=Ralston Reports |accessdate=2016-11-06 |deadurl=no |quote=Nevada was fourth in line for the plant with its RFI, about $650 million short on the abatements and $900 million short overall. Hill said he believed that Texas and New Mexico were the main competition. But O’Connell said it was never that simple, that the process was multilayered and not linear. “It’s a dynamic process, it’s an iterative process and it’s taking place at at least two levels,” he explained. “At one level, we had teams literally looking at dirt…the viability of a physical location. At another level, the conversation was between ourselves and the economic development folks about what kinds of financial programs can be used.” ..if Nevada was going to win out over other states with larger incentive packages: “We’ve got to close this gap somehow. It just has to happen or we’re not going to be able to do this” said Steve Hill from the Nevada authorities}}
49. ^{{cite web |url=http://www.diversifynevada.com/documents/Teslas_Gigafactory_Incentive_Summary_PDF.pdf |title=Tesla’s Gigafactory in Nevada |work=Diversify Nevada |location=US |access-date=2016-12-05}}
50. ^{{cite web|url= https://www.fastcompany.com/3052889/elon-musk-powers-up-inside-teslas-5-billion-gigafactory |title=Elon Musk Powers Up: Inside Tesla's $5 Billion Gigafactory |first=Max |last=Chafkin |date= 2015-11-17 |work=Fast Company|accessdate= 2016-11-29 |quote=Battery production requires very low humidity}}
51. ^{{cite web|url=https://electrek.co/2016/11/25/tesla-subsidies-big-three-oil-industry/ |title=Tesla received only a fraction of the subsidies the Big Three and oil industry have received |date=2016-11-25 |first=Fred|last=Lambert |work=Electrek|accessdate= 2016-11-26}}
52. ^Tesla Gigafactory Quarterly Activity Report (Q1 2016) Diversify Nevada
53. ^Tesla Gigafactory Quarterly Activity Report (Q2 2016) Diversify Nevada
54. ^{{cite web|url= https://electrek.co/2016/12/06/tesla-gigafactory-tax-credit-job-nevada/ |title=Tesla receives $8 million in tax credit for the Gigafactory after passing audit for job & investment requirements |date= 2016-12-06 |first=Fred|last=Lambert |work=Electrek|accessdate= 2016-12-06 |quote=331 employees at the factory with 89% of them Nevada residents.}}
55. ^{{cite web|url= http://kunr.org/post/tesla-sold-20-million-tax-credits-vegas-casino |title=Tesla Sold $20 Million In Tax Credits To Vegas Casino|publisher= |date=2016-06-29 |accessdate= 2016-10-23}}
56. ^{{cite web |url=http://diversifynevada.com/uploads/reports/Tesla_Motors_Audit_Certification_10.1.2016_to_12.31.2016.pdf |title=Tesla Gigafactory Compliance Audit Report (Exhibit A)] |page= 6+11. |publisher=Diversify Nevada / Office of Economic Development |location=US |date=2017-06-01 |access-date=2017-09-11}}
57. ^{{cite web|url= http://www.rgj.com/story/news/2014/09/04/nevada-strikes-billion-tax-break-deal-tesla/15096777/ |title=Inside Nevada's $1.25 billion Tesla tax deal |first=Anjeanette |last=Damon |date= 2014-09-16|work=Reno Gazette Journal|accessdate= 2016-11-03 |quote= the company must invest a minimum of $3.5 billion in manufacturing equipment and real property in the state. Five other states charge no sales tax at all and 34 states, including Arizona and Texas, don't charges sales tax on manufacturing equipment.}}
58. ^ Incentive Agreement page 5+6, pdf page 26+90, 57–69. Quote:"Tax abatements were considered by Tesla to be a crucial part of its financial plan for the Gigafactory". "Credits {TTC A – on jobs. Up to 6,000 jobs $12,500 / job; $75.0 million} {TTC B – on investment. $3.5 billion investment 5% on $1B, 2.8% on $2.5B; $120.0 million} {Subtotal $195.0 million}". Size: 9MB in 98 pages
59. ^{{cite web|url=https://www.theverge.com/2016/2/8/10937076/tesla-gigafactory-battery-factory-nevada-tax-deal-elon-musk |title=Inside Nevada’s $1.3 billion gamble on Tesla|date= 2016-02-08 |publisher=Vox Media|work=The Verge |accessdate= 2016-05-29 }}
60. ^{{cite web|url= http://www.rgj.com/story/news/2015/01/15/sandoval-major-data-center-project-coming-reno-area/21836041/ |title=Sandoval: $1B Switch data center coming to Reno area|date= 2015-01-16|work=Reno Gazette Journal|accessdate= 2016-10-23}}
61. ^{{cite news |url=http://www.greentechmedia.com/articles/read/Reports-Tesla-Selects-Nevada-as-Giga-Battery-Factory-Site |title=Reports: Tesla Selects Nevada as Giga Battery Factory Site |first=Eric |last=Wesoff |work=Greentech Media |location=US |date=2014-09-03 |accessdate=2014-10-09}}
62. ^{{cite news |url=http://www.latimes.com/business/la-fi-hy-musk-subsidies-20150531-story.html#page=1 |title=Elon Musk's growing empire is fueled by $4.9 billion in government subsidies |first=Jerry |last=Hirsch |date=2015-05-30 |work=Los Angeles Times |accessdate=2015-10-29 |archiveurl= https://web.archive.org/web/20151028102956/http://www.latimes.com/business/la-fi-hy-musk-subsidies-20150531-story.html |archivedate=2015-10-28 |deadurl=no}}
63. ^{{cite news |url=http://www.latimes.com/business/la-fi-hy-musk-subsidies-20150531-story.html#page=1 |title=Three companies, $4.9 billion in government support|first=Jerry |last=Hirsch |date=2015-05-30 |work=Los Angeles Times |accessdate=2015-10-29 |archiveurl= https://web.archive.org/web/20151025213157/http://www.latimes.com/local/la-fi-hy-musk-subsidies-box-20150530-story.html |archivedate=2015-10-25 |deadurl=no}}
64. ^{{cite web|url=http://www.latimes.com/business/autos/la-fi-hy-musk-subsidies-20150602-story.html |title=Elon Musk: 'If I cared about subsidies, I would have entered the oil and gas industry' |first=Jerry |last=Hirsch |date=2015-06-02 |work=Los Angeles Times |accessdate=2015-10-29 }}
65. ^{{cite web|url= https://www.rt.com/usa/264065-musk-tesla-government-subsidies/ |title=Musk defends receiving $4.9 billion in government support for Tesla, SolarCity and SpaceX|work=RT English |accessdate=2015-10-29 }}
66. ^{{cite web|url= https://electrek.co/2015/06/02/complete-breakdown-of-the-4-9-billion-in-government-support-the-la-times-claims-elon-musks-companies-are-receiving/ |title=Complete breakdown of the $4.9 billion in government support the LA Times claims Elon Musk's companies are receiving |first=Fred|last=Lambert |work=Electrek |date=2015-06-02 |accessdate=2016-08-19}}
67. ^{{cite web |url=http://www.nevadaappeal.com/apps/pbcs.dll/article?AID=/20040905/NEWS/109050016/0/ARCHIVES |title=18 mile road next on slate for industrial center |work=Nevada Appeal |date=2004-09-05 |accessdate=2007-01-03}}{{subscription required}}
68. ^{{cite web|url= https://www.nevadadot.com/Projects_and_Programs/Road_Projects/USA_Parkway_-_I-80_to_U_S__50.aspx |title=Nevada Department of Transportation|publisher=}}
69. ^{{cite web |url=https://www.nevadadot.com/doing-business/about-ndot/transportation-board-of-directors |title=Transportation Board of Directors |publisher=Nevada Department of Transportation |access-date=2017-07-02}}
70. ^{{cite web|url= http://www.rgj.com/story/money/business/2015/07/29/usa-parkway-extension-sr-439-ndot-update/30628763/ |title=USA Parkway construction bids due in the fall|publisher=}}
71. ^{{cite web|url=http://www.reviewjournal.com/news/nevada/nevada-approves-70-million-tesla-related-road-work |title=Nevada approves $70 million for Tesla-related road work |first=Richard N. |last=Velotta |work=Las Vegas Review Journal |date=2014-10-11|access-date=2017-01-05}}
72. ^{{cite web|url= http://www.forconstructionpros.com/news/12218076/nevada-department-of-transportation-breaks-ground-on-usa-parkway-state-route-439-extension-project |title=Nevada Department of Transportation Breaks Ground on USA Parkway (State Route 439) Extension Project |publisher=}}
73. ^{{cite web|url= http://www.ktvn.com/story/36236455/sandoval-tesla-attend-usa-parkway-ribbon-cutting1 |title=NDOT Officially Opens USA Parkway Extension |first=Paul |last=Nelson |publisher=KTVN |date= 2017-09-08 |accessdate= 2017-09-13}}
74. ^{{cite web |url=https://öpnvkarte.de/#-119.2589;39.6306;11 |title=OpenRailwayMap |work=ÖPNVKarte |access-date=2017-07-02}}
75. ^{{cite web|url=http://www.reviewjournal.com/news/nevada/tesla-officials-show-progress-gigafactory-northern-nevada |title=Tesla officials show off progress at Gigafactory in Northern Nevada |first=SEAN WHALEY LAS VEGAS REVIEW-JOURNAL CAPITAL |last=BUREAU |date=2016-03-18 |publisher= |archiveurl=https://web.archive.org/web/20160803161348/http://www.reviewjournal.com/news/nevada/tesla-officials-show-progress-gigafactory-northern-nevada |archivedate=2016-08-03 |deadurl=no}}
76. ^{{cite web|url= https://www.buildzoom.com/blog/teslas-gigafactory-grand-opening-nowhere-near-done-construction-2 |title=Tesla’s Gigafactory: A Grand Opening and Nowhere Near Done with Construction |first=Jack |last=Cookson |publisher=BuildZoom |date= 2016-06-23 |accessdate=2016-11-29}}
77. ^{{cite web|url= http://www.businessinsider.my/tesla-gigafactory-facts-2016-9/12/ |title=21 incredible facts about Elon Musk's Gigafactory – Page 12 of 22 – Business Insider|work=Business Insider|date= 2016-11-13 |accessdate= 2016-11-29}}
78. ^{{cite web|url= http://www.greencarreports.com/news/1105404_tesla-gigafactory-energy-no-solar-panels-yet-but-no-natural-gas-at-all |title=Tesla Gigafactory energy: no solar panels yet, but no natural gas at all|first=Stephen |last=Edelstein |date= 2016-08-05|work=Green Car Reports|accessdate= 2016-12-20}}
79. ^{{cite web |url= https://cleantechnica.com/2015/11/10/gigafactory-renewable-energy-plans-slip/ |title=Gigafactory Renewable Energy Plans Slip Out |last=Field |first=Kyle |date=2015-11-10 |website=Cleantechnica |publisher= |access-date= 2016-12-20 |quote=}}
80. ^{{cite web|url= http://www.inc.com/lisa-calhoun/elon-musks-tesla-gigafactory-launches-epic-zero-emission-american-manufacturing-.html |title=Elon Musk's Tesla Gigafactory Launches Epic, Zero-Emission American Manufacturing Era |first=Lisa |last=Calhoun |work=Inc.com |date=2015-08-01 |accessdate= 2016-12-20}}
81. ^{{cite web|url= http://www.engineering.com/ElectronicsDesign/ElectronicsDesignArticles/ArticleID/8436/Can-Tesla-Power-Its-Gigafactory-with-Renewables-Alone.aspx |title=Can Tesla Power Its Gigafactory with Renewables Alone? |publisher=ENGINEERING.com |first=Tom |last=Lombardo |date=2014-09-07 |accessdate= 2016-11-29 }}
82. ^{{cite web|url= http://www.nyteknik.se/fordon/tesla-avhopparen-vill-starta-svensk-batterifabrik-6791926 |title=Tesla-avhopparen vill starta svensk batterifabrik|work=Ny Teknik |date=2016-09-29 |accessdate= 2016-11-18 |quote=Battery production is both energy and power consuming and a Gigafactory about 35 GWh estimated to have a connection of 300 MW}}
83. ^{{cite web|url=https://www.cnbc.com/2016/07/25/there-is-a-race-for-lithium-going-on-in-nevada.html |title=There is a race for lithium going on in Nevada|first=Phil|last=LeBeau|date= 2016-07-26|publisher=}}
84. ^{{cite web|url=http://www.rgj.com/story/money/business/2015/02/04/elon-musk-says-tesla-gigafactory-big-bet-construction-costs-technobubble/22825137/ |title=Elon Musk: Tesla Gigafactory 'a huge bet'|date= 2015-02-04 |work=Reno Gazette Journal|accessdate= 2016-10-22}} Gallery of early construction
85. ^{{cite web|url= http://www.rgj.com/wlna/money/business/2014/07/31/tesla-tahoe-reno-industrial-centers-appeal/13444533/ |title=Tesla: Tahoe-Reno Industrial Center's appeal|publisher=|date=2014-08-01 |accessdate= 2016-10-23}}
86. ^{{cite news |url=http://www.rgj.com/picture-gallery/news/2015/01/08/tesla-construction/21467201/ |title=Photos: Structure taking shape on Tesla property |work=Reno Gazette-Journal |date=2015-01-08 |access-date=2017-01-05}}
87. ^{{cite web|url=http://electrek.co/2016/05/09/tesla-gigafactory-panasonic-q1-2016/ |title=Panasonic doubled its investment in the Tesla Gigafactory during the last quarter [Q1 2016 Activity Report] |first=Fred|last=Lambert |date= 2016-05-09|publisher=}}
88. ^{{cite web|url= http://www.nevadaappeal.com/news/local/storey-county-bustling-since-tesla-motors-gigafactory-announcement/ |title=Storey County bustling since Tesla Motors gigafactory announcement|publisher= |date=2015-03-19 |accessdate= 2016-10-18}}
89. ^{{cite web|url= https://electrek.co/2016/09/25/tesla-gigafactory-aerial-shots-september-2016-update/ |title=Tesla Gigafactory: new aerial shots show plant more than doubling in size [September 2016 update]|date= 2016-09-25|work=Electrek |accessdate= 2016-10-18}}
90. ^{{cite news|url= https://electrek.co/2017/01/04/tesla-gigafacfory-january-2017/ |title= Tesla Gigafactory: new aerial pictures of the expansion at the battery factory – January 2017 |website= electrek.co |first= Fred |last= Lambert |date= 2017-01-04 |accessdate= 2017-02-04}}
91. ^{{cite web|url= http://electrek.co/2016/06/23/tesla-gigafactory-new-section-fifth-battery-cell-manufacturing-equipment/ |title=Tesla will add new section (5th) to the Gigafactory by December, Battery cell manufacturing equipment by July 20th |first=Fred|last=Lambert |date= 2016-06-23 |publisher=Electrek }}
92. ^{{cite web|url= https://www.buildzoom.com/property-info/electric-ave-mccarran-nv |archiveurl= https://web.archive.org/web/20170910192722/https://www.buildzoom.com/property-info/electric-ave-mccarran-nv |title=Building Permits at Electric Avenue, McCarran, NV, 89434|archivedate= 2017-09-10 |publisher=|accessdate= 2017-09-11 |deadurl=no}}
93. ^{{cite web|url= http://www.constructiondive.com/news/tesla-gigafactory-construction-driving-surge-in-nv-business-licenses/410315/ |title=Tesla gigafactory construction driving surge in NV business licenses|date= 2015-12-07 |work=Construction Dive|accessdate= 2016-12-19 }}
94. ^{{cite web|url= http://www.curbed.com/2016/1/5/10849762/tesla-faraday-future-housing-nevada |title=Tesla and Competitors Fuel Housing Boom in Nevada|date= 2016-01-05 |work=Curbed|accessdate= 2016-12-19 }}
95. ^{{cite web|url= https://www.theverge.com/2016/7/28/12299202/tesla-model-3-gigafactory-tour-elon-musk-photos-nevada |title=Tesla's entire future depends on the Gigafactory|date=2016-07-28 |publisher=Vox Media|work=The Verge|accessdate=2016-07-29}}
96. ^{{cite news|date=2015-07-20 |first= Jason |last=Hidalgo |url= http://www.rgj.com/story/money/business/2015/07/20/tesla-planning-double-gigafactory-plant-size/30313473/ |title= Going big: Will Tesla double size of gigafactory plant? |work= rgj.com |accessdate=2015-08-15}}
97. ^{{cite web|url= http://secfilings.nasdaq.com/filingFrameset.asp?FilingID=11631759&RcvdDate=10/11/2016&CoName=TESLA%20MOTORS%20INC&FormType=8-K&View=html |title=NASDAQ – SEC Filing, October 11, 2016|pages=16 of 26|publisher= |date=2016-10-11 |accessdate=2016-10-24}}
98. ^{{cite news |last=Lambert|first=Fred |url=http://electrek.co/2016/03/09/will-human-hands-ever-touch-tesla-gigafactory-battery-cells/ |title=Will human hands ever touch Tesla Gigafactory battery cells? |work=electrek |date=2016-03-09 |accessdate=2016-03-12 }}
99. ^{{cite news |last=Lambert|first=Fred |url= https://electrek.co/2016/12/08/tesla-gigafactory-workers-2017-production-ramp-up/ |title=Tesla Gigafactory now employs over 850 workers, 1,000 more to come in first half of 2017 with production ramp up |work=electrek |date=2016-12-08 |accessdate=2016-12-09 }}
100. ^{{cite web|url= http://qz.com/745278/teslas-entire-future-depends-on-the-gigafactorys-success-and-elon-musk-is-doubling-down/ |archiveurl= https://web.archive.org/web/20161019203555/http://qz.com/745278/teslas-entire-future-depends-on-the-gigafactorys-success-and-elon-musk-is-doubling-down/ |title=Tesla's (TSLA) future depends on the Gigafactory's success, and Elon Musk is doubling down on building the world's largest battery factory |date=2016-08-03 |first=Michael J. |last=Coren |archivedate= 2016-10-19 |work=Quartz|accessdate=2017-01-06 |deadurl=no |quote= it’s being built as a series of mini facilities, each one iterating on the design of the last. Although the first phase of the Gigafactory is not yet complete, construction is already underway on t the next (the factory’s exterior walls are removable). The first phase is more than double the capacity of a similar sized factory in Asia, said Yoshihiko Yamada, executive vice president of Panasonic, who was on-site working with Tesla’s engineers. Tesla plans to repeat this process numerous times.}}
101. ^Canis, Bill. "[https://fas.org/sgp/crs/misc/R41709.pdf Battery Manufacturing for Hybrid and Electric Vehicles: Policy Issues]" R41709. Congressional Research Service, April 4, 2013. Quote: "It has been estimated that 70% of the value added in making lithium-ion batteries is in making the cells, compared with only 15% in battery assembly and 10% in electrical and mechanical components."
102. ^{{cite web|url= https://www.tesla.com/blog/formation-of-tesla-advanced-automation-germany |archiveurl= https://web.archive.org/web/20161229125027/https://www.tesla.com/blog/formation-of-tesla-advanced-automation-germany |title=Formation of Tesla Advanced Automation Germany|date=2016-11-08 |archivedate= 2016-12-29 |publisher=Tesla |accessdate= 2017-01-05 |quote=As the machine that builds the machine, our factories are so important that we believe they will ultimately deserve an order of magnitude more attention in engineering than what they produce. |deadurl=no}}
103. ^{{cite web|url= https://www.usatoday.com/story/tech/news/2016/07/26/musk-ramps-up-teslas-critical-gigafactory/87590138/ |archiveurl= https://web.archive.org/web/20161017222713/http://www.usatoday.com/story/tech/news/2016/07/26/musk-ramps-up-teslas-critical-gigafactory/87590138/ |title=Elon Musk to ramp up Tesla's critical battery Gigafactory |first=Marco |last=della Cava |date= 2016-07-26 |archivedate= 2016-10-17|work=USA TODAY|accessdate= 2017-01-05 |quote=The factory itself is a product. It's the machine that builds the machines and demands more problem solving than the product it makes |deadurl=no}}
104. ^{{cite web|url=http://fortune.com/2016/06/06/teslas-the-machine-behind-the-machine/|title=Tesla's Quest to Build the Machine Behind the Machine |first=Katie |last= Fehrenbacher |publisher=Fortune |date=2016-06-06 |accessdate= 2017-01-05 |archiveurl= https://web.archive.org/web/20161216164747/http://fortune.com/2016/06/06/teslas-the-machine-behind-the-machine/ |archivedate= 2016-12-16 |quote=It takes a hundred to a thousand times more resources, and far more difficulty, to build the machine that builds the machine, compared to creating an individual product, said Musk. |deadurl=no}}
105. ^{{cite web |url=http://www.automobil-produktion.de/2014/03/studie-tesla-gigafactory-bedroht-andere-batteriehersteller/ |title=Studie: Tesla-Gigafactory bedroht andere Batteriehersteller |last=Karius |first=Andreas |date=3 March 2014 |website=www.automobil-produktion.de |language=DE |archive-url=https://archive.is/rHnuD |archive-date=1 April 2016 |dead-url=yes |access-date=27 October 2018}}
106. ^{{cite news|url= http://electrek.co/2016/05/31/tesla-triple-battery-output-gigafactory-1-150-gwh-elon-musk/ |title= Tesla could triple the planned battery output of ‘Gigafactory 1’ to 150 GWh, says Elon Musk |website= electrek.co |first= Fred |last= Lambert |date= 2016-05-31 |accessdate= 2016-06-19}}
107. ^{{cite news |url=http://cleantechnica.com/2016/07/27/10-key-takeaways-tesla-gigafactory-opening/ |title=11 Key Tesla Gigafactory, Model 3, Solar, & Elon Romance Takeaways From Today's Statements |first=Zachary |last=Shahan |work=CleanTechnica |date=2016-07-27 |access-date=2017-01-05}}
108. ^{{cite news |url=http://electrek.co/2016/07/28/tesla-gigafactory-tour-roundup-and-tidbits-this-is-the-coolest-factory-ever/ |title=Tesla Gigafactory tour roundup and tidbits: ‘This is the coolest factory in the world’ |first=Seth|last=Weintraub |work=Electrek |date=2016-07-28 |access-date=2016-07-30 }}
109. ^{{cite web|url=http://koreabizwire.com/samsung-sdi-unveils-e-bike-battery-capable-of-100km-on-single-charge/41124 |date=2015-08-26 |archiveurl= https://web.archive.org/web/20151226053648/http://koreabizwire.com/samsung-sdi-unveils-e-bike-battery-capable-of-100km-on-single-charge/41124 |title=Samsung SDI Unveils E-bike Battery Capable of 100km on Single Charge|archivedate=2015-12-26 |work=Be Korea-savvy|accessdate=2015-08-31 |deadurl=no}}
110. ^{{cite web|url= https://cleantechnica.com/2016/06/08/elon-nope-not-jumping-samsung-sdi-using-panasonic-battery-cells-tesla-model-3-model-s-model-x/ |title=Elon: Nope, Not Jumping To Samsung SDI, Using Panasonic Battery Cells For Tesla Model 3, Model S, Model X|work=CleanTechnica |date= 2016-06-08|accessdate= 2016-09-04}}
111. ^{{cite news|url= https://electrek.co/2016/07/29/tesla-gigafactory-panasonics-machine-battery-cell/ |title= Tesla Gigafactory: a look at Panasonic’s impressive machines for battery cell manufacturing |website= electrek.co |first= Fred |last= Lambert |date= 2016-07-29 |accessdate= 2016-12-07}}
112. ^{{cite web|url= https://www.bloomberg.com/news/articles/2017-01-04/tesla-flips-the-switch-on-the-gigafactory |archiveurl= https://web.archive.org/web/20170104232426/https://www.bloomberg.com/news/articles/2017-01-04/tesla-flips-the-switch-on-the-gigafactory |title=Tesla Flips the Switch on the Gigafactory |first=Tom |last=Randall |date=2017-01-04 |archivedate= 2017-01-04 |work=Bloomberg.com |accessdate= 2017-01-04 |deadurl=no}}
113. ^{{cite web|url= https://www.tesla.com/blog/battery-cell-production-begins-gigafactory |title=Battery Cell Production Begins at the Gigafactory|publisher= Tesla |date=2017-01-04 |accessdate= 2017-01-05 |quote=The Gigafactory is being built in phases so that Tesla, Panasonic, and other partners can begin manufacturing immediately inside the finished sections and continue to expand thereafter. Our phased approach also allows us to learn and continuously improve our construction and operational techniques.. ..bringing cell production to the U.S.}}
114. ^{{cite web|url= https://electrek.co/2017/05/09/tesla-battery-lifetime-double/ |title=Tesla battery researcher says they doubled lifetime of batteries in Tesla’s products 4 years ahead of time|first=Fred |last=Lambert |date= 2017-05-09 |publisher=Electrek |accessdate= 2017-05-09 }}
115. ^{{cite web|title=Tesla officials show off progress at Gigafactory in Northern Nevada|trans-title=|periodical=reviewjournal.com |publisher=|url= http://www.reviewjournal.com/news/nevada/tesla-officials-show-progress-gigafactory-northern-nevada |accessdate=2016-03-20 |last=|date=2016-03-18 |year=|month=|day= |language=|pages=|quote= workers and robotic arms still processed some of the battery storage products that went on sale in October}}
116. ^{{cite web|url= http://www.zdnet.com/panasonic-to-pour-billions-of-yen-in-teslas-gigafactory-as-initial-investment-7000034407/ |title=Panasonic to pour billions of yen in Tesla's gigafactory as initial investment|date= 2014-10-07 |work=ZDNet|accessdate= 2014-10-09}}
117. ^{{cite web|url=http://www.teslamotors.com/sites/default/files/blog_attachments/gigafactory.pdf |date=2014-02-26 |title=Planned 2020 Gigafactory Production Exceeds 2013 Global Production |accessdate=2014-06-05 |archiveurl=https://web.archive.org/web/20160419224101/https://www.teslamotors.com/sites/default/files/blog_attachments/gigafactory.pdf |archivedate=2016-04-19 |deadurl=no}}
118. ^{{cite web|url=https://www.tesla.com/gigafactory?redirect=no |title=Gigafactory | Blog | Tesla Motors|last=|first=|date=|website=|publisher=teslamotors.com |accessdate=2016-12-03}}
119. ^{{cite news |last1=Cuthbertson|first1=Anthony |title=Tesla to Create World's Largest Lithium-ion Battery Factory |url=http://www.ibtimes.co.uk/tesla-create-worlds-largest-lithium-ion-battery-factory-1441095 |accessdate=2014-06-12 |publisher=IBT|date= 2014-04-20}}
120. ^{{cite news|date=2015-05-08 |first= Tom |last= Randall |url= https://www.bloomberg.com/news/articles/2015-05-08/tesla-s-battery-grabbed-800-million-in-its-first-week |title= Tesla's Battery Grabbed $800 Million in Its First Week |work= Bloomberg.com |accessdate=2015-05-15}}
121. ^{{cite news |url=https://electrek.co/2017/05/01/tesla-gigafactories-4-more-year/ |title=Tesla to announce not ‘2 or 3’, but ‘probably 4’ more Gigafactories this year |first=Fred |last=Lambert |work=Electrek |location=US |date=2017-05-01 |access-date=2017-07-02}}

External links

{{Commons category}}{{ external media
| float=right
| topic=Development of Gigafactory
| image1 =Inside the Tesla Gigafactory (gallery), March 18, 2016
| image2 =[https://electrek.files.wordpress.com/2015/08/gigafactory-w-buildings.jpg?quality=82&strip=all Factory size comparison]
| image3 =[https://electrek.files.wordpress.com/2017/07/image-2017-07-06-at-5-36-am1.jpg?quality=82&strip=all Aerial view], July, 2017
| image4 =[https://twitter.com/JudeBurger/status/759207588231872512/photo/1 The 2170 cell]
| video1= [https://www.wired.com/2016/07/tesla-gigafactory-elon-musk/ Timelapse of construction]
| video2= Tesla Gigafactory, March 18, 2016
| video3= {{youtube|U-Szj2qIYX8|Gigafactory launch event presentation with Elon Musk and JB Straubel}}
| video4= {{youtube|lCoxZy5491U|Fly-over, September 2016}}
}}
  • [https://www.tesla.com/gigafactory Gigafactory official website]
  • [https://blogs.wsj.com/corporate-intelligence/2014/05/14/the-logic-of-teslas-gigafactory-the-economics-are-a-no-brainer/ “The Logic of Tesla’s Gigafactory: ‘The Economics Are a No-Brainer’”], The Wall Street Journal
  • [https://www.economist.com/news/business/21604174-better-power-packs-will-open-road-electric-vehicles-assault-batteries “Assault on batteries”], The Economist, 2014-06-14 (print edition date)
  • Tesla timeline: A list of construction projects at gigafactory site so far, February 2015
  • Inside Tour Of The Gigafactory 2016-04-25
{{Tesla Motors}}

4 : Manufacturing plants in the United States|Tesla factories|Buildings and structures in Storey County, Nevada|Battery manufacturers

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/10 11:26:21