词条 | Goongoongup Bridge |
释义 |
Goongoongup Bridge replaced the 1932 built timber Bunbury Bridge which was demolished in 1996.[3] It had replaced the original 1893 structure that was damaged by floods.[1] The double-track concrete bridge is 407 metres long and is supported by eight piers. A dual-use pedestrian/cycle pathway is beneath the main deck. A six-lane road bridge Windan Bridge opened in 2000 and is situated parallel and two metres upstream from Goongoongup Bridge. RepairsIn 2002, movement of soil on the eastern end of the bridge was detected.[4][5] Displacement of 140 mm on the abutments was measured and engineering reports predicted the displacement would be 300 mm by the end of the century and that the abutment piles would yield in 10 to 20 years. Repair work by the Public Transport Authority commenced in August 2011 and was completed in early 2013.[6] References1. ^1 "New Perth Bridge Opens" Railway Digest September 1995 page 16 2. ^{{cite web|url=http://www.mediastatements.wa.gov.au/ArchivedStatements/Pages/CourtCoalitionGovernmentSearch.aspx?ItemId=144991&minister=Court&admin=Court&page=12 |archive-url=https://archive.is/20120804154455/http://www.mediastatements.wa.gov.au/ArchivedStatements/Pages/CourtCoalitionGovernmentSearch.aspx?ItemId=144991&minister=Court&admin=Court&page=12 |dead-url=yes |archive-date=4 August 2012 |date=24 July 1995 |title=Official opening of Goongoonup Bridge |work=Govt. of Western Australia }} 3. ^{{cite web|url=http://www.australiaforeveryone.com.au/Perth/perth_bridges.htm |title=Perth's Bridges |work=Perth For Everyone |accessdate=6 April 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20130129012505/http://www.australiaforeveryone.com.au/Perth/perth_bridges.htm |archivedate=29 January 2013 |df=dmy-all }} 4. ^{{cite web|url=http://seedsottawa.wordpress.com/2010/11/12/ogg-nov-lunch-goongoonup-railway-bridge-australia-by-prof-serge-leroueil/|title=Goongoonup Railway Bridge, Australia|author=Prof. Serge Leroueil|work=Ottawa Geotechnical Group|quote=...In 2002, a displacement of 140 mm of the eastern abutment was measured and an independent report predicted at that time that it would be 300 mm by the end of the century and that the abutment piles would yield in 10 to 20 years. The owner of the bridge, the Public Transport Authority, involved experts in structural and geotechnical engineering as well as an engineering firm to examine the situation. First assessment showed several current or potential problems: the bearing capacity of the abutment piles could be exceeded; the abutment bearings were at their limit; the concrete piles of the approach structure were cracked in their upper part and their capacity had to be examined; the raked piles of the closest pier to the abutment were subjected to soil settlement and could have yielded.}} 5. ^Stewart, D.P. and McInnes, D.B. The impact of lateral soil displacements on the Goongoonup rail bridge, Perth, 8th ANZ Conference on Geomechanics, Canberra, ACT, Australian Geomechanics Society, 1: pp 345-351 (1999) 6. ^{{cite web|url=http://www.pta.wa.gov.au/Projects/GoongoongupBridgeWorks/tabid/480/Default.aspx|title=Goongoongup Bridge Works|work=Public Transport Authority|accessdate=10 April 2012}} External links{{commons category-inline}}{{coord|-31.9477|115.8829|type:landmark_region:AU|display=title}}{{Australia-bridge-struct-stub}} 8 : Armadale railway line|Bridges completed in 1995|Bridges in Perth, Western Australia|Burswood, Western Australia|East Perth, Western Australia|Railway bridges in Western Australia|South Western Railway, Western Australia|Swan River (Western Australia) |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。