词条 | Groton Wind Power Project |
释义 |
| name = Groton Wind | name_official = | image = | image_caption = | image_alt = | coordinates = {{coord|43|45|N|71|48|W|type:landmark_region:US-NH|display=inline,title}} | country = United States | location = Groton, New Hampshire | status = O | construction_began = 2011 | commissioned = December 2012 | decommissioned = | cost = $120 million[1] | owner = Iberdrola Renovables | operator = | ps_units_operational = 24 | ps_units_manu_model = Gamesa: G87 2.0 MW | wind_hub_height = {{convert|78|m}} | wind_rotor_diameter = {{convert|87|m}} | wind_rated_speed = | wind_farm_type = Onshore | ps_site_elevation = | wind_site_usage = | ps_site_area = 4,180 acres | ps_electrical_capacity = 48 MW | ps_electrical_cap_fac = | ps_annual_generation = 144 - 158 GWh | website = | extra = }}Groton Wind Power Project a 48-megawatt wind farm, also known as Groton Wind Farm was constructed in 2012 in Groton, New Hampshire in the northeast United States. Owned by Iberdrola Renovables, it is the third major wind-power installation in the state of New Hampshire. Power is being sold to NSTAR under a power purchase agreement, and will go to the Boston area.[2] Located on Tenney Mountain and Fletcher Mountain in Groton,[3] in Grafton County, it has 24 Gamesa G87, 2.0 MW turbines wind turbines. Delivery of turbine components began on June 25, 2012, and continued through August.[4] References1. ^Lakes Region group fights wind farm 2. ^Wind farm makes presence known 3. ^Groton Wind Executive Summary 4. ^Groton Wind Project Information External links{{stack|{{Portal|New Hampshire|Weather|Renewable energy}}}}
3 : Energy infrastructure completed in 2012|Buildings and structures in Grafton County, New Hampshire|Wind farms in New Hampshire |
随便看 |
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。