Incremental launch is a method of building a complete bridge deck from one end of the bridge only.

History

The first incrementally-launched bridge was the 96 metre span Caroní River Bridge, a box girder bridge over the Caroní River in 1964.

The normal method of building concrete bridges is the segmental method, one span at a time.

Method

The bridges are mostly of the box girder design and work with straight or constant curve shapes, with a constant radius. 15 to 30 metre box girder sections of the bridge deck are fabricated at one end of the bridge in factory conditions. Each section is manufactured in around one week.

The first section of the launch is not made of concrete, but is a stiffened steel plate girder and is around 60% of the length of a bridge span, and reduces the cantilever moment.

The sections of bridge deck slide over sliding bearings, which are concrete blocks covered with stainless steel and reinforced elastomeric pads.

Incrementally-launched bridges

  • Woronora River Bridge, 2001, the largest incrementally-launched bridge when built

References

External links

  • {{YouTube|S3Kf9e6JgF4|Bridge construction - Incremental Launching - 3D Animation}}

3 : Bridges|Civil engineering|Hydraulics

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/20 16:46:36