词条 Karachi Metrobus
释义

  1. Lines

     Green Line  Orange Line  Blue Line  Yellow Line  Red Line 

  2. Fleet

  3. See also

  4. References

{{Infobox Public transit
|name = Karachi Metrobus
{{Nastaliq|کراچی میٹرو بس}}
|image =
|imagesize =
|image2 =
|imagesize2 =
|locale = Karachi, Sindh, Pakistan
|transit_type = BRT
|began_operation =
|ended_operation =
|system_length = {{convert|112.9|km|mi|1|abbr=on}}
|Cost = PKR 15 billion (proposed)[1]
|lines = 5
2 under-construction
3 proposed

|vehicles =
|stations = ~90
|passenger = ~350,000 daily
|track_gauge =
|reporting marks =
|operator = Department of Transport & Mass Transit
|owner = Government of Sindh
|map =
|website =
}}

The Karachi Metrobus ({{lang-sd|ڪراچي ميٽروبس}}, {{lang-ur|{{Nastaliq|کراچی میٹرو بس}}}}) is a {{convert|112.9|km|mi|1|abbr=on}} bus rapid transit network under-construction in Karachi, Sindh, Pakistan.[1][2][3] The expected daily ridership is estimated at 350,000 with a total of 109 km of dedicated bus routes[2] Upon completion, it will become the largest metro bus network in Pakistan. The Karachi Metrobus project was inaugurated on 25 February 2016 and was slated to begin operation by February 2017.

Nawaz Sharif, during a high-level meeting in Karachi on July 10, 2014, announced to provide infrastructure component to launch the BRT Green Line project on modern lines to alleviate the severe traffic congestion in the city.[4]

The slow pace of work on BRT Green Line has irked citizens as the digging work on main arteries has resulted in congestion of traffic.[4] Former prime minister Nawaz Sharif declared Sindh government responsible for the delay in Green Line Bus Rapid Transit System in Karachi.[5]

Lines

The system will be divided into 5 dedicated lines or "busways".

Green Line

{{Main|Green Line - Karachi Metrobus}}

The Green Line will extend from Merewether Tower to Surjani Town at a total length of {{convert|26|km|abbr=on}}. The Government of Pakistan will be financing the majority of the project.[6] Construction of the Green Line began on February 26, 2016. The line will have 22 bus stations when completed.[7] Engineering Associates have been contracted as the designers and supervision consultants for Green Line while a Consortium of "Ernest & Young", "Exponent Engineers" & "Haider Mota & BNR" have been contracted for "Transaction Advisory for Bus Operational Plan".[8][9][10] The government is in process of acquiring 80 units of 18-metre-long buses.[11] In addition, a Command and Control Centre is being established at the Garden West.

On October 2016, the CDWP revised the cost of Karachi metro bus project upwards by 52% to Rs 24.6 billion in addition to approving changes in its design. On December 2014, the Ecnec had approved the mass transit project at a cost of Rs16.1 billion after it cut the length of the route by 3.2 km. However, the provincial government expressed concerns and Prime Minister Nawaz Sharif announced to extend the scope and length of the project.

{{Navbox
| listclass = hlist
| evenodd = swap
| group1style = background:Green; color:white;
| group1 = Green Line 
| list1 =
  • Merewether Tower Terminal
  • Numiash Chowrangi Station (to Blue Line)
  • Mazar-e-Quaid Station
  • Guru Mandir Chowrangi Station
  • Lasbela Chowk Station
  • Gulbahar Station
  • Nazimabad Chowrangi Station
  • Eid Gah Ground Station
  • North Nazimabad Station (to North Nazimabad KCR Station)
  • AO Tower Station (to Orange Line)
  • KDA Chowrangi Station
  • Sharah-e-Jehanghir Station
  • Sakhi Hassan Circle Station
  • Nagan Chowrangi Station
  • U.P. More Station
  • Power House Roundabout Station
  • 4K Chowrangi Station
  • Surjani Town Terminal.

}}

Orange Line

{{Main|Orange Line - Karachi Metrobus}}

The Orange Line construction started on June 11, 2016 and is the smallest of the five line's spreading over 3.9 km with only four stations.[11] Orange line will be spread over 2.3 km, of which 0.7 km will be elevated while 1.5 km will be on ground, whereas, the 1.5 km will be semi dedicated section. This project would be constructed in two phases and is likely to completed by 2017. The line will have the capacity to carry up to 50,000 passengers daily with a station after every kilometer. The line begins from Shaharh-e-Quaideen near TMO Office Orangi to Board Office, where it will join the Green Line BRT, through a rotary flyover. The project, worth Rs. 2 billion, is entirely funded by the Sindh government.

In March 2017, the foundation stone of the second phase as well as of the depot was laid which would complete by July 2017. The depot would have the capacity for the parking of 35 buses.

{{Navbox
| listclass = hlist
| evenodd = swap
| group1style = background:orange; color:white;
| group1 = Orange Line 
| list1 =
  • AO Chowk Terminal (to Green Line)
  • Orangi Station (to Orangi KCR Station)
  • Orangi Town Terminal

}}

Blue Line

{{Main|Blue Line - Karachi Metrobus}}

The Blue Line will extend from Merewether Tower to Bahria Town at a total length of {{convert|30|km|abbr=on}}. It will be the first privately funded transport system in Pakistan being funded by the Bahria Town Group.[12] At the moment the Blue Line is undergoing preliminary design with construction likely to begin in the first quarter of 2017.[13][14][15]

{{Navbox
| listclass = hlist
| evenodd = swap
| group1style = background:Blue; color:white;
| group1 = Blue Line 
| list1 =
  • Merewether Tower Terminal
  • Numiash Chowrangi Station (to Green Line)
  • Liaquatabad Station (to Liaquatabad KCR Station)
  • Bahria Town Terminal

}}

Yellow Line

{{Main|Yellow Line - Karachi Metrobus}}

The 26.5-kilometre-long Yellow Line project — from Landhi to New M.A. Jinnah road — is to be built with an estimated cost of Rs.14.4 billion with 104 new buses on the route. In October 2017, the World Bank agreed to provide financial and technical support for the construction of the Yellow Line BRT in Karachi and the establishment of an integrated BRT system.

{{Navbox
| listclass = hlist
| evenodd = swap
| group1style = background:Yellow; color:white;
| group1 = Yellow Line 
| list1 =
  • Numiash Chowrangi Terminal (to Blue Line/Green Line)
  • Landi Station Terminal (to Landhi KCR Station)

}}

Red Line

{{Main|Red Line - Karachi Metrobus}}

The Red Line has been approved and will extend from Model Colony to Regal Chowk Via Safoora Goth and University Road at a total length of {{convert|27|km|abbr=on}}. The project is estimated at $184.23 million where ADB, DFID (UK) and Sindh would share at a rate of 52 percent, 12.62 percent and 34.42 percent respectively.[16]

{{Navbox
| listclass = hlist
| evenodd = swap
| group1style = background:Red; color:white;
| group1 = Red Line 
| list1 =
  • Regal Chowk Terminal (to Blue Line/Yellow Line)
  • Regal Chowk Station Terminal (to KCR)

}}

Fleet

The government is in the process of acquiring 18-meter-long 80 articulated buses for the Green Line, 18-meter-long 25 articulated buses for the Green Line Extension and 12-meter-long 18 buses for the Orange Line.[17]

See also

  • Lahore Metrobus
  • Rawalpindi-Islamabad Metrobus
  • Multan Metrobus
  • TransMilenio

References

1. ^{{cite news|title=PM announces Rs15bn for Karachi 'Green Line' bus project |url=http://www.dawn.com/news/1118317/pm-announces-rs15bn-for-karachi-green-line-bus-project |date=July 10, 2014 |work=Dawn |accessdate=July 10, 2014 |archiveurl=https://www.webcitation.org/6QxodtzJR?url=http://www.dawn.com/news/1118317/pm-announces-rs15bn-for-karachi-green-line-bus-project |archivedate=July 10, 2014 |deadurl=yes |df= }}
2. ^{{cite news|title=وزیراعظم کا کراچی میں 15 ارب روپے کے ریپڈ بس منصوبے کا اعلان |url=http://www.express.pk/story/270019/ |date=July 10, 2014 |work=Express |accessdate=July 10, 2014 |archiveurl=https://www.webcitation.org/6QxptNfW4?url=http://www.express.pk/story/270019/ |archivedate=July 10, 2014 |deadurl=yes |df= }}
3. ^{{cite news|title=Prime Minister Announces to Launch Metro Bus in Karachi |url=http://www.pakistantribune.com.pk/16911/prime-minister-announces-launch-metro-bus-karachi.html |date=July 10, 2014 |work=Pakistan Tribune |accessdate=July 10, 2014 |archiveurl=https://www.webcitation.org/6QxodIpCr?url=http://www.pakistantribune.com.pk/16911/prime-minister-announces-launch-metro-bus-karachi.html |archivedate=July 10, 2014 |deadurl=yes |df= }}
4. ^{{Cite web|url=https://www.pakistantoday.com.pk/2017/11/29/slow-pace-of-work-on-green-line-irks-citizens/|title=Slow pace of work on Green Line irks citizens|website=www.pakistantoday.com.pk|language=en-GB|access-date=2018-02-05}}
5. ^{{Cite news|url=http://92newshd.tv/nawaz-declares-sindh-govt-responsible-delay-green-line-project/#.WnefZ5M-cUs|title=Nawaz declares Sindh govt responsible for delay in Green Line project - 92 News HD Plus|last=news92hd|date=2018-02-02|work=92 News HD Plus|access-date=2018-02-05|language=en-US}}
6. ^{{Cite web|url=http://tribune.com.pk/story/1055243/ground-breaking-ceremony-green-line-brt-finally-gets-go-ahead/|title=Ground-breaking ceremony: Green Line BRT finally gets go-ahead - The Express Tribune|date=2016-02-26|website=The Express Tribune|language=en-US|access-date=2016-06-11}}
7. ^{{Cite web|url=http://www.dawn.com/news/1241849|title=Karachi’s Green Line bus will be more beautiful than Lahore metro: PM Nawaz|last=Dawn.com|date=2016-02-26|website=www.dawn.com|access-date=2016-06-11}}
8. ^{{Cite news|url=https://tribune.com.pk/story/1064250/extension-plans-green-line-goes-the-extra-mile//|title=Green Line goes the extra mile - The Express Tribune|date=2016-03-11|work=The Express Tribune|access-date=2018-06-09|language=en-US}}
9. ^{{Cite news|url=http://www.dawn.com/news/1241849|title=Karachi’s Green Line bus will be more beautiful than Lahore metro: PM Nawaz|last=Dawn.com|date=2016-02-26|work=DAWN.COM|access-date=2018-06-09|language=en-US}}
10. ^{{Cite news|url=http://www.dawnnews.tv/news/1034126/|title=گرین لائن ٹرانسپورٹ منصوبہ|last=اداریہ|date=2016-02-29|work=Dawn News Television|access-date=2018-06-09|language=en-US}}
11. ^{{Cite web|url=http://pprasindh.gov.pk/tenders/34059TRANSPORT&MASS280717.zip|title=Tender for Green Line and Orange Line |date=2017-07-28|website=Sindh Public Procurement Regulatory Authority|language=en-US|access-date=2017-08-17}}
12. ^http://bahriatowntoday.com/bahria-town-karachi-to-start-bus-rapid-transit-system-brts/
13. ^{{Cite web|url=http://tribune.com.pk/story/833779/karachi-metro-bus-bahria-town-offers-rs42b-loan-to-sindh-govt/|title=Karachi metro bus: Bahria Town offers Rs42b loan to Sindh govt - The Express Tribune|date=2015-02-06|website=The Express Tribune|language=en-US|access-date=2016-06-11}}
14. ^{{Cite web|url=http://tribune.com.pk/story/854755/of-bogota-and-karachi-brts-experts-begin-designing-blue-line/|title=Of Bogota and Karachi: BRTS experts begin designing Blue line - The Express Tribune|date=2015-03-17|website=The Express Tribune|language=en-US|access-date=2016-06-11}}
15. ^{{Cite web|url=http://tribune.com.pk/story/1125924/mass-transit-red-tape-delays-blue-line-brt/|title=Red tape delays Karachi's Blue Line BRT - The Express Tribune|date=2016-06-19|website=The Express Tribune|language=en-US|access-date=2016-06-20}}
16. ^https://arynews.tv/en/asian-development-bank-agrees-to-finance-red-line-brt-project-in-karachi/
17. ^{{cite web|title=Bus Operation of Green and Orange Line Bus Rapid Transit System in Karachi, Sindh, Pakistan|url=http://pprasindh.gov.pk/tenders/34059TRANSPORT&MASS280717.zip|publisher=Sindh Public Procurement Regulatory Authority|accessdate=17 August 2017}}
{{Public transport in Karachi}}{{Bus rapid transit in Pakistan}}{{Karachi topics}}

3 : Transport in Karachi|Bus rapid transit|Bus rapid transit in Pakistan

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 19:33:11