词条 | Kikagati Hydroelectric Power Station |
释义 |
| name = Kikagati Power Station | name_official = | image = | image_size = | image_caption = | image_alt = | location_map = Uganda | location_map_size = | location_map_caption = Map of Uganda showing the location of Kikagati | location_map_alt = | location_map_relief = | coordinates = {{coord|01|02|33|S|30|40|10|E|region:UG_type:landmark|display=inline,title}} | country = Uganda | location = Kikagati, Isingiro District | purpose = | status = UC | construction_began =2018[1] | opening =2021 (Expected) | demolished = | cost = | owner = | operator = | dam_type = | dam_crosses = Kagera River | dam_height = | dam_height_foundation= | dam_height_thalweg = | dam_length = | dam_elevation_crest = | dam_width_crest = | dam_width_base = | dam_volume = | spillway_count = | spillway_type = | spillway_capacity = | res_name = | res_capacity_total = | res_capacity_active = | res_capacity_inactive= | res_catchment = | res_surface = | res_max_length = | res_max_width = | res_max_depth = | res_elevation = {{convert|1300|m|abbr=on}} | res_tidal_range = | plant_name = | plant_coordinates = | plant_operator = | plant_commission = 2020 (expected) | plant_decommission = | plant_type = | plant_hydraulic_head = | plant_turbines = 2 | plant_capacity = {{convert|16|MW|abbr=on}} | plant_annual_gen = | website = | extra = }}Kikagati Hydroelectric Power Station, also referred to as Kikagati Power Station, is a {{convert|16|MW|abbr=on}} hydroelectric power station, under construction in Uganda.[2] LocationThe power station is located on the Kagera River, along Uganda's International border with the Republic of Tanzania. This location lies near the town of Kikagati, approximately {{convert|60|km}}, by road, south of Mbarara, the largest city in the sub-region.[3] Kikagati lies approximately {{convert|330|km}}, by road, southwest of Kampala, the capital of Uganda and the largest city in that country.[4] OverviewKikagati Power Station is a mini-hydropower plant, with initial planned capacity installation of {{convert|10|MW|abbr=on}}, when completed. The project will involve the construction of a dam, creating a {{convert|4000|m2|acre}} reservoir lake. The new reservoir will lie partly or wholly, within Tanzania. The new power station will be built at the location of another smaller power station that was destroyed in 1979 during the war that removed Idi Amin from power in Uganda.[5] In September 2011, the planned capacity installation was increased to 16 MW.[6] This power project received partial funding from the Uganda GetFit Program.[7] Development rightsInitially, the Chinese company China Shan Sheng, was issued the construction license for the project in 2008.[8] At that time, construction costs were estimated at US$25 million. The 33kV transmission line that will connect the power from the station to the Uganda national electricity grid has already been constructed. Some of the power will be sold to Tanzania, under arrangements made through the East African Community.[9] Between 2008 and 2013, the Chinese pulled out of the deal. Development rights were taken up by TrønderEnergi, a Norwegian power company, with a Ugandan subsidiary [https://web.archive.org/web/20140208091117/http://www.tronderpower.com/ Tronder Energy Limited]. In July 2013, TronderEnergi advertised for suitable firms to bid on the construction of Kikagati Power Station. Bids were also sought on the nearby Nshungyezi Hydropower Station, a proposed {{convert|39|MW|abbr=on}} minihydroplant, approximately {{convert|13|km}}, downstream of Kikagati, on which TronderEnergi has development rights as well.[10] Construction timetableKikagati Power Station was awarded a production license by the Electricity Regulatory Authority (ERA), in October 2014. SBI International AG was awarded the construction contract.[1] The new construction cost has been reported at US$50 million.[1] Construction started in February 2018, with commissioning planned for the first half of 2021.[1] See also{{stack|{{Portal|Uganda|Water|Renewable energy}}}}
References1. ^1 2 3 {{cite web|format=PDF |url=http://www.sbi.co.ug/images/government-call-4-timely-completion-kikagati-dam.pdf |title=Government Calls for Timely Completion of Kikagati Dam |access-date=24 May 2018 |date=19 February 2018 |newspaper=New Vision Quoted by SBI International Holdings AG |first=John |last=Odyek | location=Kampala}} 2. ^{{cite web|url=https://www.getfit-reports.com/2017/projects/kikigati/|title=GetFit Uganda: 2017 Annual Report, Kikagati Power Station |publisher=GetFit Uganda | author=GetFit Uganda |access-date=8 March 2018 |date=31 December 2017}} 3. ^{{cite web| url=http://distancecalculator.globefeed.com/Uganda_Distance_Result.asp?fromplace=Mbarara%20(Mbarara)&toplace=Kikagati%20(Mbarara)&fromlat=-0.6583333&tolat=-1.1036111&fromlng=30.6758333&tolng=30.6880556|title=Road Distance Between Mbarara And Kikagati With Map |accessdate=11 July 2014|publisher=Globefeed.com}} 4. ^{{cite web|publisher=Globefeed.com|accessdate=11 July 2014|title=Map Showing Kampala And Kikagati With Distance Marker| url=http://distancecalculator.globefeed.com/Uganda_Distance_Result.asp?fromplace=Kampala%20()&toplace=Kikagati%20(Mbarara)&fromlat=0.3155556&tolat=-1.1036111&fromlng=32.5655556&tolng=30.6880556}} 5. ^{{cite web| url=https://www.newvision.co.ug/new_vision/news/1181831/tanzania-uganda-build-power-dam |title=Tanzania, Uganda To Build Power Dam |newspaper=New Vision |date=3 September 2008 |access-date=10 August 2018 |first=Fred |last=Turyakira |location=Kampala}} 6. ^{{cite web | last=Infrastructure |url=http://arusha.wantedinafrica.com/news/news.php?id_n=8386 |accessdate=11 July 2014|date=21 September 2011|title= Tanzania And Uganda To Build Dam On Kagera River| publisher=Arusha.WantedInAfrica.com}} 7. ^{{cite web|url=https://www.getfit-reports.com/2017/projects/kikigati/ |title=Uganda GET Fit Program: 2017 Annual Report |publisher=Uganda GET Fit Program | author=Uganda GET Fit |location=Kampala |date=31 December 2017 |access-date=10 August 2018}} 8. ^{{cite web|url=http://www.newvision.co.ug/D/8/220/628212 |title=More Power Licenses Given Out |publisher=New Vision |date=15 May 2008 |accessdate=11 July 2014 |first=Ibrahim |last=Kasita |deadurl=yes |archiveurl=https://web.archive.org/web/20140714163726/http://www.newvision.co.ug/D/8/220/628212 |archivedate=14 July 2014 |df= }} 9. ^{{cite web| url=http://www.eac.int/energy/index.php?option=com_content&view=article&id=114&Itemid=126|title=Cross-Border Electrification Programme|last=EAC|publisher=East African Community (EAC)|accessdate=11 July 2014}} 10. ^{{cite web |url=http://www.devbusiness.com/ProjectViewer.aspx?ProjectID=37451&ProjectType=1 |title=Contractors To Develop The Kikagati Hydro Power Project In Uganda|date=4 July 2013 |accessdate=11 July 2014|last=Development Business| publisher=DevBusiness.com (Development Business)}} External links
4 : Hydroelectric power stations in Uganda|Isingiro District|Western Region, Uganda|Proposed hydroelectric power stations |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。