请输入您要查询的百科知识:

 

词条 Kota Chambal Bridge
释义

  1. Funding

  2. Structure

  3. Accident

  4. References

{{EngvarB|date=May 2014}}{{Use dmy dates|date=May 2014}}{{Infobox bridge
|bridge_name=Kota hanging Bridge
|image= File:Upcoming cable bridge in kota3.jpg
|caption= The Kota-Chambal bridge under construction
|official_name= Kota Bypass Bridge
|also_known_as= Chambal Cable bridge
|carries= North–South and East–West Corridor
|crosses= Chambal River
|locale= Kota, Rajasthan
|maint= National Highways Authority of India
|design= Cable-stayed bridge
|mainspan= {{convert|350.5|m|ft|abbr=on}}
|length= 1.5 km
|height={{convert|125|m}} (pylons)
|width= 30 meters
|clearance= 46 meters
|below= 46 metres
|traffic=
|begin= 2008
|complete=2017
|open=
|Open=
|toll= none
|map_cue=
|map_image=
|map_text=
|map_width=
|coordinates= {{coord|25|08|32|N|75|47|37|E|region:JP_type:landmark|display=inline,title}}
|map_type = India
}}

The Kota Bridge or Kota Chambal or Kota Cable Bridge is a cable bridge in Kota, Rajasthan. The bridge was inaugurated by Prime Minister of India Narendra Modi on 29 August 2017. The bridge is a part of the Kota Bypass and crosses the Chambal River in the outskirts of the city.

Funding

The project is being sponsored by the National Highways Authority of India (NHAI) in a 2750 million INR investment on the bridge and a 40 months-deadline. The agreement was signed in 2006. Due to delay in Environmental and Wild life clearances it could start in 2007 only. The bridge was scheduled to be opened in November 2012. Later this was pushed to May 2017. It is being constructed by Hyundai Engineering of South Korea.

Structure

This bridge is cable-stayed with single plain suspension with the main span of 350 metres[1] and lateral spans of 175 metres on either side of the bridge. The bridge is around 60-metre-high from the surface of the Chambal River.Kota’s Iconic Engineering Marvel open for commuters on 29 August 2017.[2][3][4]

Accident

On 24 December 2009, at about 5.30 pm the under-construction west side of the bridge comprising span P4-P3, Pilon P4, Pier P4 and cantilever portion up to segment 10 (each segment being 3.5 meters) collapsed into the river below without any warning signs, killing 48 workers and engineers and injuring a few more.[5]

References

1. ^{{Cite web|url=https://www.nbmcw.com/bridges/477-chambal-cable-stayed-bridge-connecting-shores.html|title=Chambal Cable Stayed Bridge Connecting Shores|last=User|first=Super|website=www.nbmcw.com|language=en-gb|access-date=2017-09-16}}
2. ^{{Cite news|url=http://www.financialexpress.com/india-news/kota-hanging-bridge-a-boon-for-people-in-hadouti-region/831662/|title=Kota ‘hanging bridge’ a boon for people in Hadouti region|date=2017-08-29|work=The Financial Express|access-date=2017-09-16|language=en-US}}
3. ^Hanging Bridge to open for commuters on 29 August 2017
4. ^{{Cite news|url=http://indiatoday.intoday.in/story/rajasthan-hanging-bridge-6-lane-kota-chambal-pm-modi/1/1036374.html|title=Connecting Rajasthan: PM Modi inaugurates hanging bridge across Chambal in Kota|access-date=2017-09-16}}
5. ^{{cite web|title=OneIndia Bridge collapse|url=http://news.oneindia.in/2009/12/26/45-presumed-dead-in-kota-bridge-collapse-official.html}}
{{India-bridge-struct-stub}}

4 : Cable-stayed bridges in India|Kota, Rajasthan|Buildings and structures in Kota|Bridges in Rajasthan

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 19:42:10