请输入您要查询的百科知识:

 

词条 KTM Class 92
释义

  1. Operation

     Special service  Maintenance and Depot 

  2. Design and Construction

  3. Formation

  4. Corruption Investigation

  5. Operational Issues

  6. Vandalism

  7. Accidents and Incidents

  8. Launch Delays

  9. Gallery

  10. References

  11. External links

{{Infobox EMU
| name = Class 92
| image = KTMB Class 92 SCS 18 KL Sentral Junction.jpg
| imagesize = 300px
| background = yellow
| caption = A Class 92 EMU Komuter train.
| manufacturer = CSR Zhuzhou
| factory = Zhuzhou, China
| operator = Keretapi Tanah Melayu
| formation = 6 cars per trainset
| yearconstruction = 2010 - 2012
| numberbuilt = 228 cars (38 sets)[1]
| numberservice = 222 cars (37 sets)
| lines = Rawang-Seremban Route
Batu Caves-Port Klang Route
Butterworth-Padang Besar Route
| service = March 2012 - Current [2]
| poweroutput = {{val|3200|u=kW}} of power per unit
| transmission = electric
| carbody = Aluminium
| height = {{val|3905|u=mm}}
| width = {{val|2750|u=mm}}
| floorheight = {{val|1100|u=mm}}
| weight = 238 t
| capacity = {{val|1118}} (328 seats)
| depots = Batu Gajah Rail Depot
Sentul Komuter Depot
Tanjung Malim Staging Area
New Seremban Komuter Depot (Sept 2013)
| trainlength = 138.6 m
| carlength = 23.7 m (End cars)
22.8 m (Intermediate cars)
| doors = 3 double-leaf doors per side
| wheeldiameter = 850 mm
| art-sections = none
| brakes = two-pipe regenerative break system
| maxspeed = 140 km/h (Design)
120 km/h (Service)
| traction = IGBT-VVVF
(Siemens)[2]
| gauge = 1 000 mm Metre gauge
| electricsystem = 25 kV, 50 Hz overhead line
| collectionmethod = Double-arm Z-shaped Pantograph
| coupling = AAR couplers
| safety = ETCS, ATP
}}

The Class 92 is a type of electric multiple unit operated by Keretapi Tanah Melayu on its KTM Komuter services. A total of 38 sets were built by CSR Zhuzhou of China, in 6-car formations.[3] The first EMU has been delivered on the 23rd of September and was expected to operate in revenue service by late December 2011. However, delays in testing led to the subsequent postponement of launch. On 8 March 2012, 4 sets of KTM Class 92 commenced operation and all 38 sets of these KTM Class 92 were in revenue service by July 2012.[4][5] The KTM Class 92 is the first train in Malaysia to feature a dynamic route map (passenger information system) built into the train. The EMU's complete interior and exterior design is designed by a German design office, Tricon Design.[6] The KTM Class 92 trains are fitted with 65 million euros worth of Siemens made transformers, power converters, traction motors and vehicle control systems.[7][8][9]

The Class 92 was procured under a Malaysian Government initiative, National Key Result Area (NKRA) to reduce congestion and improve public transport with a specific RM2 billion allocation to KTMB to improve commuter rail efficiency. A sum of RM 1.894 billion was spent to procure these trains, with the remainder being spent on the improvement of signalling along the Putra-Mid Valley stretch and a ticketing system upgrade.[10]

Operation

The Class 92 is set to complement and replace the earlier 3 coach class 8x commuter trains. It will operate along the two Komuter lines and is expected to service all 53 stations. However, the Rawang-Tanjung Malim route is usually not serviced by this coach. At certain stretches, it will operate at its service operational speed of 120 km/h. During current 15-minute frequency operations, as many as 25 class 92 sets are used while the remaining sets are kept in reserve. In the future (10-minute frequency operations), it is expected for the total maximum of concurrently used sets to increase to 36 with 2 to remain in reserve.

Special service

During festivities, the KTM Class 92 is used for special services. Special services typically occur during occasions such as the "homecoming" exodus, saw class 92 sets operating intercity routes, such as the KL Sentral-Ipoh route complementing the ETS train service. In other festivities, such as the festival of Thaipusam, the class 92 also provides service from Ipoh direct to Batu Caves.

Maintenance and Depot

The Class 92 sets will be maintained by its manufacturer CSR Zhuzhou. The maintenance facility will be based mainly at KTM’s Sentul Komuter Depot while a minor secondary base will be located at Tanjung Malim.[11] The Batu Gajah Rail depot will continue its role as the testing place for new Class 92 sets.

On top of all that, a new special {{convert|16.34|ha|acre|lk=in|sigfig=2}} commuter maintenance depot is being built (completion by Sept 2013) in the vicinity of Seremban station to house the class 92. The depot will have a capacity of stabling 19 six coach Class 92 sets and be able to conduct simultaneous maintenance work on up to 6 sets of commuter trains. The depot will also have up to 15 tracks of 6km each to store and maintain trains. The depot will also stage other Rawang-Seremban line rolling stocks.[12]

Design and Construction

The Class 92 is designed for low dwell times and high passenger seating capacity, being built with three double leaf doors per side and having full longitudinal seating at its cab-coaches. Its middle coaches feature a mixture of longitudinal and traverse 2+2 seating. It has wide gang-ways interconnecting each coach, allowing passengers to distribute effectively throughout the length of the train. However, two middle coaches of the class 92 is designated women's only coaches by its operator KTM. Thus, limiting full interactivity within the train set. Dynamic route maps located above doors details trains position relative to station in real-time. CCTVs and 3-pin power outlets are provided as further features. Since the train is to operate in the tropics, the trains have an over-head air-conditioning systems, to provide ventilation, dehumidification and comfortable temperature control.[8]

The exterior and interior of the class 92 is fully designed in Germany by Tricon Design for CSR Zhuzhou. Featuring a Malaysian tiger inspired front motif and tiger fur side coating. It was then assembled in CSR Zhuzhou's Electric Plant train factory in China.[6] While power traction units and vehicle control systems were built by Siemens in Germany.[8][13]

Formation

Car No. 1 2 3 4 5 6
Seating capacity 50 57 57 57 57 50
Designation Mc Tp M M Tp Mc
Set Designation 1 2 3 4 5 6 Arrival Date Status Launch Date
Class 92 SCS 01 C9201 T9201 M9201 M9202 T9202 C9202 Arrived Sept 22 Operational 8 March
Class 92 SCS 02 C9203 T9203 M9203 M9204 T9204 C9204 Arrived Oct 19 Operational 8 March
Class 92 SCS 03 C9205 T9205 M9205 M9206 T9206 C9206 Arrived Nov Operational 8 March
Class 92 SCS 04 C9207 T9207 M9207 M9208 T9208 C9208 Arrived Nov Operational 8 March
Class 92 SCS 05 C9209 T9209 M9209 M9210 T9210 C9210 Arrived Nov Operational 31 March
Class 92 SCS 06 C9211 T9211 M9211 M9212 T9212 C9212 Arrived Nov Crashed 31 March
Class 92 SCS 07 C9213 T9213 M9213 M9214 T9214 C9214 Arrived Dec Operational 31 March
Class 92 SCS 08 C9215 T9215 M9215 M9216 T9216 C9216 Arrived Dec Operational 31 March
Class 92 SCS 09 C9217 T9217 M9217 M9218 T9218 C9218 Arrived Dec Operational 31 March
Class 92 SCS 10 C9219 T9219 M9219 M9220 T9220 C9220 Arrived Jan Operational 31 March
Class 92 SCS 11 C9221 T9221 M9221 M9222 T9222 C9222 Arrived Jan Operational May
Class 92 SCS 12 C9223 T9223 M9223 M9224 T9224 C9224 Arrived Jan Operational May
Class 92 SCS 13 C9225 T9225 M9225 M9226 T9226 C9226 Arrived Feb Operational May
Class 92 SCS 14 C9227 T9227 M9227 M9228 T9228 C9228 Arrived Feb Operational May
Class 92 SCS 15 C9229 T9229 M9229 M9230 T9230 C9230 Arrived Feb Operational May
Class 92 SCS 16 C9231 T9231 M9231 M9232 T9232 C9232 Arrived Feb Operational May
Class 92 SCS 17 C9233 T9233 M9233 M9234 T9234 C9234 Arrived Operational May
Class 92 SCS 18 C9235 T9235 M9235 M9236 T9236 C9236 Arrived Operational May
Class 92 SCS 19 C9237 T9237 M9237 M9238 T9238 C9238 Arrived Operational June
Class 92 SCS 20 C9239 T9239 M9239 M9240 T9240 C9240 Arrived Written off June
Class 92 SCS 21 C9241 T9241 M9241 M9242 T9242 C9242 Arrived Operational June
Class 92 SCS 22 C9243 T9243 M9243 M9244 T9244 C9244 Arrived Operational June
Class 92 SCS 23 C9245 T9245 M9245 M9246 T9246 C9246 Arrived Operational July
Class 92 SCS 24 C9247 T9247 M9247 M9248 T9248 C9248 Arrived Operational July
Class 92 SCS 25 C9249 T9249 M9249 M9250 T9250 C9250 Arrived Operational July
Class 92 SCS 26 C9251 T9251 M9251 M9252 T9252 C9252 Arrived Operational July
Class 92 SCS 27 C9253 T9253 M9253 M9254 T9254 C9254 Arrived Operational July
Class 92 SCS 28 C9255 T9255 M9255 M9256 T9256 C9256 Arrived Operational July
Class 92 SCS 29 C9257 T9257 M9257 M9258 T9258 C9258 Arrived Operational July
Class 92 SCS 30 C9259 T9259 M9259 M9260 T9260 C9260 Arrived Operational July
Class 92 SCS 31 C9261 T9261 M9261 M9262 T9262 C9262 Arrived Operational July
Class 92 SCS 32 C9263 T9263 M9263 M9264 T9264 C9264 Arrived Operational July
Class 92 SCS 33 C9265 T9265 M9265 M9266 T9266 C9266 Arrived Operational July
Class 92 SCS 34 C9267 T9267 M9267 M9268 T9268 C9268 Arrived Operational July
Class 92 SCS 35 C9269 T9269 M9269 M9270 T9270 C9270 Arrived Operational July
Class 92 SCS 36 C9271 T9271 M9271 M9272 T9272 C9272 Arrived Operational July
Class 92 SCS 37 C9273 T9273 M9273 M9274 T9274 C9274 Arrived Operational July
Class 92 SCS 38 C9275 T9275 M9275 M9276 T9276 C9276 Arrived Operational July

Cars 2 and 5 are equipped with a double-arm Z-shaped pantograph.

Cars 3 and 4 are designated women's only car.

Corruption Investigation

The purchase of the KTM class 92 was notably under investigation by the Malaysian Anti Corruption Commission (MACC) over its tender process. In 2008, the Chinese railway manufacturer Zhuzhou Electric Locomotive Co Ltd, being the lowest bidder, was originally awarded the tender to build 3 car sets at the cost of RM 13.7 million. This figure later increased to RM 48 million per 6 car set. According to the details revealed to the press about the investigation, the re-negotiation process was held directly with the manufacturer and there was certain irregularities in pricing. The investigation is still on-going.[14][15][16]

This is not the only set of irregularities in railway procurement occurring in Malaysia. In 2009, the Malaysian Ministry of Transport was under investigation over the purchase of used diesel multiple units. Following the investigation and general consensus at parliament at the time. The purchase of used these diesel multiple units was eventually canceled.[17][18]

Operational Issues

There has been a number of issues related to the Class 92. In a comment by KTMB's incumbent president, Elias Kadir has noted that the class 92 is "not up to standard".[19] In other related incidents, in which Class 92 sets malfunctioned was due reportedly to poor maintenance and non-payment to suppliers.[19]

Poor fleet management has led to many KTM Class 92 sets to have gone without routine maintenance, thus leading to a void in manufacturer warranty. According to the Auditor-General’s Report, The sum of RM99.94 million paid by the Railway Assets Corporation (RAC) to CSR Zhuzhou Electric Locomotive Co Limited to service the six-car Electric Multiple Unit (EMU) cannot be reimbursed due to KTMB's failure in its part of sending the trains for necessary maintenance.

[20]

Vandalism

Immediately, following its launch a number of KTM Class 92 were intentionally damaged, at least 20 side windows are cracked or holed, due a number of stone throwing incidents. [21] This has culminated in a number of media reports. Despite the incidents, KTMB has no intention of upgrading the SCS to shatterproof glass to counter these incident.[22] During the 2018 Malaysian general election, trains plastered with campaign advertising from then ruling party Barisan National had their windows cracked again.[23]

Accidents and Incidents

  • On 15 February 2013 at 23:00, an out-of-service KTM Class 92 SCS 20 derailed near Shah Alam station while returning to Sentul depot for maintenance. No one was injured. The train was heavily damaged and was subsequently written off.[24]
  • On 15 April 2018, at around 13:00, SCS23 had a minor derail near Kuala Lumpur station, heading to Port Klang. No one was injured.
  • On 23 August 2018, at approximately 6.09 am, Set SCS06 rammed into the stoppers at Port Klang Station as the driver was believed to have not secured the brakes. The train was about to start its return journey to KL Sentral station. There were no injuries reported but it caused delays on the Port Klang Line.[25]
  • On 18 October 2018, at around 06:02, a Class 26 locomotive hauling 30 wagons had crashed onto Set SCS06 (the same transet involved at Port Klang on August 23) when it was stationary at Tanjung Malim Station. 5 passengers were reported injured with the transet heavily damaged.[26]

Launch Delays

The premature decay in KTM class 8X circa 2006-2012, led to a public outcry for new commuter rolling stock. Hence, there was a need for a fast-tracked tender of new trains in order to meet the rising rail passenger demand.

Originally the first set was expected to be launched in December 2011,[4] it was later delayed to January[27] and then February 2012.[28] The eventual launch date for Class 92 took place on March 8, 2012.[29]

[30]

Reports place the delay as a result of further operational testing, and driver training.

Gallery

References

1. ^{{cite web|last=twitkommuter|title=@ktmkomuter|url=https://twitter.com/ktmkomuter/status/222636611345723394|work=KTM Kommuter|publisher=KTMB|accessdate=10 July 2012}}
2. ^{{cite news|title=Chinese trains to expand KL Komuter fleet|url=http://www.railwaygazette.com/news/passenger/single-view/view/chinese-trains-to-expand-kl-komuter-fleet.html|accessdate=20 May 2016|work=Railway Gazette International|date=26 November 2010}}
3. ^{{cite news|last=Lee|first=Patrick|title=Why all roads lead to Klang Valley|url=http://www.freemalaysiatoday.com/2011/08/31/why-all-roads-lead-to-klang-valley/|accessdate=24 September 2011|newspaper=Free Malaysia Today|date=August 31, 2011|deadurl=yes|archiveurl=https://web.archive.org/web/20110909043943/http://www.freemalaysiatoday.com/2011/08/31/why-all-roads-lead-to-klang-valley/|archivedate=9 September 2011|df=}}
4. ^{{cite news|title=KTM gets first batch of electric train coaches from China|url=http://thestar.com.my/news/story.asp?file=/2011/9/23/nation/9559899&sec=nation|accessdate=24 September 2011|newspaper=The Star|date=September 23, 2011}}
5. ^{{cite news|last=Kaur|first=Manjit|title=Two sets of EMU trains being tested|url=http://thestar.com.my/news/story.asp?file=/2011/11/3/nation/9829390&sec=nation|accessdate=3 November 2011|newspaper=TheStarOnline|date=November 3, 2011}}
6. ^{{cite web|script-title=zh:湖南新闻联播|url=http://bugu.cntv.cn/news/china/hnxwlb/classpage/video/20110707/101053.shtml|work=CNTV|publisher=Middle Kingdom News Network| language=Chinese|accessdate=24 September 2011}}
7. ^{{cite news|last=Anzeige|title=Malaysia: Neue Fahrzeuge für Vorortverkehr|url=http://www.eurailpress.de/article/view//malaysia-neue-fahrzeuge-fuer-vorortverkehr.html|accessdate=25 September 2011|newspaper=EuRailPress.de| language=German|date=5 August 2011|archiveurl=https://web.archive.org/web/20120327170613/http://www.eurailpress.de/article/view//malaysia-neue-fahrzeuge-fuer-vorortverkehr.html|archivedate=27 March 2012}}
8. ^{{cite web|title=Siemens upgrades mass transit system in Kuala Lumpur|url=http://www.siemens.com/press/pool/de/pressemitteilungen/2010/mobility/IMO201011008e.pdf|work=Siemens.com|publisher=Siemens|accessdate=25 September 2011}}
9. ^{{cite web|script-title=zh:马来西亚城际轨道列车|url=http://www.gofront.com/Zoe/ddcz/2011-2-27/MaLaiXiEChengJiGuiDaoLiChe_2.htm|work=gofront.com|publisher=Zhuzhou Electric Locomotive Works| language=Chinese|accessdate=25 September 2011}}
10. ^{{cite web|last=Ministry of Transport|title=NKRA Urban Public Transport|url=http://www.mot.gov.my/en/NKRA/Pages/NKRA.aspx|publisher=MOT|accessdate=3 August 2012}}
11. ^{{cite web|title=南车株机造中国首个城际动车组4S店在吉隆坡开业|url=http://hn.rednet.cn/c/2012/02/23/2525976.htm|work=Rednet.cn|publisher=RedNet|language=Chinese|accessdate=4 March 2012|quote=the main base in Kuala Lumpur Sentul depot, sub-base is located in Perak, the Tanjong Malim}}
12. ^{{cite web|last=Randal|first=Simon|title=Commuter train maintenance depot to built in Seremban|url=http://www.mmail.com.my/story/commuter-train-maintenance-depot-built-seremban|work=The Malay Mail|publisher=MalayMail|accessdate=8 July 2012}}
13. ^{{cite web|last=Miabo|first=Nikolai|title=Quick arrival in the Klang Valley|url=http://www.railwaygazette.com/news/single-view/view/quick-arrival-in-the-klang-valley.html|work=RailwayGazette|publisher=Railway Gazette International|accessdate=3 August 2012}}
14. ^{{cite news|last=Charles, Lourdes|title=MACC probes purchase of Electric Multiple Units|url=http://thestar.com.my/news/story.asp?file=/2010/8/6/nation/6810125&sec=nation|accessdate=8 March 2012|newspaper=The Star Online|date=6 August 2010}}
15. ^{{cite web|last=Dzhulkefly|first=Ahmad|title=PAC wants MACC to investigate purchase of KTMB trains.|url=http://blog.drdzul.com/2010/08/04/pac-wants-macc-to-investigate-purchase-of-ktmb-trains/|accessdate=8 March 2012}}
16. ^{{cite news|last=Maria|first=Stephannie|title=EMU train ready, MACC still lingering|url=http://www.freemalaysiatoday.com/2011/07/18/emu-train-ready-macc-still-lingering/|accessdate=8 March 2012|newspaper=Free Malaysia Today|date=18 July 2011}}
17. ^{{cite news|title=SPRM diminta siasat pembelian tren komuter|url=http://www.utusan.com.my/utusan/info.asp?y=2009&dt=1110&pub=Utusan_Malaysia&sec=Terkini&pg=bt_70.htm|accessdate=8 March 2012|newspaper=Utusan Malaysia|date=10 November 2009|language=Malay}}
18. ^{{cite news|title=Purchase Of DMU Trains Questionable, MACC Asked To Probe|url=http://www.bernama.com/bernama/v6/newsgeneral.php?id=454123|accessdate=8 March 2012|newspaper=Bernama|date=10 November 2009}}
19. ^{{cite web|last=Kauer|first=Shauren|title=KTMB's revival on shaky tracks?|url=http://www.btimes.com.my/Current_News/BTIMES/articles/20120802001831/Article/index_html#ixzz22JrbYdtP|work=BusinessTimes|publisher=btimes.com.my|accessdate=3 August 2012}}
20. ^{{cite news|last1=Augustine|first1=Sean|title=Warranty can be affected if trains not serviced |url=http://www.therakyatpost.com/news/2014/06/17/warranty-can-affected-trains-serviced/#ixzz39bCBdXoq|accessdate=6 August 2014|publisher=Rakyat Post|date=Jun 17, 2014}}
21. ^{{cite web|last=Ismail|first=Azizul|title=More Komuter trains by July and less waiting time|url=http://www.thesundaily.my/news/335871|work=The Sun|publisher=thesundaily.my|accessdate=8 July 2012}}
22. ^{{cite web|last=Kaos|first=Joseph|title=New trains vandalised|url=http://thestar.com.my/news/story.asp?file=/2012/7/4/nation/11599820&sec=nation|work=The Star Online|publisher=The Star|accessdate=8 July 2012}}
23. ^{{cite news|last1=Muhammad|first1=Anne|title=KTM Komuter with BN, Najib ads vandalised|url=https://www.malaysiakini.com/news/423197|accessdate=11 May 2018|work=Malaysiakini|date=5 May 2018}}
24. ^{{cite web|first=Nurul |last=Riduan|title=Komuter tergelincir di Stesen Shah Alam|url=http://www.sinarharian.com.my/semasa/komuter-tergelincir-di-stesen-shah-alam-1.131330|publisher=SinarHarian|accessdate=31 October 2013|language=Malay}}
25. ^{{Cite web|url=https://www.hmetro.com.my/mutakhir/2018/08/370643/komuter-terlajak-brek|title=Komuter terlajak brek|last=Zain|first=Ruwaida Md|date=2018-08-23|website=HM Online|language=ms|access-date=2019-03-27}}
26. ^{{cite news|url=https://www.nst.com.my/news/nation/2018/10/422308/trains-crash-tanjung-malim-ets-and-ktm-komuter-services-disrupted|title=Trains crash in Tanjung Malim; ETS and KTM Komuter services disrupted|accessdate=18 October 2018|publisher=Mohd Hafizee Mohd Arop|agency=New Straits Times}}
27. ^{{cite news|last=Sivanandam|first=Hemananthani|title=First set of EMU six-car trains to run in January|url=http://www.thesundaily.my/news/244801|accessdate=5 March 2012|newspaper=theSunDaily|date=21 December 2011}}
28. ^{{cite web|title=KTMB's commuter service gets a boost|url=http://www.nst.com.my/top-news/ktmb-s-commuter-service-gets-a-boost-1.24404#ixzz1hjtjk4yh|work=New Straits Times|publisher=NST|accessdate=4 March 2012}}
29. ^{{cite web|last=Adnan|first=Amimudin|title=Steps being taken to improve KTM service|url=http://thestar.com.my/news/story.asp?file=/2012/2/23/focus/10787054&sec=focus|work=The Star Online|publisher=The Star Online|accessdate=4 March 2012}}
30. ^{{cite news|title=New KTM Komuter trains launched|url=http://thestar.com.my/news/story.asp?file=/2012/3/8/nation/20120308180557&sec=nation|accessdate=8 March 2012|newspaper=The Star Online|date=8 March 2012}}

External links

{{commons category-inline|Ktmb class 92}}{{Rail transport in Malaysia}}

3 : KTM Komuter|Multiple units of Malaysia|CRRC multiple units

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/18 14:03:15