请输入您要查询的百科知识:

 

词条 Kurram Tangi Dam
释义

  1. Location

  2. Dam and spillways

  3. Reservoir

  4. Irrigation system

  5. Work Progress

  6. See also

  7. References

{{Infobox dam
| name = Kurram Tangi Dam
| name_official =
| image =
| image_size =
| image_caption =
| image_alt =
| location_map = Pakistan
| location_map_size =
| location_map_caption =
| location_map_alt =
| coordinates = {{coord|33.0513654|70.5268763|type:landmark|display=inline}}
| country =
| location = North Waziristan
| purpose =
| status =
| construction_began = July 2016[1]
| opening = April 2019 (est)[1]
| demolished =
| cost = PKR. 30 Billion[1]
| builder =
| owner = Government of Khyber Pakhtunkhwa
| operator =
| dam_type =
| dam_crosses = Kurram River
| dam_height_foundation =
| dam_height_thalweg =
| dam_length = 98m (322ft)[2]
| dam_elevation_crest =
| dam_width_crest =
| dam_width_base =
| dam_volume =
| spillway_count =
| spillway_type =
| spillway_capacity =
| res_name =
| res_capacity_total = 1.2MAF[2]
| res_capacity_active = 0.9MAF[2]
| res_capacity_inactive =
| res_catchment =
| res_surface =
| res_max_length =
| res_max_width =
| res_max_depth =
| res_elevation =
| res_tidal_range =
| lower_dam_type =
| lower_dam_crosses =
| lower_dam_height_foundation =
| lower_dam_height_thalweg =
| lower_dam_length =
| lower_dam_elevation_crest =
| lower_dam_width_crest =
| lower_dam_width_base =
| lower_dam_volume =
| lower_spillway_count =
| lower_spillway_type =
| lower_spillway_capacity =
| lower_res_name =
| lower_res_capacity_total =
| lower_res_capacity_active =
| lower_res_capacity_inactive =
| lower_res_catchment =
| lower_res_surface =
| lower_res_max_length =
| lower_res_max_width =
| lower_res_max_depth =
| lower_res_elevation =
| lower_res_tidal_range =
| plant_name =
| plant_coordinates =
| plant_operator =
| plant_commission =
| plant_decommission =
| plant_type =
| plant_hydraulic_head =
| plant_turbines =
| plant_pumpgenerators =
| plant_pumps =
| plant_capacity = 83.4MW[2]
| plant_capacity_factor =
| plant_efficiency =
| plant_storage_hours =
| plant_annual_gen = 350GWh[2]
| plant_annual_gen_year = (est)
| website =
| extra =
}}

Kurram Tangi Dam is a dam under construction on the Kurram River in Bannu and North Waziristan Agency, Pakistan.

Location

The Kurram Tangi Dam is located across Kurram river in North Waziristan Agency, about 14 km upstream of Kurram Garhi Headworks and 32 km north of Bannu City in the Federally Administrated Tribal Area (FATA).[2]

Dam and spillways

The dam was to have a height of 98m (322 ft).

Reservoir

This reservoir was to have a gross capacity of 1.2MAF and a live capacity of 0.9MAF. It offers a gross water storage capacity of 1.2 million acre-feet (MAF) and power generation capacity of 83.4MW. The project was to be constructed in two stages. Stage-I was to be completed in about three years. With Stage-I, more than 16,000 acres of land in North Waziristan Agency will be irrigated, while about 18MW of electricity will be generated.

Irrigation system

The system was to irrigate a command area of 84,380 acres and have hydro-power generation capacity of 83.4 MW. The dam was to supplement 278,000 acres of existing system of Civil and Marwat Canals.[3]

Work Progress

On January 2013 USAID offered US $81 million for Keitu weir and irrigation. Construction was slated to begin in March.[4] Italy offered US$ 45 Million for Command Area Development to be executed by FATA Secretariat.

On June 7, 2016 the Contract Agreement was signed and the Engineer’s Order to Commence was issued a week later.

In July 2016, construction started.

On March 3, 2017, Prime Minister Nawaz Sharif laid the foundation stone.[5]

April 2019 was the estimated completion date[6]

As of March 2018, the physical progress of the project was 16.71%, while the financial progress of the project is 15.23%.

See also

  • List of dams and reservoirs in Pakistan

References

1. ^{{cite web|url=https://nation.com.pk/13-Jul-2017/work-on-kurram-tangi-dam-in-full-swing|title=Work on Kurram-Tangi Dam in full swing|date=13 July 2017|publisher=}}
2. ^Kurram Tangi Dam
3. ^{{cite web|title=KURRAM TANGI DAM MULTIPURPOSE PROJECT|url=http://www.wapda.gov.pk/htmls/KurmTngDam.htm|publisher=WAPDA, Govt. of Pakistan|accessdate=6 July 2012}}
4. ^{{cite web|title=USAID to provide funds for Kurram Tangi Dam|url=http://paktribune.com/business/news/USAID-to-provide-funds-for-Kurram-Tangi-Dam-10783.html|publisher=Pak Tribune|accessdate=8 February 2013|date=16 January 2013}}
5. ^{{cite web|url=https://www.dawn.com/news/1318172/pm-nawaz-lays-foundation-stone-of-kurram-tangi-dam-in-north-waziristan|title=PM Nawaz lays foundation stone of Kurram Tangi Dam in North Waziristan|first=|last=Dawn.com|date=3 March 2017|publisher=}}
6. ^Kurram Tangi Dam
{{Dams in Pakistan}}{{pakistan-struct-stub}}

2 : Dams in Pakistan|Proposed dams

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/22 4:00:59