请输入您要查询的百科知识:

 

词条 La Barrancosa Dam
释义

  1. References

{{Infobox dam
| name = Jorge Cepernic Dam
| name_official =
| image =
| image_size =
| image_caption =
| image_alt =
| location_map = Argentina
| location_map_size =
| location_map_caption =
| location_map_alt =
| coordinates = {{coord|50|11|31.76|S|70|7|14.64|W|type:landmark|display=inline,title}}
| country = Argentina
| location = Puerto Santa Cruz, Santa Cruz Province
| purpose = Power
| status = UC
| construction_began = July 2015
| opening =
| demolished =
| cost =
| owner =
| dam_type = Embankment, concrete-face rock-fill
| dam_crosses = Santa Cruz River
| dam_length = {{Convert|2900|m|ft|abbr=on}}
| dam_height = {{Convert|43.5|m|ft|abbr=on}}
| dam_height_foundation=
| dam_height_thalweg =
| dam_elevation_crest =
| dam_width_crest =
| dam_width_base =
| dam_volume = {{Convert|6900000|m3|cuyd|abbr=on}}
| spillway_count =
| spillway_type =
| spillway_capacity =
| res_name =
| res_capacity_total = {{Convert|2720000000|m3|acre.ft|abbr=on}}
| res_capacity_active =
| res_capacity_inactive=
| res_catchment =
| res_surface = {{Convert|198|km2|mi2|abbr=on}}
| res_max_length =
| res_max_width =
| res_max_depth =
| res_elevation =
| res_tidal_range =
| plant_name =
| plant_coordinates =
| plant_operator =
| plant_commission =
| plant_decommission =
| plant_type =
| plant_turbines = 5 x 120 MW Kaplan-type
| plant_hydraulic_head = {{Convert|34.65|m|ft|abbr=on}}
| plant_capacity = 600 MW
| plant_annual_gen = 1,866 GWh (estimate)
| website =
| extra =
}}

The La Barrancosa Dam, formerly known as Jorge Cepernic Dam and previously, La Barrancosa Dam, is a concrete-face rock-fill dam being built on the Santa Cruz River about {{Convert|115|km|mi|abbr=on}} west of Puerto Santa Cruz in Santa Cruz Province, Argentina. It was renamed after the former governor of Santa Cruz Jorge Cepernic. A consortium led by China's Gezhouba Group was awarded the contract to build the Jorge Cepernic Dam and the Néstor Kirchner Dam upstream in August 2013. The consortium will also fund the construction. Both dams are expected to cost nearly US$4.8 billion.[1] It will be built by the firm Electroingeniería, led by Osvaldo Acosta and Gerardo Ferreyra.[2] The primary purpose of the dam is hydroelectric power generation and its power station will have an installed capacity of 600 MW.[3]

In July 2015 machines arrived in Santa Cruz for the construction of the dams.[4]

References

1. ^{{cite news | url=http://en.mercopress.com/2013/08/22/china-will-build-and-finance-two-dams-in-patagonia-equivalent-to-10-of-argentine-power-demand | title=China will build and finance two dams in Patagonia equivalent to 10% of Argentine power demand | date=22 August 2013 | accessdate=28 April 2014}}
2. ^Represas Kirchner y Cepernic | La última gran joya de los reyes de la obra pública {{es}}
3. ^{{cite news | url=http://www.obraspublicas.gov.ar/documentos/Libros_Respresas/Libro_Ingles.pdf | title=Hydroelectric Projects in the Santa Cruz River | work=Water and Energy National and Regional Integration | agency=Government of Argentina |page=95| accessdate=28 April 2014}}
4. ^[https://web.archive.org/web/20151009200506/http://www.minplan.gob.ar/noticia/21931/arribaron-maquinas-para-las-represas-kirchner-cepernic.html Ministerio de Planificación - Arribaron máquinas para las Represas Kirchner-Cepernic [web.archive.org]]
{{Argentina-struct-stub}}

5 : Dams in Argentina|Buildings and structures in Santa Cruz Province, Argentina|Buildings and structures under construction in Argentina|Dams under construction|Concrete-face rock-fill dams

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/12 10:22:02