请输入您要查询的百科知识:

 

词条 Brașov Airport
释义

  1. History

  2. See also

  3. References

  4. External links

{{Infobox airport
| name = Brașov-Ghimbav International Airport
| nativename = Aeroportul Internațional Brașov-Ghimbav
| IATA =
| ICAO = LROV
| type = Public
| operator = Brașov County Council
| city-served = Brașov
| location = Ghimbav, Brașov County
| coordinates = {{coord|45|42|06|N|25|31|12|E|region:RO|display=inline,title}}
| website = aeroportbrasov.ro
| pushpin_map = Romania
| pushpin_label_position =
| pushpin_label = BRV
| pushpin_map_alt =
| pushpin_mapsize =
| pushpin_image =
| pushpin_map_caption = Location within Romania
| metric-rwy = Y
| r1-number = 04/22
| r1-length-f = 9,252
| r1-length-m = 2,820
| r1-surface = Concrete[1]
| elevation-m = 530
| elevation-f = 1740
}}

Brașov-Ghimbav International Airport is an airport currently under construction in Ghimbav, near Brașov, Romania right by the future A3 motorway.

History

The project is widely supported by the local population and some businesses in the area have announced plans to switch to air freight services. It is predicted that the airport will create 4,000 jobs and will reach 1 million passengers in 8 years, with a further 6,000 jobs being generated indirectly. Planned costs of the project are estimated at €87 million.[2]

In 2006, the Romanian State Domain Agency transferred 110 hectares of land to Brașov County. Intelcan Canada was to develop and build the airport in coordination with Brașov, Harghita, and Covasna counties as well as Ghimbav city. The airport's charter was officially signed on 14 November 2005. Intelcan inaugurated the construction of the airport on 15 April 2008.[3] The initial target for completion was twenty-four to thirty months. However, due to legal matters and a lack of funds, the construction works had stopped and Intelcan left the project, being replaced by the local authorities.

On 18 November 2012, the Brașov County authorities signed a €12.7 million (VAT excluded) contract with Vectra Service, a local construction company, for building the runway.[4] Eventually, construction of the airport restarted in April 2013 with the works at the {{convert|2820|m|ft|abbr=on|0}} runway.[2][5] On 3 October 2014, the runway was officially inaugurated.[6]

Negotiations are still ongoing for the construction of the main terminal building, designed to handle a capacity of one million passengers per year. The terminal will be built modularly, allowing future extensions.

See also

  • Aviation in Romania
  • Transport in Romania

References

1. ^{{Cite web |url=http://www.aeroportbrasov.ro/stiri/# |title=Archived copy |access-date=2008-12-02 |archive-url=https://web.archive.org/web/20081027015315/http://www.aeroportbrasov.ro/stiri/# |archive-date=2008-10-27 |dead-url=yes |df= }}
2. ^The future Brașov Airport at adevarul.ro {{Ro icon}}
3. ^AeroportBrasov.ro » A fost inagurarea
4. ^12,7 milioane de euro pentru construcţia pistei aeroportului internaţional Braşov-Ghimbav at gandul.info {{Ro icon}}
5. ^{{cite web | url=http://www.airportbrasov.ro/en/index.php?itemid=20 | title=Works begin on the Brașov-Ghimbav international airport | date=2013-04-27 | accessdate=2013-06-01 | archive-url=https://web.archive.org/web/20141006093355/http://www.airportbrasov.ro/en/index.php?itemid=20# | archive-date=2014-10-06 | dead-url=yes | df= }}
6. ^Pista aeroportului Brașov-Ghimbav a fost inaugurată {{Ro icon}}

External links

  • [https://web.archive.org/web/20171017105423/http://www.aeroportbrasov.ro/ Project's website]
  • Brașov City Council. "General Information on Brașov International Airport". February 30, 2006.
{{Portalbar|Romania|Aviation}}{{Airports in Romania}}{{DEFAULTSORT:Brasov Airport}}{{Europe-airport-stub}}{{Romania-struct-stub}}{{Romania-transport-stub}}

3 : Airports in Romania|Proposed airports|Proposed transport infrastructure in Romania

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 5:14:32