词条 | Cross River Tram |
释义 |
| box_width = | name = Cross River Tram | image = Cross-river tram logo.png | imagesize = 150px | image2 = River Thames and Waterloo Bridge, London-17Aug2009.jpg | imagesize2 = 250px | caption2 = Waterloo Bridge, the planned crossing point for the tram over the River Thames | locale = Camden, Southwark & Lambeth, London, England | transit_type = Tram | lines = | stations = | operation_will_start = Abandoned proposal | owner = Transport for London | system_length = {{convert|10|mi|km|abbr=on}} | track_gauge = Standard gauge | map = | map_state = collapsed }} Cross River Tram (formerly Cross River Transit) was a Transport for London (TfL) proposal for a {{convert|10|mi|km|adj=on}} tram system in London. It was planned to run on a north-south route from Camden Town in the north, via King's Cross, to Peckham and Brixton in the south. The Cross River Tram scheme was proposed to relieve overcrowding on the London Underground and was due to begin operation by 2016. The project was cancelled in 2008 due to funding problems. In June 2016, A Green Party member of the London Assembly Caroline Russell had asked new mayor of London Sadiq Khan to review the business case for a tram service via Waterloo Bridge and Elephant & Castle.[1] However, in July 2016, the Mayor of London Sadiq Khan has said he does not intend to revive the Cross River Tram project cancelled by his predecessor Boris Johnson.[2] OverviewThe tram was planned to relieve overcrowding on the London Underground, and to improve transport in areas currently without good public transport, such as the Aylesbury Estate in Southwark, to support regeneration. Trams would have run up to every 4 minutes on each branch, giving a 2-minute service through central London at peak times. Despite following the same route, it was not envisaged that the Cross River Tram line would use the former Kingsway tramway subway. CancellationOn 18 July 2007, Mayor of London Ken Livingstone told the London Assembly[3] that he had asked TfL to consider splitting the implementation by building the southern section in advance of the northern section; it was not, however, clear where such a split would be. In May 2008, Livingstone's successor as mayor, Boris Johnson, announced that he intended to review the project in light of the lack of central government funding for the planned route.[4] On 6 November 2008, Transport for London announced that the Cross River Tram would not be built. In a statement, it said: "Given the lack of funding available to implement the project and the likelihood of not securing additional third party funding, TfL is not in a position to develop the scheme any further."[5] The £1.3bn project was cancelled in 2008 as art of a move to save £2.4bn of transport-related funds. Official announcements from TfL in 2009 stated that the project was "on hold", and that TfL would be explore alternative schemes, including increased capacity on Underground lines.[6] In June 2016, A Green Party member Caroline Russell of the London Assembly has asked new mayor of London Sadiq Khan to review the business case for a tram service via Waterloo Bridge and Elephant & Castle.[7] Khan subsequently stated that he had no plans to revive the cancelled tram scheme, and he expressed the view that improved Tube services and the extension of the London Overground through south London suburbs, along with the proposed re-opening of Camberwell railway station, would meet the transport needs along the corridor that would have been served by the Cross River Tram.[8] Proposed route{{Cross River Tram map}}In late 2006 and early 2007 TfL consulted residents on their views of the following route options:
Waterloo – (either Lambeth North/Imperial War Museum/Kennington Cross or Elephant & Castle) – Oval – (either Stockwell or Brixton Road) – Brixton (either Pope's Road or Brixton St Matthew's Church)
Waterloo – St George's Circus – Elephant & Castle – Heygate Street – Thurlow Street – (either Burgess Park/Chandler Way or Wells Way/Southampton Way) – Peckham
Euston – (either Crowndale Road or Somers Town) – King's Cross On 11 September 2007, TfL published the results of their 2007 consultation:[9]
References1. ^ London SE1 Community Website – 29 May 2008 2. ^ London SE1 Community Website – 29 May 2008 3. ^Webcast 18 July 2007 Mayor of London 4. ^Cross River Tram under review says Boris Johnson London SE1 Community Website – 29 May 2008 5. ^[https://web.archive.org/web/20110604130243/http://www.tfl.gov.uk/corporate/media/newscentre/archive/10231.aspx Mayour outlines 10-year plan for massive transport expansion] Transport for London 6 November 2008 6. ^{{cite web|title=Projects and Schemes: Cross River Tram|url=http://www.tfl.gov.uk/corporate/projectsandschemes/2043.aspx|publisher=Transport for London|archiveurl=https://web.archive.org/web/20091014013331/http://www.tfl.gov.uk/corporate/projectsandschemes/2043.aspx|archivedate=14 October 2009|date=2009|accessdate=26 January 2018|deadurl=yes}} 7. ^ London SE1 Community Website – 29 May 2008 8. ^{{cite news|title=Cross River Tram: Sadiq Khan declines to revive scheme|url=http://www.london-se1.co.uk/news/view/8812|accessdate=26 January 2018|work=London SE1|archiveurl=https://web.archive.org/web/20180126113745/http://www.london-se1.co.uk/news/view/8812|archivedate=26 January 2018|language=en|deadurl=no}} 9. ^Transport for London. Public consultation on route options September 2007 External links{{Portal|London transport|UK Trams}}
2 : Abandoned light rail projects in the United Kingdom|Trams in London |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。