请输入您要查询的百科知识:

 

词条 Docklands Light Railway
释义

  1. History

     Origins and development  Initial system (1987–1990)  First stage extensions (1991–1994)  Second stage extensions (1996–1999)  Third stage extensions and enhancements (2004–2009)  Stratford International to Canning Town extension (2011) 

  2. Current system

     Network  Services  Stations  Fares and ticketing  Performance  Rolling stock  Future rolling stock  Depots  Signalling technology 

  3. Developments since 2008

     Upgrading entire system to three-car trains  Stratford International extension  Relocation of Pudding Mill Lane station 

  4. Proposed developments

     Dagenham Dock extension  Thames Wharf station  Connaught Road/Silvertown Interchange station  Victoria/Charing Cross extensions  Euston/St Pancras extension  Lewisham to Catford/Lewisham to Beckenham Junction extension  Lewisham to Bromley North extension  Gallions Reach Crossing & Thamesmead Extension  Replacement of Tower Gateway station with interchange at Tower Hill 

  5. Accidents and incidents

     Overrun of station buffers  Collision at West India Quay bridge  South Quay bombing 

  6. Management

  7. In media

  8. See also

  9. Notes

  10. References

     Bibliography 

  11. External links

{{Use British English|date=January 2013}}{{Use dmy dates|date=January 2013}}{{Infobox public transit
| box_width =
| name = Docklands Light Railway
| image = DLR roundel.svg
| imagesize = 150px
| image2 = Docklands Light Railway trein in Shadwell (12753975413).jpg
| imagesize2 = 250px
| caption2 = A DLR train at Shadwell
| owner = Docklands Light Railway Ltd, part of Transport for London
| locale = Greater London
| transit_type = Rapid transit/Light metro
| lines = 7
| stations = 45
| ridership = 340,000 (daily average, DfT 2017)
| annual_ridership = 119.6 million (2017/18)[1]
{{increase}} 4.6%
| chief_executive =
| headquarters =
| website = {{url|www.tfl.gov.uk/modes/dlr/|DLR}}
| began_operation = 31 August 1987
| operator = KeolisAmey Docklands Ltd. Keolis (70%)/Amey (30%)
| marks =
| character =
| vehicles = 149 DLR rolling stock
| train_length = 2 or 3 carriages per trainset
| headway =
| system_length = {{convert|38|km|mi|abbr=on}}
| notrack =
| track_gauge = {{RailGauge|sg|allk=on}}
| minimum_radius_of_curvature = {{convert|38|m|ft|abbr=on}}
| el = 750 V DC third rail
| average_speed =
| top_speed = {{convert|80|km/h|abbr=on}}[2](Maximum Speed Capable)
{{convert|64|km/h|mph|abbr=on}} (Regular Operational Speed)
| map =
| map_name =
| map_state = collapsed
}}{{DLR Route diagram}}

The Docklands Light Railway (DLR) is an automated light metro system opened in 1987 to serve the redeveloped Docklands area of East London, England.[3][4] It reaches north to Stratford, south to Lewisham across the River Thames, west to {{DLR stations|station=Tower Gateway}} and {{LUL stations|station=Bank}} in the City of London financial district, and east to Beckton, London City Airport, and to Woolwich Arsenal south of the river.

The system uses minimal staffing on trains and at major interchange stations; the four below-ground stations are staffed to comply with underground station fire and safety requirements. Similar proposals have been made for the Tube.[5]

The DLR is operated under a franchise awarded by Transport for London to KeolisAmey Docklands, a joint venture between transport operator Keolis and infrastructure specialists Amey plc. It was previously run for over 17 years by Serco Docklands,[6] part of the Serco Group.[7][8] The system is owned by Docklands Light Railway Ltd,[9] part of the London Rail division of Transport for London. In 2017/18 the DLR carried 119.6 million passenger journeys,[1] down from 122.3m the previous year.[10] It has been extended several times and further extensions are under consideration.

History

Origins and development

The docks immediately east of Central London began to decline in the early 1960s as cargo became containerised.[11] They had been connected to the national railway network via the London and Blackwall Railway (L&BR), which was closed in 1966 for lack of traffic.[12] The opening of the Tilbury container docks, further east in Essex, finally rendered them redundant, and in 1980 the government gained control of the now-derelict area.

As early as 1972, consideration was given to how to redevelop the moribund Docklands. Travis Morgan & Partners were commissioned by the London Docklands Study Team to consider the issue. They proposed, among other recommendations, that a "minitram" people-mover system capable of carrying up to 20 people in each unit should be constructed to connect the Docklands with the planned Fleet line tube railway terminus at Fenchurch Street railway station. The Greater London Council formed a Docklands Joint Committee with the Boroughs of Greenwich, Lewisham, Newham, Southwark and Tower Hamlets in 1974 to undertake the redevelopment of the area. A light railway system was envisaged, terminating either at Tower Hill Underground station or at Fenchurch Street, but both options were seen as too expensive. Nonetheless, in 1976 another report proposed a conventional tube railway for the area and London Transport obtained Parliamentary powers to build a line from Charing Cross railway station to Fenchurch Street, Surrey Docks (now Surrey Quays railway station), the Isle of Dogs, North Greenwich and Custom House to Woolwich Arsenal. This was intended to be the second stage of the Fleet line – which had been renamed the Jubilee line, the first stage of which opened in 1979 from {{LUL stations|station=Stanmore}} to {{LUL stations|station=Charing Cross}}. However, when the Conservative Party came to power in May 1979 under Margaret Thatcher, the plans to extend the Jubilee line were halted and the new government insisted that a lower-cost option should be pursued.[13]

The government created the London Docklands Development Corporation (LDDC) in July 1981 to coordinate the redevelopment of the Docklands. The need to provide a cheap public transport solution led to it commissioning London Transport to evaluate a number of exclusively light rail options. The core of the route ran alongside the Great Eastern line out of London and south along the former London & Blackwall Railway line through the Isle of Dogs. Three terminus options were proposed at the west end, at Tower Hill, Minories and Aldgate East. The Tower Hill option would have required a low-level interchange to be constructed alongside the existing Underground station, but this would have been a very costly venture. The Minories option, a high-level station virtually on the site of the old Minories railway station, was selected and became the current Tower Gateway DLR terminus.[13] Aldgate East would have been perhaps the most ambitious of all of the options, as it originally envisaged a low-level connection with the District line that would have allowed DLR trains to run on Underground tracks to a variety of central London destinations. However, it quickly became apparent that there was no capacity on the existing network for integrating the DLR into the Underground.[14]

Two southern terminus options were put forward, at Cubitt Town (today's Island Gardens station) and Tiller Road, on the west side of Millwall Dock, with two possible routes to reach them. A "western" route would have run from the Westferry station alongside West Ferry Road via Cuba Street, then either terminating at Tiller Road or continuing over Millwall Docks Cut to a terminus at Cubitt Town. The "central" option required the West India Docks to be infilled or bridged and would run down the middle of the peninsula, through what was at the time an area of derelict warehouses.[14] Ultimately this latter option was chosen, though the 1981 London Transport report warned that without extensive development around Canary Wharf the area would be "very isolated with poor traffic prospects" – as indeed it was, for a number of years.[15]

The contract for the initial system was awarded to GEC Mowlem in 1984[16] and the system was constructed from 1985 to 1987 at a cost of £77 million.[17] The line was formally opened by Queen Elizabeth II on 30 July 1987, and passenger services began on 31 August.[16]

Initial system (1987–1990)

The initial system comprised two routes, from {{DLR stations |station=Tower Gateway}} and Stratford to {{DLR stations |station=Island Gardens}}. It was mainly elevated on disused railway viaducts or new concrete viaducts, and adopted disused surface railway formations between Poplar and Stratford. The trains were fully automated, controlled by computer, and had no driver; a Passenger Service Agent (PSA) on each train, originally referred to as a "Train Captain", was responsible for patrolling the train, checking tickets, making announcements and controlling the doors. PSAs could take control of the train in circumstances including equipment failure and emergencies.[18][19] A total of eleven EMUs supplied by Linke-Hofmann-Busche comprised the first generation of the Docklands Light Railway rolling stock.[20]

The system was lightweight, with stations designed for trains of only a single articulated vehicle. The three branches totalled {{convert|8|mi|km}}, had 15 stations, and were connected by a flat triangular junction near {{DLR stations |station=Poplar}}. Services ran from Tower Gateway to Island Gardens and from Stratford to Island Gardens; the north side of the junction was used only for access to the depot at Poplar.[3][16][21] The stations were mostly of a common design and constructed from standard components. A common feature was a short half-cylindrical glazed blue canopy. All stations were above ground and were generally unstaffed, although later extension included stations below ground which were required by law to be staffed in case of evacuation.

First stage extensions (1991–1994)

The initial system had a relatively low capacity, but the Docklands area very quickly developed into a major financial centre and employment zone, increasing traffic. In particular Tower Gateway, at the edge of the City of London, attracted criticism for its poor connections, as it did not connect directly with the nearby Tower Hill Underground station or Fenchurch Street railway station. The criticism arose partly because the system usage was higher than expected.[22] Plans were developed, before the system opened, to extend it to {{LUL stations|station=Bank}} in the west and Beckton in the east.[23] Stations and trains were extended to two-unit length, and the system was expanded into the heart of the City of London to {{LUL stations|station=Bank}} through a tunnel, which opened in 1991.[24] This extension left {{DLR stations |station=Tower Gateway}} on a stub. The original trains were not suitable for underground usage due to not meeting the fire safety laws for underground trains.[20] They were operated for a time on the above-ground sections only, and were later sold.

As the Canary Wharf office complex grew, Canary Wharf DLR station was redeveloped from a small wayside station to a large one with six platforms serving three tracks and a large overall roof, fully integrated into the malls below the office towers.[25]

The east of Docklands needed better transport connections to encourage development, and a fourth branch, towards Beckton, was planned, with several route options available.[26] A route from {{DLR stations |station=Poplar}} via {{LUL stations|station=Canning Town}} and the north side of the Royal Docks complex was chosen, and opened in 1994.[16] Initially it was thought the line was likely to be underutilised, due to the sparse development in the area.[27] As part of this extension, one side of the original flat triangular junction was replaced by a grade-separated junction west of Poplar. Poplar was rebuilt to give cross-platform interchange between the Stratford and Beckton lines, with a new grade-separated junction built east of the station at the divergence of the Stratford and Beckton lines.

Second stage extensions (1996–1999)

Early on, Lewisham London Borough Council commissioned a feasibility study into extending the system under the River Thames. This led the council to advocate an extension via Greenwich and Deptford, terminating at Lewisham railway station.[28] The ambitions of the operators were supported by politicians in Parliament, including the future Labour Deputy Prime Minister John Prescott, and Lord Whitty; and by 1996 construction work had begun.[25][29][30]

The Lewisham extension opened on 3 December 1999.[31] It left the Island Gardens route south of the Crossharbour turn-back sidings, and dropped gently to {{DLR stations |station=Mudchute}}, where a street-level station replaced the high-level one on the former London & Blackwall Railway viaduct. The line then entered a tunnel, following the route of the viaduct to a shallow subsurface station at {{DLR stations |station=Island Gardens}}, accessible by stairs or a lift. It crossed under the Thames to {{DLR stations |station=Cutty Sark}} in the centre of Greenwich, and surfaced at Greenwich railway station, with cross-platform interchange between the northbound track and the London-bound main line. The line snaked on a concrete viaduct to {{DLR stations |station=Deptford Bridge}}, before descending to {{DLR stations |station=Elverson Road}} at street level, close to Lewisham town centre, terminating in two platforms between and below the main-line platforms at Lewisham railway station, with buses stopping outside the station. The extension quickly proved profitable.[32]

Third stage extensions and enhancements (2004–2009)

The next developments were aided by a five-year programme of investment for public transport across London that was unveiled by Mayor of London Ken Livingstone on 12 October 2004.[33] On 2 December 2005, an eastward branch along the approximate route of the former Eastern Counties and Thames Junction Railway on the southern side of the Royal Docks complex opened from Canning Town to {{DLR stations |station=King George V}} via {{DLR stations |station=London City Airport}}.[34]

A further extension from {{DLR stations |station=King George V}} to Woolwich Arsenal opened on 10 January 2009, providing interchange with the North Kent main line, close to the planned future stop on the Crossrail line to Abbey Wood via West India and Royal Docks,[3] met by Private Finance Initiative funding.[35] Construction began in June 2005, the same month that the contracts were finalised,[36] and the tunnels were completed on 23 July 2007,[37] and formally opened by Boris Johnson, Mayor of London on 12 January 2009.[38] Following completion, the project was shortlisted for the 2009 Prime Minister's Better Public Building Award.[39]

The original {{DLR stations |station=Tower Gateway|link=true}} was closed in mid-2008 for complete reconstruction. The two terminal tracks either side of a narrow island platform were replaced by a single track between two platforms, one for arriving passengers and the other for departing (Spanish solution). It reopened on 2 March 2009.[40][41]

As part of an upgrade to allow three-car trains, strengthening work was necessary at the Delta Junction north of {{DLR stations |station=West India Quay}}.[42] It was decided to include this in a plan for further grade separation to eliminate the conflict between services to Stratford and from Bank. A new timetable was introduced, with improved frequencies at peak hours. The new grade-separated route from Bank to Canary Wharf is used throughout the day, bypassing West India Quay station until mid-evening.[43] Work on this project proceeded concurrently with the three-car upgrade work and the 'diveunder' (sometimes referred to as a flyunder but DLR have coined the term in this instance 'diveunder'), and the improved timetable came into use on 24 August 2009.[44]

Stratford International to Canning Town extension (2011)

In addition to the three-car station extensions, part of which was funded from the 2012 Olympics budget, a line was opened from Canning Town to Stratford and Stratford International railway station along the former North London Line of the national railway system, with additional stations. It parallels the London Underground Jubilee line for much of its length. A substantial multi-level flying junction was built south of Canning Town to enable trains from Bank/Poplar and Stratford International to operate to either of the eastern termini at Beckton and Woolwich Arsenal. There are through trains between all these points, with different patterns at different times of the day. The extension suffered some delay in opening, being completed in August 2011. It provides a direct link between two of the major Olympics locations: the Stadium and Park at Stratford and the ExCeL adjacent to Custom House on the Beckton line.

Current system

Network

The DLR has {{convert|38|km|mi}} of tracks,[45] with 45 stations.[46] There are six branches: to Lewisham in the south, {{LUL stations|station=Stratford}} and Stratford International in the north, {{DLR stations |station=Beckton}} and Woolwich Arsenal in the east, and Central London in the west, splitting to {{LUL stations|station=Bank}} and {{DLR stations |station=Tower Gateway}}.[47]

The northern, southern and south-eastern branches terminate at the National Rail stations at Stratford, Stratford International, Lewisham and Woolwich Arsenal. Other interchanges with National Rail are at Limehouse, Greenwich and West Ham, while out of station interchanges for Oyster card holders exist between Shadwell DLR station and London Overground's station of the same name, and between Fenchurch Street and the DLR's western termini Tower Gateway and Bank.[48]

Between Limehouse and Tower Gateway, the DLR runs parallel to the London, Tilbury and Southend Railway.

Services

Although the layout allows many different routes, the following are operated in normal service:[49]

Peak Service
Route tph Calling at
Bank}} - {{DLRstation|Lewisham}} 15 Shadwell}}, {{DLRstation|Limehouse}}, {{DLRstation|Westferry}}, {{DLRstation|West India Quay}} (Bank-bound only), {{DLRstation|Canary Wharf}}, {{DLRstation|Heron Quays}}, {{DLRstation|South Quay}}, {{DLRstation|Crossharbour}}, {{DLRstation|Mudchute}}, {{DLRstation|Island Gardens}}, {{DLRstation|Cutty Sark}}, {{DLRstation|Greenwich}}, {{DLRstation|Deptford Bridge}}, {{DLRstation|Elverson Road}}
Woolwich Arsenal}} 7.5 Poplar}}, {{DLRstation|Blackwall}}, {{DLRstation|East India}}, {{DLRstation|Canning Town}}, {{DLRstation|West Silvertown}}, {{DLRstation|Pontoon Dock}}, {{DLRstation|London City Airport}}, {{DLRstation|King George V}}
Tower Gateway}} - {{DLRstation|Beckton}} 7.5 Royal Victoria}}, {{DLRstation|Custom House}}, {{DLRstation|Prince Regent}}, {{DLRstation|Royal Albert}}, {{DLRstation|Beckton Park}}, {{DLRstation|Cyprus}}, {{DLRstation|Gallions Reach}}
Stratford}} - Lewisham 7.5 Pudding Mill Lane}}, {{DLRstation|Bow Church}}, {{DLRstation|Devons Road}}, {{DLRstation|Langdon Park}}, {{DLRstation|All Saints}}, Poplar, {{DLRstation|West India Quay}}, Canary Wharf, Heron Quays, South Quay, Crossharbour, Mudchute, Island Gardens, Cutty Sark, Greenwich, Deptford Bridge, Elverson Road
Stratford - Canary Wharf 7.5 Pudding Mill Lane, Bow Church, Devons Road, Langdon Park, All Saints, Poplar, West India Quay
Stratford International}} - Woolwich Arsenal 7.5 Stratford}}, {{DLRstation|Stratford High Street}}, {{DLRstation|Abbey Road}}, {{DLRstation|West Ham}}, {{DLRstation|Star Lane}}, Canning Town, West Silvertown, Pontoon Dock, London City Airport, King George V
Off-peak Service
Route tph Calling at
Bank}} - {{DLRstation|Lewisham}} 12 Shadwell}}, {{DLRstation|Limehouse}}, {{DLRstation|Westferry}}, {{DLRstation|West India Quay}} (Bank-bound only), {{DLRstation|Canary Wharf}}, {{DLRstation|Heron Quays}}, {{DLRstation|South Quay}}, {{DLRstation|Crossharbour}}, {{DLRstation|Mudchute}}, {{DLRstation|Island Gardens}}, {{DLRstation|Cutty Sark}}, {{DLRstation|Greenwich}}, {{DLRstation|Deptford Bridge}}, {{DLRstation|Elverson Road}}
Woolwich Arsenal}} 6 Poplar}}, {{DLRstation|Blackwall}}, {{DLRstation|East India}}, {{DLRstation|Canning Town}}, {{DLRstation|West Silvertown}}, {{DLRstation|Pontoon Dock}}, {{DLRstation|London City Airport}}, {{DLRstation|King George V}}
Tower Gateway}} - {{DLRstation|Beckton}} 6 Royal Victoria}}, {{DLRstation|Custom House}}, {{DLRstation|Prince Regent}}, {{DLRstation|Royal Albert}}, {{DLRstation|Beckton Park}}, {{DLRstation|Cyprus}}, {{DLRstation|Gallions Reach}}
Canning Town}} - Beckton
Inter-peak only.
6 Royal Victoria, Custom House, Prince Regent, Royal Albert, Beckton Park, Cyprus, Gallions Reach
Stratford}} - Canary Wharf 6 Pudding Mill Lane}}, {{DLRstation|Bow Church}}, {{DLRstation|Devons Road}}, {{DLRstation|Langdon Park}}, {{DLRstation|All Saints}}, Poplar, West India Quay
Stratford International}} - Woolwich Arsenal 6 Stratford}}, {{DLRstation|Stratford High Street}}, {{DLRstation|Abbey Road}}, {{DLRstation|West Ham}}, {{DLRstation|Star Lane}}, Canning Town, West Silvertown, Pontoon Dock, London City Airport, King George V

There is capability for an additional shuttle from Canning Town to Prince Regent when exhibitions are in progress at the ExCeL exhibition centre.

At terminal stations trains reverse direction in the platforms except at Bank where there is a reversing headshunt in the tunnel beyond the station. Many peak-hour trains on the Lewisham route from Stratford turn back at Canary Wharf. During service disruption or planned engineering work, trains can also turn back at {{DLR stations |station=Crossharbour}} and {{DLR stations |station=Mudchute}}. Trains serve every station on the route, but trains from Bank to Lewisham do not call at West India Quay because they are routed along the diveunder track to avoid junction conflicts. During long-term works for extension projects, other routes may be operated at weekends, such as Beckton to Lewisham if the Bank branch is closed.

Stations

{{Main|List of Docklands Light Railway stations}}

Most stations are elevated, with others at street level, in cutting or underground. Access to the platforms is mostly by staircase and lift, with escalators at some stations. From the outset the system has been fully accessible to wheelchairs; much attention was paid to quick and effective accessibility for all passengers.[50] The stations have high platforms matching the floor height of the cars, allowing level access for passengers with wheelchairs or pushchairs.

Most stations are of a modular design dating back to the initial system, extended and improved with two side platforms, each with separate access from the street, and platform canopies, although few examples remain of the original, distinctive rounded roof design. Stations are unstaffed, except the underground stations at {{LUL stations|station=Bank}}, {{DLR stations |station=Island Gardens}}, {{DLR stations |station=Cutty Sark}}, Stratford International and Woolwich Arsenal for safety reasons, a few of the busier interchange stations, and City Airport, which has a ticket office for passengers unfamiliar with the system. Canning Town, Custom House and Prince Regent are normally staffed on the platform whenever there is a significant exhibition at the ExCeL exhibition centre.

On 3 July 2007, DLR officially launched[51] an art programme called DLR Art,[52] similar to that on the London Underground, Art on the Underground. Alan Williams was appointed to produce the first temporary commission, called "Sidetrack", which portrays the ordinary and extraordinary sights, often unfamiliar to passengers, on the system and was displayed throughout the network.[53]

Fares and ticketing

The system is part of the London fare zone system, and Travelcards that cover the appropriate zones are valid. There are one-day and season DLR-only "Rover" tickets, plus a one-day DLR "Rail and River Rover" ticket for the DLR and City Cruises river boats. Oyster pay-as-you-go is also available;[54] or NFC enabled bank card holders (contactless) passengers need to touch both in and out on the platform readers or pass through the automatic gates. Tickets can be purchased from ticket machines at the entrance to the platforms, and are required before entering the platform. There are no ticket barriers at DLR-only stations,[55] and correct ticketing is enforced by random on-train inspections by the PSA. Passengers without a correct ticket, pay-as-you-go Oyster users or a contactless bank card who have failed to touch in at the start of the journey may be liable to a £80 penalty fare or prosecution for fare evasion. There are barriers at Bank, {{LUL stations|station=Canning Town}}, Woolwich Arsenal, West Ham and {{LUL stations|station=Stratford}}, where the DLR platforms are within a London Underground or National Rail barrier line.

Performance

Within a year of launch, annual passenger numbers were 17 million.[66] This increased to 64 million in 2009,[56][57] to more than 80 million in 2011,[58] and most recently to 110.2 million annual passengers in Fiscal Year 2014.[59] While the first five years were plagued by unreliability and operational problems,[60] the system has now become highly reliable.[60] In 2008, 87% of the population of North Woolwich were in favour of the DLR.[61]

The Parliamentary Transport Select Committee has reviewed light rail.[62] Due to the success of the DLR, proposals for similar systems elsewhere have emerged. The North and West London Light Railway is a plan for an orbital railway serving the other side of London.[63]

The DLR has been successful, as have other recent light rail systems.[64] However, the DLR has been criticised for having been designed with insufficient capacity to meet the demand that quickly arose.[28] The level of demand was underestimated.[22][25] In 1989 such criticism was aimed at GEC, a major contractor for construction.

Until 1 July 2013, the only bicycles that were allowed were folding ones.[65] DLR stated that this is because if evacuation is required, they would slow down the process. DLR cars, especially older rolling stock, were not designed with bicycles in mind – if they were allowed, they might obstruct doors and emergency exits.[66] As of January 2014 full-size bicycles are now carried on DLR at off-peak hours and weekends (except Bank Station, where bicycles are not permitted for safety reasons).[67]

Rolling stock

{{Main|Docklands Light Railway rolling stock}}

The DLR is operated by 145[68] high-floor bi-directional single-articulated Electric Multiple Units (EMUs). Each car has four doors on each side, and two or three cars make up a train.[3] There are no cabs because normal operations are automated, and a small driver's console is concealed behind a locked panel at each end, from which the PSA can drive the car.[69] Consoles at each door opening allow the PSA to control door closure and make announcements whilst patrolling the train. With the absence of a driver's position, the fully glazed car ends provide a forward and rear view for passengers. The top speed is {{convert|100|km/h|mph|order=flip}}.

Despite having high floors and being automated, the cars are derived from a German light-rail design intended for street running. All cars look similar but there have been several different types, some still in service, others sold to other operators. B2007 units were purchased from Bombardier in 2005 and delivered between 2007 and 2010.[70]

Future rolling stock

In 2017, TfL opened bidding for new trains to run on the DLR. It will order 43 new trains, which will increase capacity by 30% when they are introduced in 2022. The contract will be awarded in 2018 and the trains will feature charging points and air-conditioning.[71]

Depots

There are operating and maintenance depots at Poplar, now secondary to the larger site at Beckton, built on the site of the Beckton Gas Works in 1996 and accessed via a spur at Gallions Reach.[72] Rolling stock is kept at both locations, which have maintenance workshops and extensive open-air carriage sidings. The Poplar depot, which is also the operating headquarters of Docklands Light Railway Ltd, Keolis Amey Docklands Ltd and the Emirates Air-Line cable car, houses diesel locomotives used for track maintenance. Poplar depot is alongside the north side of the Stratford line east of the station, and Beckton depot is to the east of the line on a long spur north-east of Gallions Reach. Beckton Depot has the only level crossing on DLR. It is an AHB type and the barriers are down unless a user wants to cross, much like Appleford but AHB styled.{{citation needed|date=June 2016}}

One of the diesel locos stabled at Poplar is 1979 GEC Traction 0-4-0, one of three built for Shotton Steelworks. Since they were used at the steelworks, one has been scrapped, one has recently been acquired by the Yorkshire Wolds Railway and the third is now at Poplar named "Kevin Keaney". Its original nickname was "Sooty" because of the amount of exhaust this old engine produced.

Signalling technology

Originally the DLR used signalling based on a fixed-block technology developed by GEC-General Signal and General Railway Signal. This was replaced in 1994 with a moving-block TBTC (Transmission Based Train Control) system developed by Alcatel, called SelTrac.[73] The SelTrac system was bought by Thales in 2007 and updates are provided by Thales Rail Signalling Solutions. The same technology is used by rapid transit systems including Vancouver's SkyTrain, Toronto's SRT, San Francisco's Municipal Railway (MUNI) and Hong Kong's MTR. The SelTrac S40 system has also been adopted by the London Underground Jubilee line and Northern line. Transmissions occur via an inductive loop cable between each train's Vehicle On-Board Controller (VOBC) and the control centre (VCC, SMC) at Beckton. If this link is broken and communication is lost between the VOBC and VCC, SMC, the train stops until it is authorised to move again. If the whole system fails the train can run in restricted manual at {{convert|12|mph|km/h}} for safety until the system is restored and communication is re-established. Emergency brakes can be applied if the train breaks the speed limit during manual control or overshoots a fixed stopping point, or if it leaves the station when the route has not been set.[3]

Developments since 2008

With the development of the eastern Docklands as part of the Thames Gateway initiative and London's staging of the 2012 Summer Olympics, several extensions and enhancements have been undertaken.[74]

Upgrading entire system to three-car trains

Capacity has been increased by upgrading for trains with three cars, each with four doors per side. The alternative of more frequent trains was rejected as the signalling changes needed would have cost no less than upgrading to longer trains and with fewer benefits.[75] The railway was built for single-car operation, and the upgrade required both strengthening viaducts to take heavier trains and lengthening many pre-extension platforms[76] which were not originally built to take three-car trains. The extra capacity was useful for the 2012 Summer Olympics, which increased the use of London's transport network.[77] The main contractor for the expansion and alteration works was Taylor Woodrow.[78]

Elverson Road, Royal Albert, Gallions Reach and Cutty Sark have not been extended for three-car trains; such extension may be impossible in some cases. Selective door operation is used, with emergency walkways in case a door fails to remain shut. {{DLR stations |station=Cutty Sark |link=true}} is underground, and both costs and the risk to nearby historic buildings prevent platform extension. The tunnel has an emergency walkway. Additional work beyond that needed to take the three-car trains was also carried out at some stations. This included replacing canopies with more substantial ones along the full platform length. A new {{DLR stations |station=South Quay |link=true}} has been built {{convert|200|m}} east of the former location as nearby curves precluded lengthening. {{DLR stations |station=Mudchute}} now has a third platform.[79]

For this upgrade DLR purchased an additional 31 cars compatible with existing rolling stock.[80] The works were originally planned as three phases: Bank-Lewisham, Poplar-Stratford, and the Beckton branch. The original £200m contract was awarded on 3 May 2007.[81] Work started in 2007 and Bank-Lewisham was originally due to be completed in 2009. However, the work programme for the first two phases was merged and the infrastructure work was completed by the end of January 2010. The Lewisham-Bank route now runs three-car trains exclusively. They started running on the Beckton branch on 9 May 2011.[82] Stratford to Lewisham and Bank to Woolwich Arsenal services sometimes operate as three-car trains; other routes will run the longer trains when demand requires it.

Stratford International extension

The extension to Stratford International, taking over the North London Line from Canning Town to Stratford, links the Docklands area with domestic high-speed services on High Speed 1. It was an important part of transport improvements for the 2012 Olympic Games, much of which were held on a site adjoining Stratford International.[83] The first contract for construction work was awarded on 10 January 2007[84] and construction started in mid-2007. Originally scheduled to open in mid-2010,[85] the line opened on 31 August 2011.[86] On 11 November 2015 the Mayor of London announced that all stations on this line would be rezoned from zone 3 to zone 2/3.[87]

Station names in bold are former North London Line stations.

New stations are:

  • {{LUL stations|station=Canning Town}}
  • {{DLR stations |station=Star Lane}}
  • {{LUL stations|station=West Ham}}
  • {{DLR stations |station=Abbey Road}}
  • {{DLR stations |station=Stratford High Street}} (on the site of {{Stnlnk|Stratford Market}} railway station)
  • {{LUL stations|station=Stratford}}
  • Stratford International

From Canning Town to Stratford the extension runs parallel to the Jubilee line of the London Underground. As well as providing interchange with the adjacent Jubilee line stations, there are additional DLR stations at Star Lane, Abbey Road and Stratford High Street.

At Stratford new platforms have been built for the North London Line at the northern end of the station. The old platforms (formerly 1 and 2) adjacent to the Jubilee line have been rebuilt for the DLR, renumbered 16 (towards Stratford International) and 17 (towards Beckton/Woolwich Arsenal). Interchange between the Stratford International branch and DLR trains via Poplar is possible although the platforms are widely separated and at different levels. There is no physical connection between the two branches. As part of the Transport & Works Act (TWA) application, Royal Victoria on the Beckton branch has been be extended to accommodate three-car trains, with a siding to enable trains to reverse there, using land released by the closure of the parallel North London Line. A partly grade-separated junction has been built south of Canning Town to prevent conflicting movements between the Bank branch and the Stratford International branch to and from the Beckton and Woolwich Arsenal branches.

Relocation of Pudding Mill Lane station

One of the tunnel portals for Crossrail is on the original site of Pudding Mill Lane station. As a consequence, work was carried out to divert the DLR between City Mill River and the River Lea on to a new viaduct further south. This included a replacement station, which opened on 28 April 2014.[88][89] The former station stood on the only significant section of single track on the system, between Bow Church and Stratford,[90] though the opportunity was taken to double the track in three stages, to improve capacity. There was originally no provision for works beyond the realigned section in the Crossrail Act.

Proposed developments

Dagenham Dock extension

{{Main|Docklands Light Railway extension to Dagenham Dock}}

Status – Not currently being developed

This proposed extension from {{DLR stations |station=Gallions Reach}} to {{Stnlnk|Dagenham Dock}} via the riverside at Barking would connect the Barking Reach area, a formerly industrial area now due to be a major redevelopment as part of the London Riverside, with Docklands.[91] It would cover major developments at Creekmouth, Barking Riverside, Dagenham Dock Opportunity Area, and five stations are planned, at Beckton Riverside, Creekmouth, Barking Riverside, Goresbrook (formerly Dagenham Vale) and Dagenham Dock. The extension is key if English Partnerships' plan is to work. As shown in DLR's first consultation leaflet,[92] there are proposals to extend further, possibly to {{LUL stations|station=Dagenham Heathway}} or Rainham, or even to the other side of the Thames, including one or two new stations at Thamesmead, and then on to Abbey Wood, for North Kent Line services to Dartford and The Medway Towns, as well as Crossrail connections.[93]

Construction was not expected to start until 2013, and the earliest expected completion date was 2017.[94] However, the financial downturn meant that TfL requested a delay to the public enquiry while funding was clarified.[95] Given that the purpose of the extension was to serve as-yet unbuilt homes, it became very difficult to predict timescales for this project. The project has been reported to have been cancelled by the Mayor of London Boris Johnson as a cost-cutting measure,[96][97] although there have been calls for this to be reconsidered,[98][99] the extension being regarded by Barking and Dagenham council as essential to regenerating the area.[100]

In October 2009, the plan had seemed to be once again under consideration. The Mayor's Transport Strategy stated that the Mayor, through Transport for London, would investigate the feasibility of the extension to Dagenham Dock as part of the housing proposals for Barking Riverside.[101]

Thames Wharf station

{{Main|Thames Wharf DLR station}}

Status – On hold

Thames Wharf has been the planned name for two separate DLR stations. In 1994 the proposed location was between {{LUL stations|station=Canning Town}} and {{DLR stations |station=Royal Victoria}}.[102] Subsequently, the name was transferred to a potential future development on the London City Airport extension between {{LUL stations|station=Canning Town}} and {{DLR stations |station=West Silvertown}}, due west of the western end of Royal Victoria Dock. Since the station's intended purpose is to serve the surrounding area (currently a mix of brownfield and run-down industrial sites) when it is regenerated, the development is indefinitely on hold due to the area being safeguarded for the Silvertown Tunnel,[103] a new Thames river crossing that has been proposed but currently has no timetable for implementation.

Connaught Road/Silvertown Interchange station

Status – Proposed

A site near to London City Airport has been identified as a possible additional station on the London City Airport branch. The Connaught Tunnel is here, and will be used again when some of the former Custom House to North Woolwich section of the Eastern Counties and Thames Junction Railway is taken over by Crossrail.[104] However, no plans have emerged as to if or when a station might be built here, even though the original extension was designed to allow this. It may be located south of the Connaught Crossing.[105]

Victoria/Charing Cross extensions

Status – Proposed – 2006

In February 2006 a proposal to extend the DLR to {{LUL stations|station=Charing Cross|link=true}} from {{LUL stations|station=Bank}} DLR branch was revealed.[90] The idea, originating from a DLR "Horizon Study",[106] is at a very early stage at the moment, but would involve extending the line from Bank in bored tunnels under Central London to the Charing Cross Jubilee line platforms, which would be brought back to public use. These platforms are now on a spur off the current Jubilee line and are not used by passenger trains. It has since been revealed that a proposed route as far as {{LUL stations|station=Victoria|link=true}} will be investigated.[107]{{Better source|date=June 2018}}

While not confirmed, it is probable that the Charing Cross scheme would use the overrun tunnels between Charing Cross Jubilee platforms and slightly west of {{LUL stations|station=Aldwych}}. These tunnels were intended to be incorporated into the abandoned Phase 2 of the Fleet Line (Phase 1 became the original Jubilee line, prior to the Jubilee line Extension).[108] However they would need enlargement because DLR gauge is larger than tube gauge and current safety regulations would require an emergency walkway in the tunnel.{{Citation needed|date=June 2013}}

Two reasons driving the proposal are capacity problems at Bank, having just one interchange between the DLR and the central portion of Underground, and the difficult journeys faced by passengers from Kent and South Coast between their rail termini and the DLR. Intermediate stations would be at City Thameslink/Ludgate Circus and Aldwych, which was intended for future connection with the proposed but now abandoned Cross River Tram.

Euston/St Pancras extension

Status – Proposed

In 2011, strategy documents proposed a DLR extension to {{Stnlnk|Euston}} and {{Stnlnk|St Pancras}}.[109] Transport for London have considered driving a line from {{stnlnk|City Thameslink}} via {{LUL stations|station=Holborn}} north to the rail termini.[110][111][112] The main benefit of such an extension would be to broaden the available direct transport links to the Canary Wharf site. It would create a new artery in central London and help relieve the Northern and Circle lines and provide another metro line to serve the High Speed line into Euston.

Lewisham to Catford/Lewisham to Beckenham Junction extension

Status – Proposed – 2006

This possible extension was considered during the latest Horizon Study. The route would follow the Southeastern line and terminate between {{Stnlnk|Catford}} and {{Stnlnk|Catford Bridge}} stations. It has been seen as attractive to the district, as has the current terminus at Lewisham, built in an earlier extension.[113][114] A map published in 2010 by Transport for London suggests that a further extension from Catford to {{stnlnk|Forest Hill}} has also been considered.[110]

However, early plans showed problems due to {{DLR stations |station=Lewisham |link=true}} being only marginally lower than the busy A20 road, which impedes any extension. The plan is however being revised.[115] When the Lewisham extension was first completed there were proposals to continue further to Beckenham to link it up with the Tramlink system. However, the way in which Lewisham station was built impedes this possible extension and it would prove costly to redevelop.{{Citation needed|date=February 2011}}

Lewisham to Bromley North extension

Status – Proposed – 2012

Another proposal is to {{stnlnk|Bromley North}} by taking over the Bromley North Line, a short National Rail branch line which has no direct services into Central London. The scheme being considered by Transport for London[116] and the London Borough of Bromley[117] would convert the branch line to DLR operation. Although Lewisham Council planned to re-route the A20 road and redevelop the area south of Lewisham DLR station, the plans published in 2012 have no safeguarded route for an extension, making one unlikely.[118][119]

Gallions Reach Crossing & Thamesmead Extension

Status – Proposed

The proposed Gallions Reach Crossing has been suggested by TfL as allowing a branch to leave the existing DLR network at Gallions Reach, and cross the river on the proposed tunnel/bridge and into Thamesmead. The new branch could then pass through Thamesmead and towards Abbey Wood, Woolwich, or northwards towards Barking.[120] On 4 October 2016 the London Assembly approved the extension to Thamesmead.[121]

Replacement of Tower Gateway station with interchange at Tower Hill

Status – Proposed

A Transport Supporting Paper released by the office of the Mayor of London envisages the closure of Tower Gateway DLR station and the branch serving it, with a replacement interchange being provided via new platforms at Tower Hill Underground station. This would increase train frequencies to Bank by approximately 30%, thereby unlocking more capacity on the Bank branch.[122]{{#tag:ref|It has been proven that almost all DLR passengers heading to the city get on DLR services to Bank instead of Tower Gateway, but only 75 per cent of services head to the former.[122]|group=note}}

Accidents and incidents

Overrun of station buffers

On 10 March 1987, before the system opened, a test train crashed through buffer stops at the original high-level {{DLR stations |station=Island Gardens}} terminus and was left hanging from the end of the elevated track. The accident was caused by unauthorised tests being run before the correct installation of the wayside safety system had been verified; an omission in the wayside system allowed the train to travel too fast on the approach to the terminus. The train was being driven manually at the time.[123][124][125]

Collision at West India Quay bridge

On 22 April 1991, two trains collided at a junction on the {{DLR stations |station=West India Quay}} bridge during morning rush hour, requiring a shutdown of the system and evacuation of passengers by ladder.[126][127] One train was travelling automatically, while the other was under manual control.[128]

South Quay bombing

{{Main|1996 Docklands bombing}}

On 9 February 1996, the Provisional Irish Republican Army blew up a lorry under a bridge near {{DLR stations |station=South Quay}},[129] killing two people and injuring many others.[130] The blast caused £85 million of damage and marked an end to an IRA ceasefire in force at the time. Significant disruption was caused and a train was stranded at Island Gardens, unable to move until the track was rebuilt.

Management

DLR was a wholly owned subsidiary of London Regional Transport until 1992 when it was transferred to the London Docklands Development Corporation.

The infrastructure is owned by Docklands Light Railway Ltd,[9] part of the London Rail division of Transport for London, which also manages London Overground, London Trams, Emirates Air Line and Crossrail. The first franchise was awarded to Serco Docklands Limited[131] for seven years; operations began in April 1997.[132] A management buyout backed by Serco management later sold its shares to Serco. A two-year extension was granted in 2002.

In February 2005 Transport for London announced that Balfour Beatty/Keolis, First Carillion, RATP/Transdev and Serco had been shortlisted to operate the franchise.[133]

In November 2005 Transport for London announced that Serco had retained the franchise for seven years from May 2006.[134][135]

The Lewisham, City Airport and Woolwich Arsenal extensions were designed, financed, built and maintained by private companies (concessionnaires): City Greenwich Lewisham (CGL) Rail, City Airport Rail Enterprises (CARE), and Woolwich Arsenal Rail Enterprises (WARE).[136] In 2011, Transport Trading Limited (a subsidiary of Transport for London)[137] bought out the companies responsible for the City Airport and Woolwich Arsenal extensions, leaving only the Lewisham extension under private ownership.[138]

In July 2012 Transport for London called for expressions of interest in bidding for the next DLR franchise.[139] In January 2013 Serco's contract was extended until September 2014.[140]

In April 2013 Transport for London announced that Go-Ahead/Colas Rail, Keolis/Amey, Serco and Stagecoach had been shortlisted to bid for the next franchise.[141] However, on 30 August, just over a week before the bid submission date of 9 September 2013, Go-Ahead/Colas Rail pulled out of the running.[142] The franchise was awarded to Keolis/Amey with a handover date of 7 December 2014.[143]

In media

The DLR appears in the video to Sean Paul and Clean Bandit's single "Rockabye". Poplar, Canary Wharf and Heron Quays stations appear, interspersed with scenes of New York in winter, in the official video for the single "Trains and Winter Rains" by Enya, released in 2008.

Woolwich Arsenal plays an underground station in Athens in Jason Bourne.[144]

The DLR also appears in the 2007 film 28 Weeks Later.

See also

{{Portal|London transport}}
  • List of Docklands Light Railway stations
  • List of tram and light rail transit systems
  • Rail transport in the United Kingdom
  • Transport in London (overview)
  • Crossings of the River Thames
  • Tunnels underneath the River Thames

Notes

1. ^{{cite web|title=Light Rail and Tram Statistics: England 2017/18|url=https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/720315/light-rail-and-tram-statistics-england-2018.pdf|publisher=Department for Transport|accessdate=23 September 2018|df=dmy-all}}
2. ^{{cite web|title=TfL transparency|url=https://tfl.gov.uk/corporate/transparency/freedom-of-information/foi-request-detail?referenceId=FOI-2110-1718|publisher=Department for Transport|accessdate=30 November 2018|df=dmy-all}}
3. ^{{cite web |url=http://www.railway-technology.com/projects/docklands/ |title=Docklands Light Railway Capacity Upgrading, United Kingdom |website=Railway-Technology.com |date= |accessdate=13 June 2014 |deadurl=no |archiveurl=https://web.archive.org/web/20180615163255/https://www.railway-technology.com/projects/docklands/ |archivedate=15 June 2018 |df=dmy-all }}
4. ^{{Cite news |last=Cross |first=David |date=1 September 1987 |title=Enthusiasts flock to busy opening day: Docklands Light Railway |newspaper=The Times |location= London}}
5. ^{{cite news |url=http://www.dailymail.co.uk/news/article-1347012/Boris-Johnson-Ill-use-driverless-Tube-trains-break-strikes.html |first=James |last=Chapman |title=Boris Johnson: I'll use driverless Tube trains to break strikes |newspaper=Daily Mail |location=London |date=14 January 2011 |deadurl=no |archiveurl=https://archive.today/20120731105607/http://www.dailymail.co.uk/news/article-1347012/Boris-Johnson-Ill-use-driverless-Tube-trains-break-strikes.html |archivedate=31 July 2012 |df=dmy-all }}
6. ^{{cite web |url=http://data.companieshouse.gov.uk/doc/company/00242246 |title=URI |website=Data.companieshouse.gov.uk |date=2011-10-13 |accessdate=2016-11-17 |deadurl=no |archiveurl=https://web.archive.org/web/20160415224809/http://data.companieshouse.gov.uk/doc/company/00242246 |archivedate=15 April 2016 |df=dmy-all }}
7. ^{{cite web|url=http://www.tfl.gov.uk/corporate/modesoftransport/dlr/1532.aspx#page-link-agreement-with-serco |title=Archived copy |accessdate=2012-10-01 |deadurl=yes |archiveurl=https://web.archive.org/web/20120930183042/http://www.tfl.gov.uk/corporate/modesoftransport/dlr/1532.aspx |archivedate=30 September 2012 |df=dmy }}
8. ^Serco Limited Annual Accounts 31 December 2011
9. ^{{cite web |url=http://data.companieshouse.gov.uk/doc/company/02052677 |title=URI |website=Data.companieshouse.gov.uk |date=2011-10-13 |accessdate=2016-11-17 |deadurl=no |archiveurl=https://web.archive.org/web/20170331175917/http://data.companieshouse.gov.uk/doc/company/02052677 |archivedate=31 March 2017 |df=dmy-all }}
10. ^{{cite web|title=Light Rail and Tram Statistics: England 2016/17|url=https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/623366/light-rail-tram-ending-march-2017.pdf|publisher=Department for Transport|accessdate=30 June 2017|deadurl=no|archiveurl=https://web.archive.org/web/20170709131401/https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/623366/light-rail-tram-ending-march-2017.pdf|archivedate=9 July 2017|df=dmy-all}}
11. ^{{cite web|url=http://www.bardaglea.org.uk/docklands/9-the-end.html |title=The closure of the docks: The end of the upstream docks |publisher=Barking & Dagenham Council |accessdate=24 June 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20080917134945/http://www.bardaglea.org.uk/docklands/9-the-end.html |archivedate=17 September 2008 }}
12. ^{{cite book|last=Christopher|first=John|title=The London & Blackwall Railway|url=https://books.google.com/books?id=Wg2oAwAAQBAJ|date=30 September 2013|publisher=Amberley Publishing Limited|isbn=978-1-4456-2187-6|page=63}}
13. ^{{Cite book|title=Docklands Light Railway Official Handbook|last2=Hardy|first2=Brian|last3=Stannard|first3=Colin|date=November 2000|publisher=Capital Transport Publishing|isbn=978-185414-223-8|location=Harrow Weald|pages=4–5|last1=Pearce|first1=Alan}}
14. ^Pearce, Hardy & Stannard, Docklands Light Railway Official Handbook (2000), p. 6
15. ^Pearce, Hardy & Stannard, Docklands Light Railway Official Handbook (2000), p. 7
16. ^{{cite web |url=http://www.20thcenturylondon.org.uk/server.php?show=conInformationRecord.27 |title=Docklands Light Railway (D.L.R.) |publisher=Exploring 20th Century London |accessdate=3 September 2009 |deadurl=no |archiveurl=https://www.webcitation.org/68ZMSGS08?url=http://www.20thcenturylondon.org.uk/docklands-light-railway-d-l-r |archivedate=20 June 2012 |df=dmy-all }}
17. ^Ford, Roger. "Opening of the Docklands Light Railway". Modern Railways (London). September 1987.{{page needed|date=March 2012}}
18. ^{{cite web|title=Technology: Signalling & Control |publisher=Transport for London |url=http://www.tfl.gov.uk/corporate/modesoftransport/dlr/keyfacts/1546.aspx |accessdate=29 August 2007 |deadurl=yes |archiveurl=https://web.archive.org/web/20070930165625/http://www.tfl.gov.uk/corporate/modesoftransport/dlr/keyfacts/1546.aspx |archivedate=30 September 2007 |df= }}
19. ^{{cite web|url=http://www.bbc.co.uk/dna/h2g2/A9948757|title=The Docklands Light Railway, London, UK|publisher=BBC – h2g2|accessdate=29 August 2007|deadurl=no|archiveurl=https://www.webcitation.org/68ZMTPpVS?url=http://www.h2g2.com/approved_entry/A9948757|archivedate=20 June 2012|df=dmy-all}}
20. ^{{cite book|title=Railways of Britain – London North of the Thames|last2=McCarthy|first2=David|publisher=Ian Allan Publishing|year=2009|isbn=978-0-7110-3346-7|location=Hersham, Surrey|page=12|last1=McCarthy|first1=Colin}}
21. ^{{cite web|url=http://www.london.gov.uk/mayor/transport/dlr.jsp|title=Mayor of London – Transport Strategy – DLR|year=c. 2006|publisher=Greater London Authority|accessdate=19 March 2012|deadurl=yes|archiveurl=https://web.archive.org/web/20080312115619/http://www.london.gov.uk/mayor/transport/dlr.jsp|archivedate=12 March 2008}}
22. ^{{cite web|url=http://www.london2012.com/blog/2009/01/13/new-games-transport-link-marks-20-years-of-dlr-progress.php |title=New Games transport link marks 20 years of progress |publisher=London 2012 Official Blog |date=13 January 2009 |accessdate=24 June 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20090528013329/http://london2012.com/blog/2009/01/13/new-games-transport-link-marks-20-years-of-dlr-progress.php |archivedate=28 May 2009 }}
23. ^{{cite web |url=http://hansard.millbanksystems.com/written_answers/1987/may/06/docklands-light-railway#S6CV0115P0_19870506_CWA_30 |title=Hansard Written Answers |publisher=UK Parliament |date=6 May 1987 |deadurl=no |archiveurl=https://www.webcitation.org/68ZMVObxK?url=http://hansard.millbanksystems.com/written_answers/1987/may/06/docklands-light-railway#S6CV0115P0_19870506_CWA_30 |archivedate=20 June 2012 |df=dmy-all }}
24. ^{{Cite news |url=http://www.cnplus.co.uk/news/16feb90-uk-ben-roskrow-reports-on-nuttalls-extension-of-the-docklands-light-railway-(1-of-2)/1689334.article |title=Ben Roskrow reports on Nuttal's extension of the Docklands Light Railway |newspaper=Construction News |date=16 February 1990 |accessdate=25 June 2009 |deadurl=no |archiveurl=https://web.archive.org/web/20100928121337/http://www.cnplus.co.uk/news/16feb90-uk-ben-roskrow-reports-on-nuttalls-extension-of-the-docklands-light-railway-(1-of-2)/1689334.article |archivedate=28 September 2010 |df=dmy-all }}
25. ^{{cite web|url=http://www.tfl.gov.uk/corporate/modesoftransport/dlr/history/2982.aspx |title=DLR history timeline |publisher=Transport for London |accessdate=3 September 2007 |deadurl=yes |archiveurl=https://web.archive.org/web/20070930190323/http://www.tfl.gov.uk/corporate/modesoftransport/dlr/history/2982.aspx |archivedate=30 September 2007 }}
26. ^{{cite web |url=http://www.lddc-history.org.uk/transport/3tran15.jpg |title=Options for the DLR Beckton Extension route |publisher=London Docklands Development Corporation |accessdate=23 February 2008 |deadurl=no |archiveurl=https://www.webcitation.org/68ZMVrcoO?url=http://www.lddc-history.org.uk/transport/3tran15.jpg |archivedate=20 June 2012 |df=dmy-all }}
27. ^{{Cite news |url=https://www.independent.co.uk/arts-entertainment/art/news/architecture-a-driverless-train-a-blighted-destination-a-railway-deep-into-londons-docklands-emphasises-the-potential-yet-to-be-realised-in-the-east-says-gillian-widdicombe-1432567.html |title=Architecture: A driverless train, a blighted destination |newspaper=The Independent |accessdate=24 June 2009 |location=London |first=Gillian |last=Widdicombe |date=30 March 1994 |deadurl=no |archiveurl=https://web.archive.org/web/20120118214052/http://www.independent.co.uk/arts-entertainment/art/news/architecture-a-driverless-train-a-blighted-destination-a-railway-deep-into-londons-docklands-emphasises-the-potential-yet-to-be-realised-in-the-east-says-gillian-widdicombe-1432567.html |archivedate=18 January 2012 |df=dmy-all }}
28. ^{{Cite news |url=https://www.independent.co.uk/life-style/crucial-links-hold-key-to-the-future--docklands-a-special-report-1569645.html |first=Christian |last=Wolmar |title=Crucial links hold key to the future: Docklands, a special report |newspaper=The Independent |accessdate=24 June 2009 |location=London |date=25 January 1995 |deadurl=no |archiveurl=https://web.archive.org/web/20120126144438/http://www.independent.co.uk/life-style/crucial-links-hold-key-to-the-future--docklands-a-special-report-1569645.html |archivedate=26 January 2012 |df=dmy-all }}
29. ^{{Cite news |url=http://www.nce.co.uk/prescott-backs-dlr-airport-extension/844052.article |title=Prescott backs DLR airport extension |newspaper=New Civil Engineer |accessdate=25 June 2009 |deadurl=no |archiveurl=https://web.archive.org/web/20111002145100/http://www.nce.co.uk/prescott-backs-dlr-airport-extension/844052.article |archivedate=2 October 2011 |df=dmy-all }}
30. ^{{Cite press release |url=http://www.highbeam.com/doc/1G1-53908044.html |title=DLR: Take off for airport link |publisher=M2 Presswire| date = 18 February 1999 |accessdate=25 June 2009}}{{dead link|date=February 2019|bot=medic}}{{cbignore|bot=medic}}
31. ^{{Cite news |url=http://www.theboltonnews.co.uk/news/344110.credit_crunch_shows_signs_of_easing |title=Getting Back on the Right Track (letter to the editor) |first=Judy |last=De Haan |newspaper=The Bolton News |date=29 August 2000 |accessdate=25 June 2009 |deadurl=no |archiveurl=https://www.webcitation.org/68ZMWgijr?url=http://www.theboltonnews.co.uk/news/344110.credit_crunch_shows_signs_of_easing |archivedate=20 June 2012 |df=dmy-all }}
32. ^{{Cite news|url=http://www.highbeam.com/Search?searchTerm=DLR+helps+Mowlem+ride+high+at+%5Bpound%5D25+million.(Statistical+Data+Included)&searchType=Article¤tPage=0&orderBy=|title=DLR helps Mowlem ride high at £25 million|last=Withers|first=Malcolm|date=8 March 2001|newspaper=London Evening Standard|accessdate=25 June 2009|deadurl=no|archive-url=https://web.archive.org/web/20121025214828/http://www.highbeam.com/Search?searchTerm=DLR+helps+Mowlem+ride+high+at+%5bpound%5d25+million.(Statistical+Data+Included)&searchType=Article¤tPage=0&orderBy=|archivedate=25 October 2012|df=dmy-all}}
33. ^{{Cite news|url=https://www.theguardian.com/uk/2004/oct/12/transport.london|title=Mayor unveils £10bn scheme for capital's transport|last=Muir|first=Hugh|date=12 October 2004|newspaper=The Guardian|location=London|accessdate=28 June 2009|deadurl=no|archiveurl=https://web.archive.org/web/20130828083628/http://www.theguardian.com/uk/2004/oct/12/transport.london|archivedate=28 August 2013|df=dmy-all}}
34. ^{{Cite news |url= http://www.timesonline.co.uk/tol/travel/business/article749409.ece |title=Docklands Light Railway reaches City airport |newspaper=The Times |accessdate=25 June 2009 |location=London |date=6 December 2005 |first1=Fiona |last1=Hamilton |first2=Sam |last2=Coates |first3=Michael |last3=Savage}}
35. ^{{Cite news |url=http://news.bbc.co.uk/1/hi/england/london/3489298.stm |title=New DLR extension wins approval |work=BBC News |accessdate=24 June 2009 |date=26 February 2004 |deadurl=no |archiveurl=https://web.archive.org/web/20060216013429/http://news.bbc.co.uk/1/hi/england/london/3489298.stm |archivedate=16 February 2006 |df=dmy-all }}
36. ^{{Cite news |url= https://www.forbes.com/feeds/afx/2005/06/01/afx2068185.html |title=AMEC, RBoS jv finalise contract for DLR extension to Woolwich Arsenal |work=Forbes |location =New York |accessdate=24 June 2009 |date=6 January 2005}}
37. ^{{Cite press release|url=http://pressroom.dlr.co.uk/news/details.asp?id=141 |title=Tunnel extending Docklands Light Railway to Woolwich completed |date=23 July 2007 |publisher=Transport for London |accessdate=29 June 2008 |deadurl=yes |archiveurl=https://web.archive.org/web/20070928011206/http://pressroom.dlr.co.uk/news/details.asp?id=141 |archivedate=28 September 2007 |df= }}
38. ^{{Cite press release|url=http://www.tfl.gov.uk/static/corporate/media/newscentre/archive/10970.html |title=Mayor unveils DLR Woolwich Arsenal station |publisher=Transport for London |date=12 January 2009 |accessdate=19 March 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120425184416/http://www.tfl.gov.uk/static/corporate/media/newscentre/archive/10970.html |archivedate=25 April 2012 |df= }}
39. ^{{Cite news |url=http://www.cnplus.co.uk/sectors/transport/dlr-extension-award/5203213.article |title=DLR extension award |work=Construction News |date=10 June 2009 |accessdate=24 June 2009 |deadurl=no |archiveurl=https://web.archive.org/web/20111003092342/http://www.cnplus.co.uk/sectors/transport/dlr-extension-award/5203213.article |archivedate=3 October 2011 |df=dmy-all }}
40. ^{{cite web|url=http://improvements.dlr.co.uk/project_updates/towergateway.asp |title=Tower Gateway Station – Now Open |publisher=Transport for London |accessdate=21 June 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20090702022120/http://improvements.dlr.co.uk/project_updates/towergateway.asp |archivedate=2 July 2009 |df= }}
41. ^{{Cite news |location=Ilford |url=http://www.eastlondonadvertiser.co.uk/content/towerhamlets/advertiser/news/story.aspx?brand=elaonline&category=news&tBrand=northlondon24&tCategory=newsela&itemid=WeED02%20Mar%202009%2008%3A51%3A29%3A073 |title=DLR Terminal suddenly reopens: Taking passengers by surprise |newspaper=East London Advertiser |accessdate=21 June 2009 |deadurl=no |archiveurl=https://web.archive.org/web/20090305010509/http://www.eastlondonadvertiser.co.uk/content/towerhamlets/advertiser/news/story.aspx?brand=ELAOnline&category=news&tBrand=northlondon24&tCategory=newsela&itemid=WeED02%20Mar%202009%2008%3A51%3A29%3A073 |archivedate=5 March 2009 |df=dmy-all }}
42. ^Christopher (2013), p. 68
43. ^{{cite web |url=http://developments.dlr.co.uk/pdf/enhancements/phase2/delta.pdf |title=Docklands Light Railway (DLR) Delta Junction Grade Separation |publisher=Transport for London |accessdate=21 June 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20071003191051/http://developments.dlr.co.uk/pdf/enhancements/phase2/delta.pdf |archivedate=3 October 2007 |df=dmy-all }}
44. ^{{cite web|url=http://developments.dlr.co.uk/enhancements/capacity/wiqpoplar.asp |title=Docklands Light Railway – West India Quay/Poplar Junction Improvements |publisher=Transport for London |accessdate=1 August 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20090627085203/http://developments.dlr.co.uk/enhancements/capacity/wiqpoplar.asp |archivedate=27 June 2009 |df= }}
45. ^{{Cite web|url=https://tfl.gov.uk/info-for/media/press-releases/2015/august/increased-services-for-docklands-light-railway-routes|title=Increased services for Docklands Light Railway routes|last=|first=|date=24 August 2015|website=Transport for London|access-date=|deadurl=no|archiveurl=https://web.archive.org/web/20160629223044/https://tfl.gov.uk/info-for/media/press-releases/2015/august/increased-services-for-docklands-light-railway-routes|archivedate=29 June 2016|df=dmy-all}}
46. ^{{cite web |url=http://www.tfl.gov.uk/corporate/about-tfl/culture-and-heritage/londons-transport-a-history/dlr |title=About TfL - Culture & heritage - London's transport - a history - Docklands Light Railway (DLR) |publisher=Transport for London |accessdate=13 June 2014 |deadurl=no |archiveurl=https://web.archive.org/web/20140615201803/http://www.tfl.gov.uk/corporate/about-tfl/culture-and-heritage/londons-transport-a-history/dlr |archivedate=15 June 2014 |df=dmy-all }}
47. ^{{cite web |publisher= Official London Guide |url= http://www.visitlondon.com/travel/getting_around/docklands-light-railway |title= Docklands Light Railway |accessdate= 19 March 2012 |deadurl= no |archiveurl= https://web.archive.org/web/20120223063455/http://www.visitlondon.com/travel/getting_around/docklands-light-railway |archivedate= 23 February 2012 |df= dmy-all }}
48. ^{{cite news|title=OSI List|date=October 2014|url=http://www.oyster-rail.org.uk/osi-list/|work=oyster-rail.org.uk|accessdate=14 April 2015|deadurl=no|archiveurl=https://web.archive.org/web/20150320010931/http://www.oyster-rail.org.uk/osi-list|archivedate=20 March 2015|df=dmy-all}}
49. ^{{cite web |publisher= Transport for London |url= http://content.tfl.gov.uk/dlr-franchise-agreement-schedule-01-appendix-1.pdf |title= Docklands Light Railway Franchise Agreement: Appendix A |deadurl= no |archiveurl= https://web.archive.org/web/20151126050031/http://content.tfl.gov.uk/dlr-franchise-agreement-schedule-01-appendix-1.pdf |archivedate= 26 November 2015 |df= dmy-all }}
50. ^{{cite web |url=http://www.tfl.gov.uk/gettingaround/transportaccessibility/2986.aspx |title=DLR was the first fully accessible railway in the UK, making access much easier for everyone |publisher=Transport for London |accessdate=4 March 2012 |deadurl=no |archiveurl=https://www.webcitation.org/68ZMfpuDO?url=http://www.tfl.gov.uk/gettingaround/transportaccessibility/2986.aspx |archivedate=20 June 2012 |df=dmy-all }}
51. ^{{cite press release|publisher=Transport for London |date=3 July 2007 |url=http://www.tfl.gov.uk/static/corporate/media/newscentre/archive/5426.html |title=Docklands Light Railway draws up public arts strategy |accessdate=4 March 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120425190215/http://www.tfl.gov.uk/static/corporate/media/newscentre/archive/5426.html |archivedate=25 April 2012 |df= }}
52. ^{{cite web |url=http://www.dlrart.co.uk/ |title=The DLR Public Arts Programme |publisher=DLR Art |accessdate=5 August 2010 |deadurl=no |archiveurl=https://www.webcitation.org/68ZMgHHAG?url=http://www.dlrart.co.uk/home/ |archivedate=20 June 2012 |df=dmy-all }}
53. ^{{cite web|url=http://www.dlrart.co.uk/projects/view.asp?id=8|title=Alan Williams – Sidetrack|publisher=Docklands Light Railway|accessdate=25 June 2009|deadurl=no|archiveurl=https://web.archive.org/web/20090829061702/http://www.dlrart.co.uk/projects/view.asp?id=8|archivedate=29 August 2009|df=dmy-all}}
54. ^{{cite web|url=http://www.studentjetpacks.com/jetpacks_london_oystercard.asp|title=London jetpack: London Oyster travelcard|publisher=studentjetpacks.com|accessdate=21 June 2009|deadurl=yes|archiveurl=https://www.webcitation.org/68ZMh8z52?url=http://www.studentjetpacks.com/jetpacks_london_oystercard.asp|archivedate=20 June 2012|df=dmy-all}}
55. ^{{Cite news |title=Tube errors may cost you dear |newspaper=The Times |date=5 January 2004 |location=London |first1=Ben |last1=Webster |first2=Andrew |last2=Clennell}}
56. ^{{cite web|url=http://www.tfl.gov.uk/corporate/modesoftransport/dlr/1536.aspx |title=Docklands Light Railway performance |publisher=Transport for London |accessdate=19 March 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120123081840/http://www.tfl.gov.uk/corporate/modesoftransport/dlr/1536.aspx |archivedate=23 January 2012 }}
57. ^{{Cite press release|url=http://www.tfl.gov.uk/static/corporate/media/newscentre/archive/4825.html |title=Docklands Light Railway carries 60 million passengers |date=4 April 2007 |publisher=Transport for London |accessdate=4 March 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120425183407/http://www.tfl.gov.uk/static/corporate/media/newscentre/archive/4825.html |archivedate=25 April 2012 }}
58. ^{{cite web |url=http://www.flagshipconsulting.co.uk/media-centre/client-news/dlr-now-carries-more-than-10-times-the-population-of-london-per-year/ |title=Client News - DLR now carries more than 10 times the population of London per year |publisher=Flagship Consulting |date=21 June 2012 |accessdate=28 June 2014 |deadurl=no |archiveurl=https://web.archive.org/web/20140407072554/http://www.flagshipconsulting.co.uk/media-centre/client-news/dlr-now-carries-more-than-10-times-the-population-of-london-per-year/ |archivedate=7 April 2014 |df=dmy-all }}
59. ^{{cite web |url=https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/433286/light-rail-and-tram-statistics-2014-15.pdf |title=Light Rail and Tram Statistics: England 2014/2015 |publisher=Department for Transport |page=2 |date=9 June 2014 |accessdate=14 September 2015 |deadurl=no |archiveurl=https://web.archive.org/web/20150612182410/https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/433286/light-rail-and-tram-statistics-2014-15.pdf |archivedate=12 June 2015 |df=dmy-all }}
60. ^{{cite web |url=http://www.lddc-history.org.uk/transport/tranmon2.html#DLRResolving |title=DLR: resolving the problems |publisher=London Docklands Development Corporation |accessdate=11 July 2008 |deadurl=yes |archiveurl=https://www.webcitation.org/67IDQSwPP?url=http://www.lddc-history.org.uk/transport/tranmon2.html#DLRResolving |archivedate=29 April 2012 |df=dmy-all }}
61. ^{{cite web|url=http://www.lcacc.org/access/north-woolwich-research-report.pdf |title=North Woolwich Research: Changes, 2006–2008 – The influence of Docklands Light Railway |date=July 2008 |publisher=Social Research Associates |accessdate=26 June 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20110716220654/http://www.lcacc.org/access/north-woolwich-research-report.pdf |archivedate=16 July 2011 |df= }}
62. ^{{cite web |url=https://publications.parliament.uk/pa/cm200405/cmselect/cmtran/378/37805.htm |title=Horses for Courses: The Advantages of Light Rail |publisher=UK Parliament |work=Commons Transport Select Committee |date=3 April 2005 |deadurl=no |archiveurl=https://www.webcitation.org/68ZMivO2i?url=http://www.publications.parliament.uk/pa/cm200405/cmselect/cmtran/378/37805.htm |archivedate=20 June 2012 |df=dmy-all }}
63. ^{{Cite news|last=Flintoff |first=John-Paul |url=http://timesonline.typepad.com/environment/2009/09/orbital-rail-the-solution-to-city-congestion.html |title=Orbital rail the solution to city congestion? |newspaper=The Times (Environment blog) |location=London |date=17 September 2009 |accessdate=16 December 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20090925161043/http://timesonline.typepad.com/environment/2009/09/orbital-rail-the-solution-to-city-congestion.html |archivedate=25 September 2009 }}
64. ^{{Cite news|url=http://www.railway-technology.com/features/feature1953/|title=Light Rail – the Solution to Inner-City Chaos?|date=22 May 2008|website=Railway-Technology.com|accessdate=19 March 2012|deadurl=no|archiveurl=https://web.archive.org/web/20120229165634/http://www.railway-technology.com/features/feature1953/|archivedate=29 February 2012|df=dmy-all}}
65. ^{{cite web|url=http://www.tfl.gov.uk/roadusers/cycling/11701.aspx |title=Bikes on public transport |publisher=Transport for London |accessdate=27 January 2013 |deadurl=yes |archiveurl=https://web.archive.org/web/20130527140218/http://www.tfl.gov.uk/roadusers/cycling/11701.aspx |archivedate=27 May 2013 |df= }}
66. ^{{Cite news |first=Valerie |last=Low |url=http://www.thisislondon.co.uk/events/article-23407230-last-one-in-the-water-is-toast.do |title=Last one in the water is toast |newspaper=London Evening Standard |date=6 August 2007 |accessdate=27 January 2013 |archiveurl=https://web.archive.org/web/20110606081807/http://www.thisislondon.co.uk/events/article-23407230-last-one-in-the-water-is-toast.do |archivedate=6 June 2011}}
67. ^{{cite web |author=ibikelondon |url=http://ibikelondon.blogspot.co.uk/2014/01/good-news-from-today-you-can-take-your.html |title=i b i k e l o n d o n: Good news! From today you can take your bike on the Docklands Light Railway |website=Ibikelondon.blogspot.co.uk |date=2014-01-18 |accessdate=2016-11-17 |deadurl=no |archiveurl=https://web.archive.org/web/20161018224749/http://ibikelondon.blogspot.co.uk/2014/01/good-news-from-today-you-can-take-your.html |archivedate=18 October 2016 |df=dmy-all }}
68. ^{{cite web |url=http://www.tfl.gov.uk/corporate/about-tfl/what-we-do/docklands-light-railway |title=About TfL - What we do - Docklands Light Railway |publisher=Transport for London (TfL) |date= |accessdate=13 June 2014 |deadurl=no |archiveurl=https://web.archive.org/web/20140604174334/http://www.tfl.gov.uk/corporate/about-tfl/what-we-do/docklands-light-railway |archivedate=4 June 2014 |df=dmy-all }}
69. ^{{Cite news |url=http://londonist.com/2007/11/unmanned_train.php |title=Unmanned Train: DLR Respond |newspaper=The Londonist (blog) |date=2 November 2007 |accessdate=19 March 2012 |deadurl=no |archiveurl=https://web.archive.org/web/20120222004250/http://londonist.com/2007/11/unmanned_train.php |archivedate=22 February 2012 |df=dmy-all }}
70. ^{{Cite press release |url=http://bombardier.com/en/corporate/media-centre/press-releases/details?docID=0901260d8000fc2d |title=Bombardier receives a $94 million US order from Docklands Light Railway for automatic Light Rail cars to be used in London, UK |publisher=Bombardier |date=4 May 2005 |location=Montreal |accessdate=14 July 2009 |deadurl=no |archiveurl=https://web.archive.org/web/20090821135659/http://bombardier.com/en/corporate/media-centre/press-releases/details?docID=0901260d8000fc2d |archivedate=21 August 2009 |df=dmy-all }}
71. ^{{cite web |url=http://www.railtechnologymagazine.com/Rail-News/tfl-opens-bidding-for-43-new-dlr-trains |title=TfL opens bidding for 43 new DLR trains |deadurl=no |archiveurl=https://web.archive.org/web/20171201035438/http://www.railtechnologymagazine.com/Rail-News/tfl-opens-bidding-for-43-new-dlr-trains |archivedate=1 December 2017 |df=dmy-all }}
72. ^Christopher (2013), p. 67
73. ^{{Cite book |last1=Pearce |first1=Alan |last2=Hardy |first2=Brian |last3=Stannard |first3=Colin |title=Docklands Light Railway Official Handbook |publisher=Capital Transport Publishing |location=Harrow Weald |date=November 2000 |page=66 |isbn=978-185414-223-8 }}
74. ^{{cite web|url=http://developments.dlr.co.uk/index.asp |title=Docklands Light Railway – Development Projects |publisher=Transport for London |accessdate=9 July 2008 |deadurl=yes |archiveurl=https://web.archive.org/web/20080705084414/http://developments.dlr.co.uk/index.asp |archivedate=5 July 2008 |df= }}
75. ^{{cite web|url=http://developments.dlr.co.uk/enhancements/capacity/index.asp |title=Docklands Light Railway – Three-carriage Capacity Enhancement Project |publisher=Transport for London |accessdate=9 July 2008 |deadurl=yes |archiveurl=https://web.archive.org/web/20080803062955/http://developments.dlr.co.uk/enhancements/capacity/index.asp |archivedate=3 August 2008 |df= }}
76. ^{{Cite news |url=http://news.bbc.co.uk/1/hi/england/london/6924214.stm |title=Longer trains for Docklands Line |work=BBC News |accessdate=24 June 2009 |date=31 July 2007}}
77. ^{{cite web|url=https://www.arup.com/projects/docklands-light-rail |title=Docklands Light Railway (DLR) 3 Car Enhancements Project |publisher=Arup |accessdate=24 June 2009 }}{{dead link|date=May 2017 |bot=InternetArchiveBot |fix-attempted=yes }}
78. ^{{Cite news|url=http://www.contractjournal.com/Articles/2007/05/03/54774/taylor-woodrow-wins-200m-docklands-light-railway-project.html |title=Taylor Woodrow wins £200m Docklands Light Railway project |date=3 May 2007 |work=Contract Journal |accessdate=24 June 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20160117052125/http://www.contractjournal.com/Articles/2007/05/03/54774/taylor-woodrow-wins-200m-docklands-light-railway-project.html |archivedate=17 January 2016 |df= }}
79. ^{{cite web|url=http://londonconnections.blogspot.com/2008/04/mudchute-third-platform.html |title=Mudchute third platform |date=11 April 2008 |publisher=London Connections |accessdate=29 June 2008 |deadurl=yes |archiveurl=https://web.archive.org/web/20110708051923/http://londonconnections.blogspot.com/2008/04/mudchute-third-platform.html |archivedate=8 July 2011 }}
80. ^{{Cite news|url=http://findarticles.com/p/articles/mi_m0BQQ/is_7_46/ai_n26701780/ |archive-url=https://archive.today/20120712232246/http://findarticles.com/p/articles/mi_m0BQQ/is_7_46/ai_n26701780/ |dead-url=yes |archive-date=2012-07-12 |title=Olympic rail gets a head start |work=International Railway Journal |accessdate=12 March 2012 |author=Barrow, Keith |date=July 2006 }}
81. ^{{Cite press release|url=http://developments.dlr.co.uk/NewsDetail.aspx?newsid=1138 |title=Extra carriage on every DLR train |date=3 May 2007 |publisher=Transport for London |accessdate=10 June 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20110927185707/http://developments.dlr.co.uk/NewsDetail.aspx?newsid=1138 |archivedate=27 September 2011 |df= }}
82. ^{{cite press release |url= http://www.tfl.gov.uk/corporate/media/newscentre/19961.aspx |publisher= Transport for London |title= Docklands Light Railway ready for 2012 Games with three-car upgrade completed |date= 10 May 2011 |deadurl= no |archiveurl= https://web.archive.org/web/20110513075914/http://www.tfl.gov.uk/corporate/media/newscentre/19961.aspx |archivedate= 13 May 2011 |df= dmy-all }}
83. ^{{cite press release|title=£20m bullet trains to serve Olympic Park|date=28 September 2004|publisher=London2012.org|url=http://www.london2012.org/news/archive/bid-phase/20m-bullet-trains-to-serve-olympic-park.php|accessdate=6 July 2005|deadurl=no|archiveurl=https://www.webcitation.org/6GEHkuh8g?url=http://www.london2012.com/|archivedate=29 April 2013|df=dmy-all}}
84. ^{{cite web|url=http://developments.dlr.co.uk/ProjectUpdatesDetail.aspx?updateid=1053 |title=Major contract award signals start of work on DLR Stratford International Extension |date=10 January 2007 |publisher=Transport for London |accessdate=19 March 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120322021610/http://developments.dlr.co.uk/ProjectUpdatesDetail.aspx?updateid=1053 |archivedate=22 March 2012 |df= }}
85. ^{{Cite press release|url=http://developments.dlr.co.uk/ProjectUpdatesDetail.aspx?updateid=1049 |date=25 October 2006 |title=Government gives green light to key 2012 rail link |publisher=Transport for London |accessdate=8 August 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20110914070903/http://developments.dlr.co.uk/ProjectUpdatesDetail.aspx?updateid=1049 |archivedate=14 September 2011 |df= }}
86. ^{{cite news|url=https://www.bbc.co.uk/news/uk-england-london-14727813|title=New £211m DLR extension connecting Olympic venues opens|date=31 August 2011|work=BBC News|deadurl=no|archiveurl=https://web.archive.org/web/20110901173549/http://www.bbc.co.uk/news/uk-england-london-14727813|archivedate=1 September 2011|df=dmy-all}}
87. ^{{cite web|url=http://www.london.gov.uk/media/mayor-press-releases/2015/11/mayor-announces-real-terms-fares-freeze-and-extends-free-travel |title=Mayor announces real terms fares freeze | London City Hall |website=London.gov.uk |date= 2015-11-11|accessdate=2016-11-17}}
88. ^{{cite web|url = http://www.tfl.gov.uk/info-for/media/press-releases/2014/april/new-dlr-station-opens-at-pudding-mill-lane|title = New DLR station opens at Pudding Mill Lane|date = 28 April 2014|publisher = Transport for London|accessdate = 20 April 2015|deadurl = no|archiveurl = https://web.archive.org/web/20150427102931/http://www.tfl.gov.uk/info-for/media/press-releases/2014/april/new-dlr-station-opens-at-pudding-mill-lane|archivedate = 27 April 2015|df = dmy-all}}
89. ^{{cite news |url= http://londonist.com/2011/07/pudding-mill-lane-station-to-be-rebuilt.php |title= Pudding Mill Lane Station To Be Rebuilt |work= Londonist |date= 28 July 2011 |accessdate= 13 August 2011 |deadurl= no |archiveurl= https://web.archive.org/web/20110812075353/http://londonist.com/2011/07/pudding-mill-lane-station-to-be-rebuilt.php |archivedate= 12 August 2011 |df= dmy-all }}
90. ^{{cite news |work=Modern Railways |date=March 2006 |title=DLR aims for Charing Cross |author=Abbott, James |location =London |page=54}}
91. ^Docklands Light Railway – Dagenham Dock: Key Project Milestones {{webarchive |url=https://web.archive.org/web/20090615075056/http://developments.dlr.co.uk/extensions/dagenham/whatnext.asp |date=15 June 2009 }} Transport for London
92. ^{{cite web |url= http://developments.dlr.co.uk/pdf/extensions/dagenham/dagenham_consultation_leaflet2.pdf |title=Proposals for a DLR Dagenham Dock Extension |publisher=Transport for London |accessdate=19 March 2012 |archiveurl= https://web.archive.org/web/20071201220109/http://developments.dlr.co.uk/pdf/extensions/dagenham/dagenham_consultation_leaflet2.pdf |archivedate=1 December 2007}}
93. ^DLR Dagenham Dock extension preferred alignment{{dead link|date=December 2016 |bot=InternetArchiveBot |fix-attempted=yes }}. Transport for London. February 2008.
94. ^{{cite web|url=http://www.tfl.gov.uk/assets/downloads/corporate/Agenda-08-02-06.pdf |title=TfL Board meeting papers February 2008 |accessdate=13 February 2008 |deadurl=yes |archiveurl=https://web.archive.org/web/20080227111455/http://www.tfl.gov.uk/assets/downloads/corporate/Agenda-08-02-06.pdf |archivedate=27 February 2008 |df= }}
95. ^{{Cite news |url=http://news.bbc.co.uk/1/hi/england/london/7688635.stm |title='Threat to homes' as DLR on hold |work=BBC News |accessdate=24 June 2009 |date=24 October 2008 |deadurl=no |archiveurl=https://web.archive.org/web/20081028081553/http://news.bbc.co.uk/1/hi/england/london/7688635.stm |archivedate=28 October 2008 |df=dmy-all }}
96. ^{{Cite news |url=http://news.bbc.co.uk/1/hi/england/london/7712002.stm |title=TfL scraps projects and cuts jobs |work=BBC News |accessdate=24 June 2009 |date=6 November 2008 |deadurl=no |archiveurl=https://web.archive.org/web/20090307160326/http://news.bbc.co.uk/1/hi/england/london/7712002.stm |archivedate=7 March 2009 |df=dmy-all }}
97. ^{{Cite news |url= http://www.bdpost.co.uk/news/go_ahead_for_our_new_future_1_574583 |title= Go-ahead for our new future |newspaper= Barking and Dagenham Post |date= 22 June 2009 |deadurl= no |archiveurl= https://web.archive.org/web/20110719071340/http://www.bdpost.co.uk/news/go_ahead_for_our_new_future_1_574583 |archivedate= 19 July 2011 |df= dmy-all }}
98. ^{{Cite news |url=http://www.thisislondon.co.uk/standard/article-23706295-details/Dagenham+prison+plan+under+attack/article.do |title=Dagenham prison plan under attack |newspaper=London Evening Standard |accessdate=24 June 2009 |deadurl=yes |archiveurl=https://www.webcitation.org/68ZMrNSoc?url=http://www.standard.co.uk/news/dagenham-prison-plan-under-attack-6721765.html |archivedate=20 June 2012 |df=dmy-all }}
99. ^{{Cite news |url=http://www.bbc.co.uk/london/content/articles/2008/10/20/barking_dlr_feature.shtml |title=Doubts over future DLR extension |work=BBC News |date=20 October 2008 |accessdate=26 June 2009 |deadurl=no |archiveurl=https://www.webcitation.org/68ZMtaJGJ?url=http://www.bbc.co.uk/london/content/articles/2008/10/20/barking_dlr_feature.shtml |archivedate=20 June 2012 |df=dmy-all }}
100. ^{{Cite news |url=https://www.theguardian.com/society/2006/mar/22/communities.guardiansocietysupplement |title=Home truths |newspaper=The Guardian |accessdate=28 June 2009 |location=London |first=Peter |last=Hetherington |date=22 March 2006 |deadurl=no |archiveurl=https://web.archive.org/web/20140921203654/http://www.theguardian.com/society/2006/mar/22/communities.guardiansocietysupplement |archivedate=21 September 2014 |df=dmy-all }}
101. ^{{cite web|url=http://mts.tfl.gov.uk/documents/MTS09-Chapter-5-Proposals.aspx |title=Mayor's Transport Strategy, Chapter five—transport proposals |publisher=Transport for London |accessdate=21 October 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20091017032016/http://mts.tfl.gov.uk/documents/MTS09-Chapter-5-Proposals.aspx |archivedate=17 October 2009 |df= }}
102. ^Mr Beck's Underground map, Garland, K. p 63
103. ^{{Cite news |url=http://developments.dlr.co.uk/pdf/factsheets/lcy_ext.pdf |title=London City Airport Extension |date=10 November 2006 |publisher=Docklands Light Railway |accessdate=24 June 2009 }}{{dead link|date=September 2017 |bot=InternetArchiveBot |fix-attempted=yes }}
104. ^{{Cite news |url=https://www.bbc.co.uk/news/uk-england-london-13210232 |title=Crossrail brings old tunnel back to life |work=BBC News |accessdate=27 April 2011 |date=27 April 2011 |deadurl=no |archiveurl=https://web.archive.org/web/20110430110855/http://www.bbc.co.uk/news/uk-england-london-13210232 |archivedate=30 April 2011 |df=dmy-all }}
105. ^{{cite web|url=http://www.alwaystouchout.com/project/9 |title=DLR to City Airport |publisher=AlwaysTouchOut.com |accessdate=9 July 2008 |deadurl=yes |archiveurl=https://web.archive.org/web/20130514105841/http://www.alwaystouchout.com/project/9 |archivedate=14 May 2013 |df=dmy }}
106. ^{{cite web|title=Bank-Aldwych-Charing Cross (E2)|url=http://www.whatdotheyknow.com/request/18439/response/46991/attach/4/Report%20Horizon%202020%20Final%20Issue.pdf|work=DLR Horizon 2020 Study: Business Case Appraisal|publisher=Docklands Light Railway Ltd.|accessdate=19 October 2012|author=Ove Arup & Partners Ltd.|page=34|date=July 2005|deadurl=no|archiveurl=https://web.archive.org/web/20111108214018/http://www.whatdotheyknow.com/request/18439/response/46991/attach/4/Report%20Horizon%202020%20Final%20Issue.pdf|archivedate=8 November 2011|df=dmy-all}}
107. ^{{cite web|url=http://districtdave.proboards39.com/index.cgi?board=dlr&action=display&thread=9383|title=DLR Victoria extension – official|date=23 October 2008|publisher=District Dave's London Underground Site|accessdate=10 January 2009|deadurl=yes|archiveurl=https://web.archive.org/web/20090216150506/http://districtdave.proboards39.com/index.cgi?board=dlr&action=display&thread=9383|archivedate=16 February 2009|df=dmy-all}}
108. ^Clive Feather, Clive's UndergrounD Line Guides (CLUG), Jubilee Line, A Modern Tube {{webarchive|url=https://www.webcitation.org/68ZMPY9NT?url=http://www.davros.org/rail/culg/jubilee.html |date=20 June 2012 }}. Retrieved 26 June 2008.
109. ^{{cite web |url=http://londonist.com/2011/05/tfl-moots-new-dlr-routes-including-victoria-and-st-pancras.php |title=TfL Moots New DLR Routes, Including Victoria And St Pancras |publisher=Londonist |date=2011-05-03 |accessdate=2016-11-17 |deadurl=no |archiveurl=https://web.archive.org/web/20140707231325/http://londonist.com/2011/05/tfl-moots-new-dlr-routes-including-victoria-and-st-pancras.php |archivedate=7 July 2014 |df=dmy-all }}
110. ^{{cite web|title=Potential DLR extensions |url=http://developments.dlr.co.uk/uploadedFiles/Development_Projects/The_future_of_DLR/Where_we_go_Next/DLRextVicEustonStP.pdf |publisher=Transport for London |accessdate=28 January 2013 |date=21 September 2010 |deadurl=yes |archiveurl=https://web.archive.org/web/20120322021527/http://developments.dlr.co.uk/uploadedFiles/Development_Projects/The_future_of_DLR/Where_we_go_Next/DLRextVicEustonStP.pdf |archivedate=22 March 2012 |df=dmy }}
111. ^{{cite web |url=https://www.camden.gov.uk/ccm/cms-service/download/asset/;jsessionid=FA49BDE46B5ED8C29C561EE8511FC7B2?asset_id=2794916 |title=Archived copy |accessdate=2017-12-11 |deadurl=yes |archiveurl=https://web.archive.org/web/20171212084203/https://www.camden.gov.uk/ccm/cms-service/download/asset/;jsessionid=FA49BDE46B5ED8C29C561EE8511FC7B2?asset_id=2794916 |archivedate=12 December 2017 |df=dmy-all }}
112. ^{{cite web |url=http://democracy.cityoflondon.gov.uk/Data/Policy%20and%20Resources%20Committee/20110721/Agenda/$16%20-%20High%20Speed%202.doc.pdf |title=Archived copy |accessdate=2017-12-11 |deadurl=no |archiveurl=https://web.archive.org/web/20171211213622/http://democracy.cityoflondon.gov.uk/Data/Policy%20and%20Resources%20Committee/20110721/Agenda/%2416%20-%20High%20Speed%202.doc.pdf |archivedate=11 December 2017 |df=dmy-all }}
113. ^{{Cite news |url=https://www.telegraph.co.uk/property/propertyadvice/propertymarket/3303494/One-long-picnic-it-certainly-aint.html |title=One long picnic, it certainly ain't |date=19 June 2002 |newspaper=The Daily Telegraph |accessdate=24 June 2009 |location=London |first=Roger |last=Wilkes |deadurl=no |archiveurl=https://web.archive.org/web/20121111233631/http://www.telegraph.co.uk/property/propertyadvice/propertymarket/3303494/One-long-picnic-it-certainly-aint.html |archivedate=11 November 2012 |df=dmy-all }}
114. ^{{Cite news |url=http://business.highbeam.com/410604/article-1G1-116283467/dlr-takes-off |title=DLR takes off |date=6 May 2004 |work=Contract Journal |accessdate=24 June 2009 |deadurl=no |archiveurl=https://archive.today/20120709053121/http://business.highbeam.com/410604/article-1G1-116283467/dlr-takes-off |archivedate=9 July 2012 |df=dmy-all }}
115. ^{{cite web |url= http://www.alwaystouchout.com/project/129 |title= DLR to Catford |date= 27 October 2007 |publisher= Always Touch Out |accessdate= 9 July 2008 |deadurl= no |archiveurl= https://web.archive.org/web/20080513060822/http://www.alwaystouchout.com/project/129 |archivedate= 13 May 2008 |df= dmy-all }}
116. ^{{cite news|title=Could the DLR or Bakerloo line be coming to Bromley?|url=http://www.thisislocallondon.co.uk/news/9487309.Could_the_DLR_or_Bakerloo_line_be_coming_to_Bromley_/|accessdate=26 January 2013|newspaper=This is Local London|date=23 January 2012|deadurl=no|archiveurl=https://web.archive.org/web/20160304052933/http://www.thisislocallondon.co.uk/news/9487309.Could_the_DLR_or_Bakerloo_line_be_coming_to_Bromley_/|archivedate=4 March 2016|df=dmy-all}}
117. ^{{cite web|title=Future Rail and Tram Links to Bromley|url=http://cds.bromley.gov.uk/documents/s12298/ENV%20PDS%20180112%20Future%20Rail%20and%20Tram%20Link.pdf|work=Report No. ES12004|publisher=London Borough of Bromley|accessdate=26 January 2013|date=18 January 2012|deadurl=no|archiveurl=https://web.archive.org/web/20130604211854/http://cds.bromley.gov.uk/documents/s12298/ENV%20PDS%20180112%20Future%20Rail%20and%20Tram%20Link.pdf|archivedate=4 June 2013|df=dmy-all}}
118. ^{{cite web|title=Masterplan |url=http://newlewisham.com/masterplan.html |work=Lewisham Gateway: Phase A Consultation |publisher=Lewisham Council |accessdate=27 January 2013 |date=December 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20130521234130/http://newlewisham.com/masterplan.html |archivedate=21 May 2013 |df= }}
119. ^{{cite web|title=The Past and Future of the Bromley North Branch|url=http://www.londonreconnections.com/2013/the-past-and-future-of-the-bromley-north-branch/|work=London Reconnections|accessdate=26 January 2013|deadurl=no|archiveurl=https://web.archive.org/web/20130128103307/http://www.londonreconnections.com/2013/the-past-and-future-of-the-bromley-north-branch/|archivedate=28 January 2013|df=dmy-all|date=2013-01-25}}
120. ^{{cite web |url=https://consultations.tfl.gov.uk/rivercrossings/east-of-silvertown?cid=east-london-crossings |title=Have your say on new river crossings in east and southeast London |website=Transport for London |deadurl=no |archiveurl=https://web.archive.org/web/20160129163940/https://consultations.tfl.gov.uk/rivercrossings/east-of-silvertown?cid=east-london-crossings |archivedate=29 January 2016 |df=dmy-all }}
121. ^{{Cite press release |url=https://www.london.gov.uk/press-releases/mayoral/mayor-commits-to-east-london-crossings |title=Mayor commits to building greener, public transport-focused crossings |date=4 October 2016 |publisher=Greater London Authority |access-date=2016-10-04 |deadurl=no |archiveurl=https://web.archive.org/web/20161005142028/https://www.london.gov.uk/press-releases/mayoral/mayor-commits-to-east-london-crossings |archivedate=5 October 2016 |df=dmy-all }}
122. ^{{cite web |url=https://www.london.gov.uk/sites/default/files/Transport%20Supporting%20Paper_3.pdf |title=London Infrastructure Plan 2050: Transport Supporting Paper |publisher=London City Hall |page=143 |accessdate=6 February 2018 |date= |archiveurl=https://web.archive.org/web/20180206103556/https://www.london.gov.uk/sites/default/files/Transport%20Supporting%20Paper_3.pdf |archivedate=6 February 2018 |deadurl=no}}
123. ^London Docklands Light Railway; Northern Line's Dot-Matrix Indicators {{webarchive|url=https://web.archive.org/web/20070824045251/http://catless.ncl.ac.uk/Risks/5.29.html |date=24 August 2007 }} RISKS Digest Volume 5 Issue 29 Article 3, 13 August 1987
124. ^Report on the Docklands Light Railway Accident Which Occurred at Island Gardens Station on 10 March 1987, Modern Railways (London), May 1987.{{page needed|date=July 2012}}
125. ^"'Unauthorised Tests' Caused DLR Crash", Modern Railways (London), June 1987.{{page needed|date=July 2012}}
126. ^{{cite news |url=http://catless.ncl.ac.uk/Risks/11.52.html#subj1.1 |title=Another commuter train wreck in London |author=Kamens, Jonathan I. |work=RISKS Digest |volume=11 |issue=52 |date=23 April 1991 |deadurl=no |archiveurl=https://web.archive.org/web/20070726094556/http://catless.ncl.ac.uk/Risks/11.52.html#subj1.1 |archivedate=26 July 2007 |df=dmy-all }}
127. ^{{cite news |title=Computer-controlled commuter trains collide in east London |agency=UPI |date=22 April 1991}}
128. ^{{cite news |url=http://catless.ncl.ac.uk/Risks/11.54.html#subj10.1 |title=Trains collide in east London |author=Batten, Ian G. |work=RISKS Digest |volume=11 |issue=54 |date=25 April 1991 |deadurl=no |archiveurl=https://web.archive.org/web/20070922052353/http://catless.ncl.ac.uk/Risks/11.54.html#subj10.1 |archivedate=22 September 2007 |df=dmy-all }}
129. ^{{Cite news|url=http://www.nydailynews.com/archives/news/1996/02/10/1996-02-10_blast_shatters_london__adams.html |title=Blast shatters London, Adams Presumes IRA's Responsible |first1=Ellen |last1=Tumposky |first2=Don |last2=Gentile |newspaper=New York Daily News |date=10 February 1996 |accessdate=12 November 2008 |deadurl=yes |archiveurl=https://web.archive.org/web/20090912002136/http://www.nydailynews.com/archives/news/1996/02/10/1996-02-10_blast_shatters_london__adams.html |archivedate=12 September 2009 |df=dmy }}
130. ^{{Cite news |url=http://news.bbc.co.uk/onthisday/hi/dates/stories/february/10/newsid_2539000/2539265.stm |work=BBC News |title=Docklands bomb ends IRA ceasefire |date=10 February 1996 |accessdate=2 January 2010 |deadurl=no |archiveurl=https://www.webcitation.org/67IDWP8Mn?url=http://news.bbc.co.uk/onthisday/hi/dates/stories/february/10/newsid_2539000/2539265.stm |archivedate=29 April 2012 |df=dmy-all }}
131. ^{{cite web |url=http://data.companieshouse.gov.uk/doc/company/03145194 |title=URI |website=Data.companieshouse.gov.uk |date=2011-10-13 |accessdate=2016-11-17 |deadurl=no |archiveurl=https://web.archive.org/web/20160813001002/http://data.companieshouse.gov.uk/doc/company/03145194 |archivedate=13 August 2016 |df=dmy-all }}
132. ^Acquisition of DRML Shares {{webarchive |url=https://web.archive.org/web/20130313144228/http://www.serco.com/media/pressreleases/archive/1997/008_1997.asp |date=13 March 2013 }} Serco
133. ^{{cite press release|url=http://developments.dlr.co.uk/NewsDetail.aspx?newsid=1115 |title=Four Pre-Qualify for DLR Franchise |publisher=Transport for London |date=15 February 2005 |deadurl=yes |archiveurl=https://web.archive.org/web/20131113151928/http://developments.dlr.co.uk/NewsDetail.aspx?newsid=1115 |archivedate=13 November 2013 |df= }}
134. ^{{cite press release|title=Serco appointed preferred bidder for £400m Docklands Light Rail service |date=22 November 2005 |publisher=Serco |url=http://www.serco.com/media/market/transport/DLR.asp |deadurl=yes |archiveurl=https://web.archive.org/web/20130313144233/http://serco.com/media/market/transport/DLR.asp |archivedate=13 March 2013 |df= }}
135. ^{{cite press release|url=http://developments.dlr.co.uk/NewsDetail.aspx?newsid=1122 |title=DLR awards new franchise to Serco |publisher=Transport for London |date=8 March 2006 |deadurl=yes |archiveurl=https://web.archive.org/web/20131113151931/http://developments.dlr.co.uk/NewsDetail.aspx?newsid=1122 |archivedate=13 November 2013 |df= }}
136. ^{{cite web |url= http://www.tfl.gov.uk/corporate/modesoftransport/dlr/1532.aspx |title= DLR management |publisher= Transport for London |accessdate= 10 June 2011 |deadurl= no |archiveurl= https://web.archive.org/web/20120930183042/http://www.tfl.gov.uk/corporate/modesoftransport/dlr/1532.aspx |archivedate= 30 September 2012 |df= dmy-all }}
137. ^TfL Subsidiary Company Structure {{webarchive |url=https://web.archive.org/web/20121013221842/http://www.tfl.gov.uk/assets/downloads/corporate/tfl-subsidiary-organisation.pdf |date=13 October 2012 }}. Transport for London.
138. ^"TfL expects £250m saving from buying Docklands Light Railway PFI concessionaires". {{webarchive|url=https://web.archive.org/web/20150924144511/http://www.railwaygazette.com/news/single-view/view/tfl-expects-pound250m-saving-from-buying-docklands-light-railway-pfi-concessionaries.html |date=24 September 2015 }} Railway Gazette (London). 6 December 2011.
139. ^Docklands Light Rail franchise contract. OJEU tender 13 July 2012.
140. ^{{cite press release |url=http://www.tfl.gov.uk/corporate/media/newscentre/26710.aspx |title=DLR operating contract extended until September 2014 |date=7 January 2013 |publisher=Transport for London |accessdate=7 January 2013 |deadurl=no |archiveurl=https://web.archive.org/web/20130117170025/http://www.tfl.gov.uk/corporate/media/newscentre/26710.aspx |archivedate=17 January 2013 |df=dmy-all }}
141. ^{{cite press release |url= http://www.tfl.gov.uk/corporate/media/newscentre/27761.aspx |title= DLR announces short list of bidders for new franchise |publisher= Transport for London |date=17 April 2013}}
142. ^{{cite news |last=Thomas |first=Natalie |title=Go-Ahead forced to pull out of DLR contest |url=https://www.telegraph.co.uk/finance/newsbysector/transport/10278358/Go-Ahead-forced-to-pull-out-of-DLR-contest.html |newspaper=The Daily Telegraph |location=London |date=31 August 2013 |deadurl=no |archiveurl=https://web.archive.org/web/20150925030313/http://www.telegraph.co.uk/finance/newsbysector/transport/10278358/Go-Ahead-forced-to-pull-out-of-DLR-contest.html |archivedate=25 September 2015 |df=dmy-all }}
143. ^[https://www.bbc.com/news/business-28157128 "French firm wins 7-year Docklands Light Rail franchise".] {{webarchive|url=https://web.archive.org/web/20150924040401/http://www.bbc.com/news/business-28157128 |date=24 September 2015 }} BBC News. 4 July 2014.
144. ^{{cite web|title=It's all Greek to me! Commuters' surprise when their trip to Woolwich train station takes them to Athens instead... after signs are changed for Jason Bourne movie|url=http://www.dailymail.co.uk/travel/travel_news/article-3504221/It-s-Greek-Commuters-surprise-trip-Woolwich-train-station-takes-Athens-instead-signs-changed-Jason-Bourne-movie.html|accessdate=15 January 2017|deadurl=no|archiveurl=https://web.archive.org/web/20170118132455/http://www.dailymail.co.uk/travel/travel_news/article-3504221/It-s-Greek-Commuters-surprise-trip-Woolwich-train-station-takes-Athens-instead-signs-changed-Jason-Bourne-movie.html|archivedate=18 January 2017|df=dmy-all}}

References

{{Reflist|30em}}

Bibliography

{{Refbegin}}
  • {{Cite book|last1=Jolly|first1=Stephen |last2=Bayman |first2=Bob|title=Docklands Light Railway Official Handbook|publisher=Capital Transport Publishing|location=Harrow Weald|date=November 1986|isbn=978-0-904711-80-6}}
  • {{Cite journal |last1=Gonsalves|first1=B.F. |last2=Deacon |first2=R.W. |last3=Pilgrim |first3=D |last4=Pritchard |first4=B.P. |title=Docklands Light Railway and Subsequent Upgrading |publisher=Proceedings of the Institution of Civil Engineers |date= October 1991 |volume=90 |oclc= 24833359}}
{{Refend}}

External links

{{Spoken Wikipedia|Docklands_Light_Railway.ogg|24 February 2007}}{{Commons category|Docklands Light Railway}}{{Attached KML|display=title,inline}}
  • {{Official website|http://www.dlrlondon.co.uk|Official website}}
West: Crossings of the River ThamesEast:
Jubilee line
between {{LUL stations|station=Canada Water}}
and {{LUL stations|station=Canary Wharf}}
Lewisham branch,
between Island Gardens
and Cutty Sark
Greenwich Foot Tunnel
Woolwich foot tunnelWoolwich branch,
between King George V
and Woolwich Arsenal
Dartford Cable Tunnel
{{Keolis}}{{Docklands Light Railway}}{{UK light rail}}{{Britishmetros}}{{Transport in London}}{{International Metro Organizations}}

16 : Airport rail links in London|Automated guideway transit|Docklands Light Railway|Keolis|Railway lines opened in 1987|Serco Group|Standard gauge railways in London|Transport in the Royal Borough of Greenwich|Transport in the London Borough of Lewisham|Transport in the London Borough of Newham|Transport in the London Borough of Tower Hamlets|Tunnels underneath the River Thames|Urban people mover systems|1987 establishments in England|Articles containing video clips|750 V DC railway electrification

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/20 5:05:11