词条 | Eisenhower Tunnel |
释义 |
| name = Eisenhower–Johnson Memorial Tunnel | image = Eisenhower tunnel.svg | image_size = 250px | caption = Eisenhower Tunnel | route = {{jct|state=CO|I|70}} | crosses = Continental Divide | location = Approx. {{convert|60|mi|-1}} west of Denver, Colorado | operator = Colorado Department of Transportation | character = Twin-bore tunnel | length = {{convert|1.693|mi|2|abbr=on}} westbound {{convert|1.697|mi|2|abbr=on}} eastbound | width = {{convert|40|ft|1|abbr=on}} each | height = {{convert|13.92|ft|abbr=on}} | vpd = 32,260 vehicles (2007) | opened = 1973 Eisenhower (westbound) 1979 Johnson (eastbound) | coordinates = {{coord|39.6785|N|105.92|W|region:US_type:landmark|display=inline,title}} | grade = 1.64% | lowelevation = {{convert|11013|ft|abbr=on}} east portal | hielevation = {{convert|11158|ft|abbr=on}} west portal }} The Eisenhower Tunnel, officially the Eisenhower–Edwin C. Johnson Memorial Tunnel,[1] is a dual-bore, four-lane vehicular tunnel in the western United States, approximately {{convert|60|mi|km}} west of Denver, Colorado. The tunnel carries Interstate 70 (I-70) under the Continental Divide in the Rocky Mountains. With a maximum elevation of {{convert|11158|ft|m}} above sea level, it is one of the highest vehicular tunnels in the world. The tunnel is the longest mountain tunnel and highest point on the Interstate Highway System. With the completion of the second bore in 1979, it was one of the last major pieces of the Interstate system to be completed. Opened in 1973, the westbound bore is named after Dwight D. Eisenhower, the U.S. President for whom the Interstate system is also named. The eastbound bore was completed in 1979 and is named for Edwin C. Johnson, a governor and U.S. Senator who lobbied for an Interstate Highway to be built across Colorado. DescriptionThe Eisenhower bore (westbound tunnel) is {{convert|1.693|mi|km|2}} long, while the Johnson bore (eastbound tunnel) is {{convert|1.697|mi|km|2}} long. The tunnels are sloped with a 1.64% grade, with an elevation of {{convert|11013|ft|m}} at the east portal and {{convert|11158|ft|m}} at the west portal. At the time of dedication, they were the highest vehicular tunnels in the world.[1] While the Eisenhower Tunnel remains the highest vehicular tunnel in the United States, higher tunnels have since been constructed elsewhere, such as the Fenghuoshan Tunnel, a rail tunnel in China.[2] The Eisenhower tunnel is noted as the longest mountain tunnel and highest point on the Interstate Highway System.[4] The tunnel bores measure {{convert|48|by|40|ft|m}}; however, the portion accessible to the public is a rectangular shape measuring just over {{convert|16|ft|m}} tall. The rest of the bore is used for forced air ventilation and water drainage systems.[1] Height restrictionDue to additional height restrictions from variable-message signs and lighting systems, the tunnels' original posted clearance was {{convert|13|ft|6|in|m}}.[1] The trucking industry lobbied the Colorado Department of Transportation (CDOT) to increase the vertical clearance. With a 2007 retrofit that used lower-profile lighting and signs, trucks {{convert|13|ft|11|in|m}} can navigate the tunnel, an increase of {{convert|5|in|cm}} over the original limit. Sensors activate audible sirens near each entrance of the tunnel if a vehicle above the posted height attempts to enter the tunnel. Traffic signals at that entrance will turn red, stopping all traffic. The entrance will remain closed until the vehicle is removed from the freeway, sometimes causing severe delays for all traffic. CDOT noted that prior to the retrofit, about 20,000 vehicles per year tripped the alarm. The trucking industry argued that many of these trucks were under the height requirement but tripped the alarm due to their air suspensions (which can be lowered during their journey through the tunnel) or due to snow and ice atop the trailer. During this time, the trucking industry estimated the number of alarms would drop by as much as 80% if the clearance could be raised even a few inches.[3] Another feature of the retrofit monitors truck weight—a safe speed for each truck on the 7% grades and curves just outside the tunnel is calculated and displayed for each driver.[4] Alternate routeTo mitigate the dangers posed by a fire inside the tunnel, trucks hauling hazardous materials are also prohibited from using the tunnel. Prohibited trucks, bicyclists, pedestrians, and those who wish to stop and view the scenery must take the longer and steeper climb and descent of the older U.S. Highway 6 across Loveland Pass, {{convert|834|ft|m|0}} higher at {{convert|11992|ft|m|0}} above sea level. Other than the above exceptions, the tunnel has replaced the pass for general vehicular traffic. While less formidable than the older route, the approach to the tunnel on both sides is steep, and runaway truck ramps are available for truckers who lose control. During construction or winter storms that require closing Loveland Pass, there is a procedure in place to allow hazardous material trucks to use the tunnel. Once per hour, the tunnel bores will be closed to regular traffic, and the trucks will be guided through the tunnel in a convoy with escorts.[5] As of December 2009, almost 276 million vehicles have passed through the tunnel. This figure includes a significant number of visitors to Colorado's ski resorts.[6] HistoryThe idea for a tunnel under Loveland Pass existed at least since the 1950s.[7] Serious discussion began when the state of Colorado lobbied for the Interstate Highway System to route a transcontinental highway across Colorado. After a round of negotiations with Utah officials, it was decided the best option was to follow the U.S. Route 6 corridor. Engineers recommended to tunnel under the pass, rather than attempt to build a route across it that conformed to Interstate Highway standards.[12] The Eisenhower–Johnson Memorial Tunnel was known as the Straight Creek Tunnel during construction,[8] named for the waterway that runs along the western approach to the tunnel. Before the tunnel was dedicated, it was renamed to honor Dwight D. Eisenhower and Edwin C. Johnson. Construction on the first bore of the tunnel was started on March 15, 1968.[1] Construction efforts suffered many setbacks and the project went well over time and budget.[8] One of the biggest setbacks was the discovery of fault lines in the path of the tunnel that were not discovered during the pilot bores.[16] These faults began to slip during construction and emergency measures had to be taken to protect the tunnels and workers from cave-ins and collapses.[9] Despite the best efforts of engineers, three workers were killed boring the first tube, and four in boring the second.[10] Further complicating construction, the boring machines could not work as fast as expected at such high elevations; the productivity was significantly less than planned. The frustration prompted one engineer to comment, "We were going by the book, but the damned mountain couldn't read".[16] Though the project was supposed to take three years, the tunnel was not opened to traffic until March 8, 1973. Initially, the northern Eisenhower bore was used for two-way traffic, with one lane for each direction. The amount of traffic through the tunnel exceeded predictions, and efforts soon began to expedite construction on the southern bore. Construction began on the eastbound Edwin C. Johnson tunnel on August 18, 1975 and finished on December 21, 1979. The initial engineering cost estimate for the Eisenhower bore was $42 million; the actual cost was $108 million (equivalent to ${{inflation|US|108|1973}} million in {{CURRENTYEAR}}). Approximately 90% of the funds were paid by the federal government, with the state of Colorado paying the rest. At the time, this figure set a record for the most expensive federally aided project. The excavation cost for the Johnson bore was $102.8 million (equivalent to ${{inflation|US|102.8|1979}} million in {{CURRENTYEAR}}). Not included in these figures is about $50 million in non-boring expenses in the construction of both tunnels.[11][12] The tunnel construction became unintentionally involved in the women's rights movement when Janet Bonnema applied for a position as an engineering technician with the Colorado Department of Transportation. She was given an assignment on the Straight Creek Tunnels project, but her supervisor misread her resume and thought he was hiring "James". When the supervisor discovered the department had hired a woman, she was instead tasked with doing support work from the office. There was opposition to a woman entering the construction site: One supervisor stated that if she entered, "Those workers would flat walk out of that there tunnel and they'd never come back". The workers, most of whom had a mining background, expressed a common superstition that a woman brought bad luck to a mine.[13] One worker insisted, "It's a jinx. I've seen too many die after a woman was in the tunnel."[14] Bonnema sued the department for the right to work inside the tunnel. She countered she was in better shape and more agile than most of the men working on the tunnel. Emboldened by the passage of an equal rights law in Colorado, she finally entered the tunnel, with an entourage of reporters, on November 9, 1972. Some workers did walk off the job; at least one yelled, "Get those women out of here".[14] She remained determined and re-entered the tunnel a few days later. The next time she dressed in coveralls, and was even assigned tasks on the roof of the tunnel overlooking the men below. Surprised that nobody apparently noticed she was a woman, she stated, "I had a good disguise".[14] Plane crash{{Main article|Wichita State University football team plane crash}}During construction in 1970, a plane crash occurred less than 2 miles (3 km) northeast of the east portal on Friday, October 2.[15] A Martin 4-0-4 charter aircraft, one of two carrying the college football team of Wichita State University, crashed just north of the highway ({{coord|39.6935|-105.8825}}). Of the 40 passengers and crew on board, only 9 survived.[16] The team was on its way to a game with Utah State University in Logan and had recently refueled at Denver's Stapleton International Airport. The incident plane, carrying the team's starters, departed Denver and traveled a poorly planned scenic route. The other plane, carrying reserve players, followed the original route and landed safely in Logan.[17] Workers constructing the tunnel were among the first on scene at the crash site. Water diversionAs with the Moffat Tunnel, while the Eisenhower Tunnel was primarily intended as a transportation tunnel, it also serves as a water tunnel for water diversion from the western side of the Continental Divide to the eastern side. Water from the Straight Creek watershed (a tributary of the Blue River), along with all seepage entering the tunnel is discharged into Clear Creek for delivery to the Coors Brewing Company. Typically, the tunnel delivers over 300 acre-feet (370,000 m3) of water per year.[18] See also
References1. ^1 2 3 4 {{cite web |url = http://www.coloradodot.info/travel/eisenhower-tunnel/description.html |title = Eisenhower Tunnel Description |publisher = Colorado Department of Transportation |accessdate = January 16, 2010 }} 2. ^{{cite journal |url = http://www.highbeam.com/doc/1G1-95954148.html |archive-url = https://web.archive.org/web/20121025190400/http://www.highbeam.com/doc/1G1-95954148.html |dead-url = yes |archive-date = October 25, 2012 |title = China Completes World's Highest Railroad |journal = Railway Track and Structures |date = December 1, 2002 |accessdate = June 13, 2009 |via = HighBeam Research }} 3. ^{{cite news |url = http://m.rockymountainnews.com/news/2007/Nov/13/inches-to-spare-for-trucks/ |first = Kevin |last = Flynn |title = Inches to Spare for Trucks |work = Rocky Mountain News |location = Denver |date = November 13, 2007 |accessdate = January 16, 2010 |deadurl = yes |archiveurl = https://web.archive.org/web/20110715195907/http://m.rockymountainnews.com/news/2007/Nov/13/inches-to-spare-for-trucks/ |archivedate = July 15, 2011 |df = mdy }} 4. ^{{cite web |url=http://www.irdinc.com/showcase/5_safety_systems.php |publisher=International Road Dynamics |title=IRD Safety Systems: Showcase |accessdate=January 16, 2010 |deadurl=yes |archiveurl=https://web.archive.org/web/20081028114103/http://www.irdinc.com/showcase/5_safety_systems.php |archivedate=October 28, 2008 |df=mdy }} 5. ^{{cite news |url = http://www.highbeam.com/doc/1G1-67417489.html |archive-url = https://web.archive.org/web/20121102221531/http://www.highbeam.com/doc/1G1-67417489.html |dead-url = yes |archive-date = November 2, 2012 |title = Paving Project to Halt Loveland Pass Traffic: Eisenhower Tunnel Also May Be Snarled |first = Katie |last = Kerwin |work = Rocky Mountain News |location = Denver |date = July 30, 1999 |via = HighBeam Research }} 6. ^{{cite press release |url=http://www.coloradodot.info/news/news-releases/30-years-for-johnson-tunnel |archiveurl=https://web.archive.org/web/20100906192147/http://www.coloradodot.info/news/news-releases/30-years-for-johnson-tunnel |archivedate=September 6, 2010 |via=HighBeam Research |deadurl=yes |title=30 Years for Johnson Tunnel |date=December 21, 2009 |publisher=Colorado Department of Transportation |accessdate=January 16, 2010 |df= }} 7. ^{{cite news |url = https://news.google.com/newspapers?nid=897&dat=19570121&id=El5PAAAAIBAJ&sjid=wE8DAAAAIBAJ&pg=5483,885958 |newspaper = Prescott Evening Courier |agency = Associated Press |title = Long Tunnel in Colorado Wins Support |date = January 21, 1957 |page = 7 |via = Google News }} 8. ^1 {{cite news |url = https://news.google.com/newspapers?nid=2209&dat=19710714&id=6pkrAAAAIBAJ&sjid=BfkFAAAAIBAJ&pg=6909,1420038 |newspaper = Nashua Telegraph |last = Ripley |first = Anthony |title = Straight Creek Tunnel Project Hit by Soaring Costs |date = July 14, 1971 |page = 10 }} 9. ^1 {{cite book |url = http://www.coloradodot.info/programs/environmental/archaeology-and-history/highways-to-the-sky |author = Associated Cultural Resource Experts |publisher = Colorado Department of Transportation |title = Highways to the Sky: A Context and History to Colorado's Highway System |year = 2002 |accessdate = May 22, 2009 }} 10. ^https://www.codot.gov/travel/eisenhower-tunnel/eisenhower-tunnel-interesting-facts.html 11. ^1 2 {{cite web |url = http://www.coloradodot.info/travel/eisenhower-tunnel/eisenhower-memorial-bore.html |title = Eisenhower Memorial Bore |publisher = Colorado Department of Transportation |accessdate = January 20, 2010 }} 12. ^{{cite web |url = http://www.coloradodot.info/travel/eisenhower-tunnel/edwin-c-johnson-memorial-bore.html |title = Edwin C Johnson Bore |publisher = Colorado Department of Transportation |accessdate = July 25, 2009 }} 13. ^{{cite news |url = https://news.google.com/newspapers?nid=1798&dat=19721005&id=8_YeAAAAIBAJ&sjid=Io0EAAAAIBAJ&pg=4827,875160 |newspaper = Sarasota Journal |agency = United Press International |title = Superstition Bars Women from Straight Creek Mine |date = October 5, 1972 |page = 4A |via = Google News }} 14. ^1 2 3 {{cite web |url = http://www.fhwa.dot.gov/infrastructure/covefort.cfm |title = Ask the Rambler: Why Does I-70 End in Cove Fort, Utah? |publisher = Federal Highway Administration |accessdate = June 7, 2009 |last = Weingroff |first = Richard }} 15. ^{{cite news |url = https://news.google.com/newspapers?id=AronAAAAIBAJ&sjid=ckoDAAAAIBAJ&pg=7016%2C577700 |newspaper = Deseret News |location = Salt Lake City |agency = Associated Press |title = Grid Plane Crash Kills 29 En Route to Logan |date = October 3, 1970 |page = 1A |via = Google News }} 16. ^NTSB Aircraft Accident Report, SA-421, File No. 3-1127. {{webarchive|url=https://web.archive.org/web/20131009220736/http://www.airdisaster.com/reports/ntsb/AAR71-04.pdf |date=October 9, 2013 }} 17. ^{{cite news |url = https://news.google.com/newspapers?id=8psgAAAAIBAJ&sjid=GWgFAAAAIBAJ&pg=1594%2C3600204 |newspaper = Lewiston Daily Sun |agency = Associated Press |last = Hilliard |first = Carl R. |title = Plane Crash Cripples Wichita St. Grid Team |date = October 3, 1970 |page = 1 |via = Google News }} 18. ^{{Cite book |first = John N. |last = Winchester |url = http://westernriversinstitute.org/wp-content/uploads/2012/12/USCID-Transmountain-Paper-.pdf |title = A Historical View: Transmountain Development in Colorado |archive-url = https://web.archive.org/web/20150807061159/http://westernriversinstitute.org/wp-content/uploads/2012/12/USCID-Transmountain-Paper-.pdf |archive-date = August 7, 2015 |year = 2000 |access-date = July 2015 }} External links{{commons category|Eisenhower Tunnel}}
8 : Tunnels in Colorado|Interstate 70|Transportation buildings and structures in Clear Creek County, Colorado|Transportation buildings and structures in Summit County, Colorado|Tunnels completed in 1973|Tunnels completed in 1979|Road tunnels in the United States|1973 establishments in Colorado |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。