词条 | Strong Republic Transit System | ||||||||||||||||||||||||||||||||||||
释义 |
| direction = vertical | width = 242 | footer = | image1 = Srts logo.jpg | alt1 = | caption1 = Logo of the Strong Republic Transit System | image2 = SRTS map PNG.png | alt2 = | caption2 = The initial situation of the railway and rapid transit lines, mid 2003. A star indicates an interchange station. | image3 = FlashPass Card.png | alt3 = | caption3 = A sample Flash Pass Card | image4 = | alt4 = | caption4 = }} The Strong Republic Transit System was launched to integrate the various rail lines providing public transport in Manila in the Philippines. The program was initiated by former president Gloria Macapagal-Arroyo on June 14, 2003. It aimed to provide a "reliable, seamless and integrated mass transit system that would be at par with international standards" through the unification of already-existing rail infrastructure under one transit system and fare structure. The Manila Light Rail Transit System (Lines 1 and 2), the Manila Metro Rail Transit System (Line 3) and the Philippine National Railways (PNR) Northrail and Southrail lines were covered by the SRTS project.[1] The project has not been mentioned by the Benigno Aquino III and Rodrigo Duterte administrations, which currently concentrates on the extensions of Lines 1 and 2[2] and the construction of Line 7, although Duterte's administration may continue the stalled Northrail project in a reconfigured way.[3] LinksThe SRTS project provided for seven "links", i.e. interchange stations where commuters would be able to seamlessly transfer from one line to the other. When the program was initiated four links were in use. The Santa Mesa and Recto Link were added in April 2004, when the already under construction Line 2 became fully operational. The Northrail project has been cancelled in September 2012, as a result the Caloocan Link is missing. The proposed extension of Southrail services to Caloocan, which was part of SRTS, was not executed either. The closing of the loop has as of 2015 almost been completed by extending Line 1 with five new stations, unlike originally outlined by the plan. Line 1 would require one more station to connect it with Line 2. In order of operation the following links have been realized (color coding has since been changed):
Fare integrationThe project aimed to unify fare systems on the lines through the use of contactless smart cards, similar to the Octopus card in Hong Kong and the EZ-Link card in Singapore. The integrated system has not been implemented, as the project was dropped. A weekly ticket which is valid on Lines 1-3 has been introduced in 2004 though. For ₱ 250 one can make an unlimited number of rides per day on Lines 1-3 during one calendar week with the so-called Flash Pass Card. See also
References1. ^[https://web.archive.org/web/20040203065430/http://www.lrta.gov.ph/srts_project.htm The Strong Republic Transit System], www.lrta.gov.ph (web.archive.org), February 3, 2004 {{Transportation in the Philippines}}2. ^Calonzo, Andreo and Legaspi, Amita O. (2012) "PNoy wants Line 1 extension project finished by 2015", GMA News, Online news by Region. Retrieved March 27. 3. ^China open to reconfiguring NorthRail project, says Roxas, Philippine Daily Inquirer, September 2, 2011 4 : Public transportation in the Philippines|Rail transportation in Metro Manila|Rail transportation in the Philippines|Transportation in Luzon |
||||||||||||||||||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。