请输入您要查询的百科知识:

 

词条 Dul Hasti Hydroelectric Plant
释义

  1. Background

     Contracting and design 

  2. See also

  3. References

  4. Sources

{{Use dmy dates|date=February 2015}}{{Use Indian English|date=February 2015}}{{Infobox dam
| name = Dul Hasti Dam
| name_official =
| image =
| image_size =
| image_caption =
| image_alt =
| location_map = India
| location_map_size =
| location_map_caption =
| location_map_alt =
| coordinates = {{coord|33|22|06.69|N|75|47|55.66|E|type:landmark|display=inline,title}}
| country = India
| location = Kishtwar, Jammu and Kashmir
| purpose = Power
| status = O
| construction_began = 1985
| opening = {{Start date and age|2007}}
| demolished =
| cost =
| owner =
| dam_type = Gravity
| dam_crosses = Chenab River
| dam_length = {{Convert|190|m|ft|abbr=on}}
| dam_height = {{Convert|70|m|ft|abbr=on}}
| dam_height_foundation=
| dam_height_thalweg =
| dam_elevation_crest =
| dam_width_crest =
| dam_width_base =
| dam_volume =
| spillway_count =
| spillway_type =
| spillway_capacity = {{Convert|8000|m3/s|ft3/s|abbr=on}}
| res_name =
| res_capacity_total =
| res_capacity_active =
| res_capacity_inactive=
| res_catchment =
| res_surface =
| res_max_length =
| res_max_width =
| res_max_depth =
| res_elevation =
| res_tidal_range =
| plant_name = Dul Hasti Hydroelectric Plant
| plant_coordinates = {{coord|33|17|13.20|N|75|45|42.48|E|type:landmark}}
| plant_operator =
| plant_commission = 2007
| plant_decommission =
| plant_type =
| plant_turbines = 3 x 130 MW Francis-type
| plant_hydraulic_head =
| plant_capacity = 390 MW
| plant_annual_gen =
| website =
| extra =
}}Dul Hasti is a 390 MW hydroelectric power plant in Kishtwar district of Jammu and Kashmir, India built by NHPC. The power plant is a run-of-the-river type on Chandra River, a tributary of Chenab River, in the Kishtwar region, a rugged, mountainous section of the Himalayas, and several hundred kilometers from larger cities. It consists of a {{Convert|70|m|ft|abbr=on}} tall gravity dam which diverts water through a {{Convert|9.5|km|mi|abbr=on}} long headrace tunnel to the power station which discharges back into the Chenab. The project provides peaking power to the Northern Grid with beneficiary states being Jammu and Kashmir, Punjab, Haryana, Uttar Pradesh, Uttarakhand, Rajasthan, Delhi and Union Territory of Chandigarh. It was constructed between 1985 and 2007.[1]

Background

Begun in 1985, the Dulhasti Power project, set in the northern Indian provinces of Jammu and Kashmir, represents an example of a disaster in project cost estimation and delivery. As initially conceived, the project's cost was estimated at 1.6 billion rupees (about $50 million). By the time the contract was let, the cost estimate had risen to 4.5 billion rupees and later successively to 8, 11, 16, and 24 billion rupees (nearly $750 million). The project became operational on 7 April 2007 and has been generating 1907 Million Units of electricity in a 90% Dependable year[2]

Contracting and design

The contract for the power generation project was first awarded to a French consortium at a price of $50 million, who almost immediately asked for an upward price revision.

The site was intended to capitalize on the proximity to a large river systems capable of providing the water capacity needed to run a hydroelectric plant of Dulhasti's dimensions. Unfortunately, the site selected for the project came with some serious drawbacks as well. First, it was sited in the disputed border region between Pakistan and India. Jammu and Kashmir have been the epicenter of numerous and serious clashes between separatist forces demanding independence and Indian army . Constructing such an obvious target as a power plant in the disputed area was sure to provoke reaction by militant groups, using it as their chief means of opposition. Thus, the additional costs of providing security to the site quickly became prohibitively expensive. A second problem concerns the sheer geographical challenge of creating a large plant in a region almost totally devoid of supporting infrastructure, including an adequate logistics network (roads and rail lines). Building the plant in the foothills of the Himalayas may be scenic, but it is not cost effective, particularly as almost all supplies had to be brought in with air transportation, at exorbitant costs. All raw materials, including cement, wood, stone, and steel, had to be hauled by helicopter for miles over snowbound areas.

See also

{{stack|{{Portal|India|Water|Renewable energy}}}}
  • Ratle Hydroelectric Plant – under construction downstream

References

1. ^{{cite web |title=Dul Hasti dam and Hydroelectric Power Project |url=http://www.tractebel-engineering-gdfsuez.com/reference/dul-hasti-dam-and-hydroelectric-power-project/ |publisher=Tractebel |accessdate=15 June 2013 |deadurl=yes |archiveurl=https://web.archive.org/web/20121125130830/http://www.tractebel-engineering-gdfsuez.com/reference/dul-hasti-dam-and-hydroelectric-power-project/ |archivedate=25 November 2012 |df=dmy }}
2. ^{{cite web|url=http://www.nhpcindia.com/Projects/english/Scripts/Prj_Introduction.aspx?vid%3D16 |title=Archived copy |accessdate=2010-11-26 |deadurl=yes |archiveurl=https://web.archive.org/web/20101127181202/http://nhpcindia.com/Projects/english/Scripts/Prj_Introduction.aspx?vid=16 |archivedate=27 November 2010 |df=dmy }}

Sources

{{cite book
| last = Pinto
| first = Jeffrey K.
| title = Project Management - Achieving Competitive Advantage (Custom Edition)
| publisher = Pearson
| location = Upper Saddle River, New Jersey
| year = 2009
| isbn = 978-0-558-20289-7
}}{{GeoGroupTemplate}}{{Power Plants of Jammu and Kashmir}}

7 : Hydroelectric power stations in Jammu and Kashmir|Dams in Jammu and Kashmir|Dams on the Chenab River|Run-of-the-river power stations|Dams completed in 2007|Energy infrastructure completed in 2007|Kishtwar district

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/12 16:29:19