  1. Route description

     Blue Route  Northeast Extension 

  2. Tolls

  3. Services

     Emergency assistance and information  Service plazas 

  4. History

     Mid-County Expressway  Northeast Extension history 

  5. Exit list

  6. See also

  7. References

  8. External links

{{about|the Northeastern Extension of the Pennsylvania Turnpike|the main line of the turnpike|Pennsylvania Turnpike}}{{Infobox road
|state=PA
|route=476
|type=I
|map={{maplink|frame=yes|plain=yes|frame-align=center|frame-width=290|frame-height=290|frame-lat=40.679|frame-long=-75.533|zoom=7|type=line|raw={{Wikipedia:Map data/Wikipedia KML/Interstate 476}}}}
|map_custom=yes
|map_notes=I-476 highlighted in red
|maint=PennDOT and PTC
|section=
|length_mi=132.10
|length_round=2
|length_ref=[1][2][3]
|length_notes=
|history=Established 1970
Completed on December 16, 1992[2]
|tourist=Blue Route Scenic Byway
|direction_a=South
|terminus_a={{jct|state=PA|I|95}} in Woodlyn
|junction={{plainlist|
  • {{jct|state=PA|US|1}} near Springfield
  • {{jct|state=PA|PA|3}} near Broomall
  • {{jct|state=PA|US|30}} in Villanova
  • {{jct|country=USA|I|76|dab1=Philadelphia}} in West Conshohocken
  • {{jct|state=PA|I|276|PATP}} in Plymouth Meeting
  • {{jct|state=PA|US|22}} near Allentown
  • {{jct|state=PA|US|209}} near Lehighton
  • {{jct|state=PA|I|80|PA|940}} near Hickory Run State Park
  • {{jct|state=PA|PA|115}} in Bear Creek Township
  • {{jct|state=PA|PA|315}} in Pittston

}}
|direction_b=North
|counties=Delaware, Montgomery, Bucks, Lehigh, Carbon, Luzerne, Lackawanna
|terminus_b={{jct|state=PA|I|81|US|6|US|11}} near Clarks Summit
|previous_type=PA
|previous_route=475
|next_type=PA 1926
|next_route=476
|next_dab=former
|browse={{pa browse|previous_type=PA|previous_route=8|route=PA 9|next_type=PA 1926|next_dab=1920s|next_route=9}}{{pa browse|previous_type=I 1957|previous_route=479|route=I-480|next_type=PA 1960|next_route=480}}{{pa browse|previous_type=PA|previous_route=492|route=I-495|next_type=PA|next_route=501}}
|spur_type=I
|spur_of=76
}}

Interstate 476 (I-476) is a {{convert|132.1|mi|km|2|sp=us|adj=on}} auxiliary Interstate Highway of Interstate 76 in the U.S. state of Pennsylvania designated between Interstate 95 near Chester and Interstate 81 near Scranton, serving as the primary north–south Interstate corridor through eastern Pennsylvania. It consists of both the {{convert|20|mi|km|2|sp=us|adj=on}} Mid-County Expressway, locally referred to as the "Blue Route" (although no signs exist with that designation), through the suburban Philadelphia-area counties of Delaware and Montgomery, and the {{convert|110.6|mi|km|2|sp=us|adj=on}} Northeast Extension of the Pennsylvania Turnpike connecting the Philadelphia metropolitan area with the Lehigh Valley, the Poconos, and the Wyoming Valley. The Blue Route passes through suburban areas, while the Northeast Extension predominantly runs through rural areas of mountains and farmland, with development closer to Philadelphia and in the Lehigh Valley and the Wyoming Valley. I-476 intersects many major roads including Interstate 76 (the Schuylkill Expressway) in West Conshohocken, Interstate 276 (the Pennsylvania Turnpike) in Plymouth Meeting, U.S. Route 22 near Allentown, and Interstate 80 near Hickory Run State Park.

At its opening in the early 1970s, I-476 was a 4 mile long, 4-lane spur expressway connecting the Schuylkill Expressway with the Pennsylvania Turnpike in Plymouth Meeting. It significantly helped reduce congestion through King of Prussia and the Schuylkill Expressway as it provided a more direct link from the Main Line suburbs to the Northern suburbs and New Jersey. The highway was initially planned to connect down to I-95 in Delaware County, but due to environmental and local opposition, this portion did not open until 1990.

In 1996, the I-476 designation was affixed to the pre-existing Northeast Extension of the Pennsylvania Turnpike, replacing Pennsylvania Route 9. This was an older four lane pre Interstate limited access highway. Of earlier design, its cross section was very narrow, with only 10 feet between opposing lanes of traffic in places. This extended I-476 north of Plymouth Meeting to Clarks Summit (near Scranton) as a part of the Pennsylvania Turnpike system. The crown jewel of this expressway was a state-of-the-art three-level interchange, to connect the new I-476 with the older Pennsylvania Turnpike and the Northeast Extension. This provided direct access to both I-276 east and I-476 north, now on the Northeast Extension. The Northeast Extension served the Lehigh Valley at U.S. Route 22, with connection to I-78, the southern bypass of Allentown/Bethlehem. With the completion of the Northeast Extension, I-476 became the longest auxiliary Interstate Highway, surpassing I-495 in Massachusetts.

I-476 was widened to 6 lanes between I-76 and I-276 in 1990-1992. It was later widened to 6 lanes up to Lansdale between 2015-2017.

Route description

Blue Route

The portion of Interstate 476 between Interstate 95 and Interstate 276 runs north–south through Delaware and Montgomery Counties and is officially known as the Mid-County Expressway and the Veterans Memorial Highway, as well as by the nickname the "Blue Route". The road's southern terminus is at a junction with Interstate 95 near Chester, a city southwest of Philadelphia, near Philadelphia International Airport.[4] Heading north, the road immediately narrows to a four-lane parkway north of Exit 1, MacDade Boulevard. It winds through the western Philadelphia suburbs of Wallingford and Swarthmore, where I-476 comes to an interchange with Baltimore Pike just west of Springfield. From here, the freeway continues north to Springfield, where it meets U.S. Route 1 at a three-level diamond interchange.[4]

Past US 1, I-476 continues through wooded suburban areas and interchanges with Pennsylvania Route 3 in Broomall, where it widens to six lanes.[4] The route continues to Radnor Township, on the Main Line, where it interchanges with U.S. Route 30.[4] Stone monuments, including a large stone cairn atop a hill and a large crushed-stone image of a mythological griffin on a hillside, were constructed at the Route 30 interchange to commemorate Radnor's history as part of the Welsh Tract.[5] Proceeding northward, the route enters Montgomery County and comes to an interchange with Interstate 76 (Schuylkill Expressway) at West Conshohocken. After crossing the Schuylkill River on the Pearl Harbor Memorial Bridge, the freeway heads into Plymouth Township, where it has interchanges with Ridge Pike and Germantown Pike before coming to the Mid-County Interchange with the Pennsylvania Turnpike in Plymouth Meeting.[4][6] The entire length of the Blue Route is designated the Blue Route Scenic Byway, a Pennsylvania Scenic Byway.[7]

Northeast Extension

Beyond the Mid-County Interchange, Interstate 476 enters the Pennsylvania Turnpike system, interchanging with Interstate 276 and continuing north as the Northeast Extension of the Pennsylvania Turnpike. The route continues through the Philadelphia suburbs and has an interchange with Pennsylvania Route 63 near Lansdale that serves the North Penn Valley region. Past this interchange, the route enters a more rural setting of woods and farms, crossing into Bucks County and coming to an interchange with Pennsylvania Route 663 near Quakertown. The Northeast Extension continues north into Lehigh County, part of the Lehigh Valley metropolitan area, past the PA 663 interchange. Here, it has a ramp to the dual-access Allentown Service Plaza in Upper Macungie Township, and just north of it, I-476 interchanges with U.S. 22 (Lehigh Valley Thruway) near Allentown, which offers an indirect connection to Pennsylvania Route 309 and Interstate 78. [4]

North of Allentown, the route runs through more farmland before passing under the Blue Mountain in the Lehigh Tunnel and entering Carbon County in the Pocono Mountains. Here, I-476 crosses over the Lehigh River and interchanges with U.S. 209 near Lehighton. Continuing through mountainous areas, it has an E-ZPass-only exit for Pennsylvania Route 903 and cuts through Hickory Run State Park before interchanging with Interstate 80 and Pennsylvania Route 940 just to the north of the state park.[4] The route continues through mountainous terrain, heading into Luzerne County and coming to an interchange with Pennsylvania Route 115 in Bear Creek that provides access to nearby Wilkes-Barre.[4] The route comes to a toll barrier near Pittston that marks the northern end of the toll ticket system in the Northeast Extension.[4][8] A short distance later, an interchange with Pennsylvania Route 315 provides indirect access to Interstate 81 and Scranton.

Past this interchange, I-476 enters Lackawanna County and crosses built-up areas of the Wyoming Valley as it skirts around Scranton, with a mainline all-electronic toll plaza, where tolls can be paid with E-ZPass or toll-by-plate, and an exit to Keyser Avenue. North of Scranton in Clarks Summit, the route crosses a valley on the {{convert|1,630|ft|m|adj=mid|-long}}, {{convert|163|ft|m|adj=mid|-high}} John E. Fitzgerald Memorial Bridge,[9] comes to a hairpin curve, and ends at an interchange with connections to I-81, US 6 and US 11. US 6 joins the turnpike for less than {{convert|1/4|mi|km}} to connect between I-81 and US 11. As this is beyond the Clarks Summit all-electronic toll plaza, no toll is collected on this short segment.[6]

Tolls

The Northeast Extension of the Pennsylvania Turnpike uses the ticket system method of tolling between the Mid-County and Wyoming Valley toll plazas along with the mainline Pennsylvania Turnpike.[10] With the ticket system, a motorist receives a ticket upon entering the turnpike at an interchange and pays the fare and surrenders the ticket upon exiting. If a motorist loses the ticket, the turnpike charges the highest fare to the exit where the motorist leaves.[11] Cash, credit cards, and E-ZPass are accepted at traditional toll plazas. Mainline toll plazas are also located at Keyser Avenue and Clarks Summit, charging a flat rate using toll-by-plate (which uses automatic license plate recognition to take a photo of the vehicle's license plate and mail a bill to the vehicle owner) or E-ZPass. There are no tolls on exit ramps between Wyoming Valley and Clarks Summit. As of 2019, it costs a passenger vehicle $13.70 to travel the length of the Northeast Extension between Mid-County and Wyoming Valley using cash and $9.60 using E-ZPass. The Keyser Avenue and Clarks Summit toll plazas cost $2.20 using toll-by-plate and $1.00 using E-ZPass for passenger vehicles.[10]

The tickets along the Northeast Extension of the Pennsylvania Turnpike were originally handed out by person. In 1987, machines started to replace humans in distributing tickets.[12] In 1990, an electronic toll collection system was proposed for the Pennsylvania Turnpike, where a motorist would create an account and use an electronic device that would be read from an electronic tollbooth. The motorist would be billed later.[13] The multi-state electronic tolling system, which was to be called E-ZPass, was planned to be implemented by 1998.[14][15] The planned installation date was later pushed back to 2000.[16] On December 2, 2000, E-ZPass debuted along the Northeast Extension of the Pennsylvania Turnpike between Mid-County and Lehigh Valley.[17][18] On December 15, 2001, E-ZPass was extended to include the entire length of the Northeast Extension of the Pennsylvania Turnpike.[19][20] Commercial vehicles were allowed to start using E-ZPass on December 14, 2002.[21]

On November 24, 2004, the day before Thanksgiving, 2,000 Teamsters Union employees went on strike, after contract negotiations failed. This was the first strike in the history of the roadway. As this is usually one of the busiest traffic days in the United States, to avoid traffic jams, tolls were waived for the rest of the day.[22] Starting on November 25, turnpike management personnel collected flat-rate passenger tolls of $2 and commercial tolls of $15 from cash customers on the ticketed system, while E-ZPass customers were charged the lesser of the actual toll or the same flat rates.[23] The strike ended after seven days when both sides reached an agreement on November 30. Normal toll collection resumed December 1.[24] The strike occurred one day after the beginning of E-ZPass tolls at Clarks Summit and Keyser Avenue.

The Turnpike Commission announced plans to consider eliminating manned toll booths in favor of all-electronic tolls. With this, tolls will be paid using either E-ZPass or credit cards.[25] Drivers unable to pay by either of these methods will be billed in the mail using license plate recognition; an additional surcharge will be applied.[26] In addition to E-ZPass, the turnpike commission offered other automated options to pay for tolls such as using a prepaid account that utilizes license plate recognition. McCormick Taylor and Wilbur Smith Associates have been hired to conduct a feasibility study on converting the road to all-electronic tolls.[27]

On March 6, 2012, the turnpike commission announced that it was going forward with an all-electronic tolling plan.[28] Such a plan will take at least five years to implement to allow time for equipment to be installed and the reconfiguration of ramps. It will save the turnpike commission $65 million a year on labor costs by eliminating toll collectors. The plans call for a 76% surcharge for motorists who do not have E-ZPass that are billed by mail. This surcharge could raise the toll for someone without E-ZPass to $53.10 to travel the entire turnpike.[29] In October 2016, the turnpike began accepting credit cards as payment at all cash toll booths.[30] On April 29, 2018, the turnpike commission implemented all-electronic tolling at the Keyser Avenue and Clarks Summit toll plazas.[31][32]

Services

Emergency assistance and information

The Northeast Extension has a callbox every mile for its entire length.[44] In September 2017, the turnpike commission began removing the callboxes due to increased mobile phone usage making the callboxes obsolete.[33] Motorists may also dial *11 on their mobile phones. First responder services are available to all turnpike customers via the State Farm Safety Patrol program. The safety patrol program, which is free, looks for disabled motorists, debris, and accidents along the roadway and provides assistance. The patrol service is available 24 hours every day of the year. Each patrol vehicle covers a {{convert|20|to|25|mi|km|adj=on}} stretch of the turnpike.[34] Towing services are available from authorized service garages located near the highway.[35] Pennsylvania State Police Troop T patrols the Pennsylvania Turnpike Northeast Extension. It has headquarters in Highspire and a substation at Pocono.[36]

The Pennsylvania Turnpike Commission broadcasts current roadway, traffic, and weather conditions via "Highway Advisory Radio" transmitters at each exit. Broadcasts are available on AM 1640 and can be received approximately two miles away from each exit.[37] Motorists can also receive alerts and information via the internet, mobile phone, a hotline, and message boards at service plazas through the Turnpike Roadway Information Program (TRIP).[38]

Service plazas

The Northeast Extension of the Pennsylvania Turnpike has 2 service plazas at Allentown and Hickory Run. The service plazas offer various fast food restaurants such as Burger King, Roy Rogers, Famous Famiglia Pizzeria, Auntie Anne's, Hershey's Ice Cream, and Starbucks, and a gift shop. Each service plaza also has a Sunoco gas station and an A-Plus convenience store. Other amenities are available such as an ATM, free cell phone charging, picnic areas, restrooms, tourist information, Travel Board information centers, and Wi-Fi. The Allentown plaza contains a seasonal farmers market. The Allentown plaza offers E85 while both plazas offer conventional gasoline and diesel fuel.[39] The Sunoco and A-Plus locations are operated by Energy Transfer Partners (who bought Pennsylvania-based Sunoco in 2012) while the remaining restaurants and general upkeep of the service plazas are operated by HMSHost.[40]

In 2006, HMSHost was awarded a contract to reconstruct the service plazas along the turnpike.[41] The reconstruction of the service plazas, which is to cost $150 million, will include a food court layout and modernized restrooms. Sunoco will continue to operate the gas stations at the renovated service plazas. The Allentown service plaza was rebuilt between September 2007 and May 2008 while the Hickory Run service plaza was rebuilt between January 2009 and November 2010.[42]

History

Mid-County Expressway

{{infobox road small
|state=PA
|type=I 1957
|route=495
|location=Woodlyn-Plymouth Meeting
|length_mi=
|length_ref=
|formed=1956
|deleted=1958
}}{{infobox road small
|state=PA
|type=I 1957
|route=480
|location=Woodlyn-Plymouth Meeting
|length_mi=
|length_ref=
|formed=1958
|deleted=1964
}}

Originally planned as far back as 1929, the Mid-County Expressway was later proposed by the Pennsylvania Turnpike Commission as the "Chester Extension" of the Pennsylvania Turnpike in 1954. After the advent of the Interstate Highway System, the project was transferred to the Pennsylvania Department of Highways to be built as part of the system, designating it first as Interstate 495, and later as Interstate 480, as I-76 was designated as I-80S at the time. The present-day I-476 designation was assigned on February 6, 1964, when I-80S was renumbered as I-76.[43]

The road received its nickname from a 1958 location report indicating various proposed geographic configurations of an expressway through Delaware County with lines of various colors on a map. The "blue route" through the Crum Creek valley won out over other contenders, which included a more easterly "red route" and "yellow route" and a more westerly "green route".[44]

As one of the most controversial Interstate Highways in Pennsylvania, construction of I-476 began in 1967, but was not completed until 1991 between MacDade Boulevard (Exit 1) and Interstate 76 (Exit 16), and until 1992 between Germantown Pike east/Chemical Road (Exit 19) and Interstate 276/Pennsylvania Turnpike (Exit 20), due to litigation between the Pennsylvania Department of Transportation and several communities in the road's path over environmental concerns. However, the section of Interstate 476 (south end of I-476) between I-95 and MacDade Blvd. (Exit 1) was opened in 1987, but signage labeled it as a route "To MacDade Blvd" until 1991 when I-476/The Blue Route was opened between Exits 1 and 16, and connected with the short existing section of roadway dating back to 1979 from Exit 16-Exit 19.

An agreement in 1985 led to many environmental compromises in the road's design, including a downsized four-lane design south of Pennsylvania Route 3, ramp meters, and federal scenic route status, prohibiting the erection of advertisement billboards along the entire freeway portion. While the redesigned highway was largely well-received, the constriction to four lanes has led to bottleneck conditions in the area, and many communities that originally opposed the road have now called for its widening.[45] The Philadelphia Inquirer dubbed I-476 "the most costly, most bitterly opposed highway in Pennsylvania history" due to the decades of opposition it garnered.[46]

In the 2000s, the road underwent a complete rehabilitation project, including paving, bridge repair, and ramp maintenance of the entire length of the freeway between Interstate 95 and the Pennsylvania Turnpike.[47] The section between I-95 and I-76 was completed in 2007 and the section between I-76 and I-276 was completed in the end of 2011.

Northeast Extension history

{{infobox road small
|state=PA
|type=PA
|route=9
|location=Plymouth Meeting – Clarks Summit
|length_mi=111.04
|length_ref=[60]
|length_round=2
|formed=1980
|deleted=1996
}}

In 1953, an extension of the Pennsylvania Turnpike from the mainline near Philadelphia north through Northeastern Pennsylvania to the New York border near Binghamton was proposed.[48][49] Groundbreaking for the Northeastern Extension occurred on March 25, 1954 in White Haven, with Governor John S. Fine and commission chairman Thomas J. Evans present. The Northeast Extension was planned to run from the mainline Pennsylvania Turnpike in Plymouth Meeting north to a temporary terminus at Scranton.[50] In April 1954, $233 million in bonds were issued to build the Northeastern Extension along with the Delaware River Bridge on the mainline Pennsylvania Turnpike.[51] The Northeast Extension was built with a {{convert|4|ft|m|adj=on}} median in order to save money.[52] Due to the mountainous terrain it passed through, a large amount of earthwork was necessary to build the road along with the construction of large bridges.[53] Among the bridges built was the {{convert|1630|ft|m|adj=mid|-long}} Clarks Summit Bridge (since renamed for John J. Fitzgerald, Turnpike engineer and superintendent) over US 6/US 11, which was the tallest bridge on the Pennsylvania Turnpike system at {{convert|135|ft|m}}.[54][9] The Northeast Extension also included the two-lane Lehigh Tunnel through Blue Mountain. The tunnel was originally going to be named for commission chairman Evans, but was changed when he was convicted of conspiracy to defraud the commission of $19 million (equal to ${{formatnum:{{Inflation|US|19000000|1967}}}} today).[53]

The roadway opened between Plymouth Meeting and the Lehigh Valley interchange near Allentown on November 23, 1955. The highway was extended north to Emerald on December 28, 1955.[55] The Northeast Extension was opened between Emerald and Wyoming Valley on April 1, 1957.[56] The entire length of the Northeast Extension was finished on November 7, 1957 with the completion of the northernmost part between Wyoming Valley and Scranton.[57] The part of the Northeast Extension between Scranton and the New York border would not be built as part of the Pennsylvania Turnpike system but rather the Interstate Highway System as I-81.[58][59] At the northern terminus, the Northeast Extension narrowed to two lanes along the northbound off-ramp at Scranton to come to its northern terminus, with an abandoned short spur of the mainline heading north. A pair of trumpet interchanges were built to connect the Northeast Extension and I-81.[59] In 1980, the roadway would be designated PA 9.[60]

When it first opened, traffic on the Northeast Extension of the Pennsylvania Turnpike was light.[52] By the 1970s, traffic along the roadway would increase with the completion of the connecting I-80 and the rising popularity of the Poconos as a vacation destination. As a result, the two-lane Lehigh Tunnel faced serious congestion. Plans were made to either bypass the tunnel or add a second tube. The turnpike commission decided it would build a second tunnel as the cost was lower than building a bypass.[61] In 1988, a $37 million contract was awarded to build the second tube.[62] Groundbreaking for the tunnel took place on February 14, 1989, with Governor Robert P. Casey in attendance.[63] Excavation of the new tunnel began in July of that year. Construction of the second tube utilized the New Austrian Tunnelling method, which reduced the cost of the tunnel by $5 to $6 million. It was the first tunnel in the United States to use this construction method. The second tube at Lehigh Tunnel opened on November 22, 1991, with Governor Casey in attendance leading a line of antique cars. Construction of the tunnel cost $45 million. The new tube is used for southbound traffic while the original tube carries northbound traffic. The newer tunnel is wider, higher, and brighter than the original.[64]

On February 1, 1995, the Keyser Avenue interchange near Scranton was slated to open at a cost of $22.4 million. Construction of this interchange also involved constructing a new mainline flat-rate toll barrier near the new interchange.[65]

On November 1, 1996, the Northeast Extension was added to the Interstate Highway System as an extension of I-476, replacing the PA 9 designation along the road. The addition of the second tube at the Lehigh Tunnel along with new guardrails and line striping was necessary for the toll road to become an Interstate. It was hoped that the Interstate designation would bring economic development and tourism to the areas served by the roadway.[66] This extension resulted in I-476 surpassing the {{convert|120|mi|km|adj=on}} I-495 in Massachusetts as the longest auxiliary Interstate Highway.[67]

In 2007, the turnpike commission announced plans to widen the Northeast Extension to six lanes between Mid-County and Lansdale.[68] The project divided this stretch of highway into two sections. Work on the southern section began in January 2008 with the replacement of two bridges over the Northeast Extension to accommodate the widened highway. Construction on the actual widening phase commenced in January 2011. Completion was originally planned in 2013; however, construction fell a year behind schedule.[86][69] The southern section finished up in October 2014, while work on the northern section started in May 2014. By this point the project scope was expanded to include the Lansdale interchange itself, the roadway to a point one mile north of the interchange, and two new E-ZPass-only ramps at the Lansdale interchange to relieve congestion at the toll plaza. This new northbound exit ramp opened December 4, 2016, and the companion southbound on-ramp opened a week later.[70]. The northern section was originally planned to finish by the end of 2016 but was delayed until mid-2017.[71] Construction was substantially completed, with all six lanes open, by August 31, 2017.[72]

Once widening was completed from Mid-County to Lansdale, a similar project began on the next segment of highway, from Lansdale to Quakertown. As done on the first project, the Lansdale-to-Quakertown segment is being rebuilt in two sections, with a southern half started in late 2017, with widening to 6 lanes and full shoulders.[73] Advance work began in early 2013 with replacement of several bridges in this area north of Lansdale, with work on the actual widening beginning in late 2017.[74]

The Turnpike Commission has stated its intention of continuing the widening effort past Quakertown all the way north to the Lehigh Valley interchange, milepost 56,[75] although it will take until the late 2020s to get it done.

In 1990, plans were made to build an interchange at PA 903 in Carbon County. A bill authorizing construction of this interchange was signed into law by Governor Casey in July of that year.[76] Plans for this interchange were cancelled by the turnpike commission in 1995.[77] In 2006, plans for an interchange at PA 903 were resurrected, with the proposed interchange to be all-electronic, in that it will only accept E-ZPass.[78] Construction on the $23 million interchange began in the middle of 2008.[79][80] The interchange opened to traffic on June 30, 2015.[81]

On April 28, 2016, plans were announced for a "Scranton Beltway" to use I-476 as a bypass for I-81 around the heavily congested segment through Scranton and its suburbs. The turnpike between the two I-81 interchanges carries an average of 10,000 vehicles per day vs. 70,000 on the parallel segment of I-81. This project will build two high-speed connections between I-476 and I-81: one south of Scranton in Dupont and one north of Scranton in South Abington Township. Tolls on the connections will be paid with E-ZPass or toll-by-plate. Construction on this project, which is expected to cost $160 million, could begin as soon as 2021.[82]

Howard M. Sexton, a 70-year-old truck driver from New Jersey, was killed in the southbound Lehigh Tunnel on February 21, 2018, when an electrical conduit broke free from the tunnel's ceiling and fell through the windshield of his truck, striking him in the head.[83] In a preliminary report issued on May 1, 2018, the National Transportation Safety Board revealed that a 10-foot-long section of conduit fell into the path of Sexton's truck after the steel support system for the conduits, which were suspended from the apex of the tunnel arch directly over the travel lanes, failed. The tunnel had last been inspected in 2016, at which time an inspector found evidence of corrosion on several of the steel support straps.[84]

Exit list

The old exit numbers (31 and upward) on the turnpike Northeast Extension were a continuation of old exit numbers 1 through 30 on the east-west turnpike. On the east-west turnpike, the interchange with I-476 was old exit 25A because it was between old exits 25 and 26 on the east–west turnpike. {{jcttop|old|name|length_ref=[85]|old_ref=
[104]|exit_ref=
[86]}}

{{PAint|old|name
|county=Delaware
|cspan=6
|location=Ridley Township
|lspan=2
|mile=0.00
|old=–
|exit=–
|road={{jct|state=PA|I|95|city1=Philadelphia|city2=Chester}}
|notes=Exit 7 on I-95; access to Philadelphia International Airport}}{{PAint|old|name
|mile=0.48
|old=1
|exit=1
|road=MacDade Boulevard
|notes= Access to Ridley, Chester, and Widener University}}{{PAint|old|name
|location=Nether Providence Township
|ctdab=Delaware
|mile=3.39
|old=2
|exit=3
|road=Media, Swarthmore
|notes=Access via Baltimore Pike}}{{PAint|old|name
|location=Marple Township
|lspan=2
|mile=5.07
|old=3
|exit=5
|road={{jct|state=PA|US|1|city1=Lima|location2=Springfield}}
|notes=}}{{PAint|old|name
|mile=8.77
|old=4
|exit=9
|road={{jct|state=PA|PA|3|city1=Broomall|city2=Upper Darby}}
|notes=Access to Havertown and Newtown Square}}{{PAint|old|name
|location=Radnor Township
|mile=13.24
|old=5
|exit=13
|road={{jct|state=PA|US|30|city1=Villanova|city2=St. Davids}}
|notes=Access to Philadelphia Main Line}}{{PAint|old|name
|county=Montgomery
|cspan=9
|location=West Conshohocken
|mile=15.84
|old=6
|exit=16
|road={{jct|state=PA|I|76|PA|23|name1=Schuylkill Expressway|city1=Philadelphia|city2=Valley Forge|city3= Conshohocken}}
|notes=Signed as exits 16A (east) and 16B (west) northbound; exit 331 on I-76}}{{PAint|old|name
|location=Plymouth Township
|ctdab=Montgomery
|lspan=6
|mile=18.81
|mspan=2
|old=7A
|exit=18A
|type=incomplete
|road=Conshohocken
|notes=Northbound exit and southbound entrance; access via Ridge Pike}}{{PAint|old|name
|mile=none
|old=7B
|exit=18B
|road=Norristown
|notes=Access via Chemical Road; signed as exit 18 southbound}}{{PAint|old|name
|mile=19.69
|old=8
|exit=19
|type=incomplete
|road=Plymouth Meeting
|notes=Northbound exit and southbound entrance; access via Chemical Road}}{{PAint|old|name
|mile=19.97
|mspan=2
|old=9
|exit=20
|type=incomplete
|road={{jct|state=PA|to1=yes|I-Toll|276|PATP||dir2=west|road=Plymouth Road}}
|notes=Southbound exit is via I-276 / Penna Turnpike;
via Germantown Pike west}}{{PAint|old|name
|mile=none
|type=trans
|place=Mid-County Toll Plaza
Blue Route transitions to Pennsylvania Turnpike Northeast Extension}}{{PAint|old|name
|mile=20.33
|old=–
|exit=–
|type=incomplete
|road={{Jct|state=PA|I|276|PATP|city1=Harrisburg|location2=New Jersey}}
|notes=Northbound exit to I-276 west is via exit 20; southbound I-476 signed as Exit 20 with name Mid-County}}{{PAint|old|name
|location=Towamencin Township
|lspan=2
|mile=30.78
|old=–
|exit=31A
|type=etc
|name=Lansdale
|road={{jct|state=PA|PA|63|city1=Harleysville|city2=Kulpsville}}
|notes=E-ZPass-only interchange; northbound exit and southbound entrance}}{{PAint|old|name
|mile=30.78
|old=31
|exit=31B
|name=Lansdale
|road={{jct|state=PA|PA|63|city1=Harleysville|city2=Kulpsville|city3=Lansdale}}
|notes=Signed as exit 31 southbound; Harleysville and Kulpsville signed northbound; Lansdale signed southbound
}}{{PAint|old|name
|county=Bucks
|location=Milford Township
|ctdab=Bucks
|mile=44.39
|old=32
|exit=44
|name=Quakertown
|road={{jct|state=PA|PA|663|city1=Pottstown|city2=Quakertown}}
|notes=}}{{PAint|old|name
|county=Lehigh
|cspan=2
|location=Upper Macungie Township
|mile=56.37
|place=Allentown Service Plaza}}{{PAint|old|name
|location=South Whitehall Township
|mile=57.71
|old=33
|exit=56
|name=Lehigh Valley
|road={{jct|state=PA|US|22|to2=to|I|78|PA|309|city1=Allentown|city2=Harrisburg}}
|notes=}}{{jcttunnel|old|name
|river=Blue Mountain
|mile=71.68
|tunnel=Lehigh Tunnel}}{{PAint|old|name
|county=Carbon
|cspan=4
|location=Franklin Township
|ctdab=Carbon
|mile=75.73
|old=34
|exit=74
|name=Mahoning Valley
|road={{jct|state=PA|US|209|city1=Stroudsburg|city2=Lehighton}}
|notes=Access to The Poconos}}{{PAint|old|name
|location=Penn Forest Township
|lspan=2
|mile=86.62
|place=Hickory Run Service Plaza}}{{PAint|old|name
|mile=87.39
|old=–
|exit=87
|type=etc
|name=
|road={{jct|state=PA|PA|903|city1=Jim Thorpe|city2=Lake Harmony}}
|notes=E-ZPass-only interchange}}{{PAint|old|name
|location=Kidder Township
|mile=94.82
|old=35
|exit=95
|name=Pocono
|road={{jct|state=PA|I|80|PA|940|city1=Hazleton|city2=Mount Pocono}}
|notes=}}{{PAint|old|name
|county=Luzerne
|cspan=3
|location=Bear Creek Township
|mile=105.85
|old=36
|exit=105
|name=Wilkes-Barre
|road={{jct|state=PA|PA|115|city1=Wilkes-Barre|location2=Bear Creek}}
|notes=}}{{PAint|old|name
|location=Pittston Township
|lspan=2
|mile=113.42
|place=Wyoming Valley Toll Plaza
North end of ticket system}}{{PAint|old|name
|mile=115.17
|old=37
|exit=115
|name={{nowrap|Wyoming Valley}}
|road={{jct|state=PA|PA|315|to2=to|I|81|city1=Pittston|city2=Scranton}}
|notes=}}{{PAint|old|name
|county=Lackawanna
|cspan=4
|location=Taylor
|lspan=2
|mile=121.61
|type=etc
|place=Keyser Avenue Mainline Toll Plaza
Toll-by-plate or E-ZPass}}{{PAint|old|name
|mile=122.36
|old=38
|exit=122
|name=Keyser Avenue
|road=Old Forge, Taylor
|notes=Access via Keyser Avenue}}{{PAint|old|name
|location=Clarks Summit
|lspan=2
|mile=131.20
|type=etc
|place=Clarks Summit Mainline Toll Plaza
Toll-by-plate or E-ZPass}}{{PAint|old|name
|mile=131.37
|old=39
|exit=131
|name=Clarks Summit
|road={{jct|state=PA|I|81|US|11|US|6|city1=Scranton|city2=Clarks Summit|location3=Binghamton|city4=Wilkes-Barre|I|84|I|380|to4=yes}}
|notes=Exit 194 on I-81}}{{jctbtm|col=9|keys=incomplete,etc,trans}}

See also

  • {{Portal-inline|U.S. Roads}}
  • {{Portal-inline|Pennsylvania}}

References

1. ^{{cite web|url=http://www.476blueroute.com/pdf/pm89_handout%2003-02-06%20revised.pdf|title=Resurfacing|accessdate=2007-03-07|format=PDF|work=I-476 Improvement Project|publisher=Pennsylvania Department of Transportation|deadurl=yes|archiveurl=https://web.archive.org/web/20070615072541/http://www.476blueroute.com/pdf/pm89_handout%2003-02-06%20revised.pdf|archivedate=2007-06-15|df=}}
2. ^{{cite news|author=Jeremy Rogoff|author2=Mari A. Schaefer|title=No remedy soon for a clogged Blue Route|publisher=The Philadelphia Inquirer|id=|pages=2|date=2007-06-10}}
3. ^{{cite web|url=http://www.paturnpike.com/toll/tollmileage.aspx|title=Pennsylvania Turnpike Toll/Mileage Calculator|accessdate=2007-03-07|format=|publisher=Pennsylvania Turnpike Commission}}
4. ^{{google maps |url=https://maps.google.com/maps?f=d&source=s_d&saddr=I-95+and+I-476+chester,+pa&daddr=I-476+%40+41.483,+-75.683&geocode=%3BFfj6eAIdSCt9-w&hl=en&mra=ls&sll=41.483505,-75.700779&sspn=0.056841,0.109863&ie=UTF8&t=h&z=8 |title=overview of Interstate 476 |accessdate=2009-06-01}}
5. ^Radnor Township website {{webarchive|url=https://web.archive.org/web/20070820120212/http://www.radnor.com/department/division.asp?fDD=9-108 |date=2007-08-20 }}, Gateway Enhancement Strategy
6. ^{{cite map|publisher=Pennsylvania Department of Transportation|title=Official Tourism and Transportation|url=http://www.dot7.state.pa.us/BPR_PDF_FILES/MAPS/Statewide/otm/otmplot_web.pdf|edition=|year=2015|cartography=|scale=|series=|page=|section=|accessdate=February 2, 2016|isbn=|id=}}
7. ^{{cite web|url=http://www.visitpa.com/blue-route|title=Blue Route|publisher=VisitPA.com|accessdate=March 27, 2012}}
8. ^{{cite web|url=http://www.paturnpike.com/toll/images/pdfs/PTC%202009%20Cash%20Tolls%20BW%20Booklet.pdf|title=Toll Schedule – Cash Rates|publisher=Pennsylvania Turnpike Commission|date=January 4, 2009|accessdate=2009-06-01|deadurl=yes|archiveurl=https://web.archive.org/web/20090327034625/http://www.paturnpike.com/toll/images/pdfs/PTC%202009%20Cash%20Tolls%20BW%20Booklet.pdf|archivedate=March 27, 2009|df=}}
9. ^{{cite news |url=http://www.abingtonsuburban.com/news/the-bridge-that-john-built-1.624354 |title=The Bridge that John Built |date=February 17, 2010 |author=Coyle, Ellen |newspaper=Abington Suburban |accessdate=July 21, 2017}}
10. ^{{cite book|url=https://www.paturnpike.com/pdfs/tolls/tolls_2019/2019_Tolls.pdf|title=2019 Toll Schedule|last=|first=|publisher=Pennsylvania Turnpike Commission|year=2019|isbn=|location=|pages=|accessdate=January 7, 2019}}
11. ^{{cite web|title=Traffic Rules and Regulations|publisher=Pennsylvania Turnpike Commission|accessdate=August 3, 2015|url=https://www.paturnpike.com/travel/traffic_rules_regulations.aspx}}
12. ^{{cite news|last=Blankenship|first=Karl|title=That's the ticket: Machines replacing man on turnpike|work=The Patriot-News|location=Harrisburg, PA|date=July 22, 1987|page=B1}}
13. ^{{cite news|title=Drive Now, Pay The Toll Later Pike Travelers Favor The Electronic System|work=Philadelphia Daily News|date=July 12, 1990|page=28}}
14. ^{{cite news|title=Electronic tolls coming to Pa. Turnpike by 1998|agency=Associated Press|work=Lancaster New Era|date=March 22, 1994|page=A03}}
15. ^{{cite news|last=Gilbert|first=Pat R.|title=7 Agencies OK Electronic Toll-Collection Firm - Project Expected To Speed Traffic On Parkway, Turnpike|work=The Record|location=Bergen County, NJ|date=March 22, 1994|page=A03}}
16. ^{{cite news|last=Wyckoff|first=P.L.|title=E-ZPass to debut on Atlantic City highway - But 2000 is target for Turnpike and Parkway|work=The Star-Ledger|location=Newark, NJ|date=March 12, 1998|page=22}}
17. ^{{cite news|last=Downs|first=Jere|title=E-ZPass Off To UnE-Z Beginning On Turnpike|work=The Philadelphia Inquirer|date=December 3, 2000|page=B04}}
18. ^{{cite news|title=E-ZPass not so easy for drivers on first day|agency=Associated Press|work=Erie Times-News|date=December 3, 2000}}
19. ^{{cite news|title=Pennsylvania Turnpike extends E-ZPass service|work=The Express-Times|location=Easton, PA|date=December 15, 2001}}
20. ^{{cite news|last=Fuoco|first=Michael A.|title=Turnpike E-ZPass Will Get More Lanes|work=Pittsburgh Post-Gazette|date=December 22, 2001|page=D-6}}
21. ^{{cite news|last=Therolf|first=Garrett|title=E-ZPass making life harder for bridge users|work=The Morning Call|location=Allentown, PA|date=December 15, 2002|page=B1}}
22. ^{{cite news|last=Wartenberg|first=Steve|title=Turnpike strike lops tolls for a day ** 2,000 Teamsters take action. Non-union staff will be in booths today.|work=The Morning Call|location=Allentown, PA|date=November 25, 2004|page=A1}}
23. ^{{cite news|last=Shields|first=Jeff|title=Traffic moves, despite strike - Turnpike managers working the toll booths gave drivers a pass when backups occurred. Negotiations were on hold. |work=The Philadelphia Inquirer|date=November 26, 2004|page=B01}}
24. ^{{cite news|title=Turnpike returns tolls to normal - Drivers were issued tickets beginning at 9 p.m. Wednesday. |work=The Express-Times|location=Easton, PA|date=December 2, 2004|page=B1}}
25. ^{{cite news|last=Schmitz|first=Jon|title=Turnpike considers all-electronic tolls |url=http://www.post-gazette.com/stories/news/transportation/turnpike-considers-all-electronic-tolls-267063/|date=October 6, 2010|accessdate=October 7, 2010|work=Pittsburgh Post-Gazette}}
26. ^{{cite news|title=No E-ZPass? Expect to pay extra to drive Interstate 76|url=http://readingeagle.com/article.aspx?id=255316|date=October 11, 2010|accessdate=October 12, 2010|work=Reading Eagle }}
27. ^{{cite news|last=Mattar|first=George|title=Turnpike considers getting rid of cash tolls|work=The Intelligencer|location=Doylestown, PA |date=December 29, 2010|page=1}}
28. ^{{cite news|last=Thompson|first=Charles|title=Caution: All-E-Z Pass turnpike ahead|work=The Patriot-News|location=Harrisburg, PA|date=March 6, 2012|page=A01}}
29. ^{{cite news|last=Nussbaum|first=Paul|title=Pa. Turnpike looks at much higher non-E-ZPass rates|work=The Philadelphia Inquirer|date=March 13, 2012|page=A01}}
30. ^{{cite news |last=Abrams|first=Mark|title = PA Turnpike Now Accepts Credit Cards As Payment Option |url = http://philadelphia.cbslocal.com/2016/10/13/pa-turnpike-now-accepts-credit-cards-as-payment-option/ |location= Philadelphia, PA |publisher = KYW-TV |date = October 13, 2016|accessdate = October 13, 2016}}
31. ^{{cite web|title=No Cash Zone - Keyser Avenue / Clarks Summit|publisher=Pennsylvania Turnpike Commission|url=https://www.nocashzone.com/keyser_clarks.aspx|accessdate=April 9, 2018}}
32. ^{{cite web|last=Senior|first=Chase|title=Cashless Tolling Takes Effect on Turnpike in Lackawanna County|publisher=WNEP-TV|location=Scranton, PA|date=April 27, 2018|url=http://wnep.com/2018/04/27/cashless-tolling-on-turnpike-in-lackawanna-county-set-to-begin/|accessdate=April 30, 2018}}
33. ^{{cite press release|title=PA Turnpike Call Box Removal Begins Next Week|publisher=Pennsylvania Turnpike Commission|date=September 8, 2017|url=https://www.paturnpike.com/press/2017/20170908160004.htm|accessdate=September 11, 2017}}
34. ^{{Cite web|url=https://www.paturnpike.com/travel/state_farm_safety_patrol.aspx|title=State Farm Safety Patrol Program |publisher=Pennsylvania Turnpike Commission|date= |accessdate=August 3, 2015}}
35. ^{{Cite web|url=https://www.paturnpike.com/travel/breakdown.aspx|title=If Your Vehicle Breaks Down...|publisher=Pennsylvania Turnpike Commission|date= |accessdate=August 3, 2015}}
36. ^{{Cite web|url=http://www.psp.pa.gov/troop%20directory/Pages/Troop-T.aspx |title=Pennsylvania State Police - Troop T |publisher=Pennsylvania State Police|date= |accessdate=January 8, 2018}}
37. ^{{Cite web|url=http://www.paturnpike.com/news/2002/Jul/nr070302a.aspx |title=HAR Transmissions Now Broadcast at Every PA Turnpike Interchange |publisher=Pennsylvania Turnpike Commission|date=July 3, 2000|accessdate=April 14, 2009|archiveurl=https://web.archive.org/web/20030819060528/http://www.paturnpike.com/news/2002/Jul/nr070302a.aspx|archivedate=August 19, 2003}}
38. ^{{cite web|title=Turnpike Roadway Information Program|publisher=Pennsylvania Turnpike Commission|url=https://www.paturnpike.com/pdfs/travel/TRIP_brochure.pdf|accessdate=August 3, 2015}}
39. ^{{cite book|title=The Travelers Guide to PA Turnpike service plazas|publisher=Pennsylvania Turnpike Commission|year=2015|accessdate=August 3, 2015|url=https://www.paturnpike.com/pdfs/travel/PTC_Service_Plaza_Guide.pdf}}
40. ^{{cite web|title=Service Plazas - Contact Information|publisher=Pennsylvania Turnpike Commission|url=https://www.paturnpike.com/travel/serv_plaza_contact_info.aspx|accessdate=August 3, 2015}}
41. ^{{cite news|title=Pennsylvania Turnpike Contract Awarded to HMSHost|work=Business Wire|date=July 28, 2006}}
42. ^{{cite web|title=Service Plazas: Tentative Reconstruction Schedule |publisher=Pennsylvania Turnpike Commission |accessdate=August 29, 2015 |url=https://www.paturnpike.com/travel/tentative_reconstruction_schedule.aspx |archiveurl=https://www.webcitation.org/6b9owvfLl?url=https://www.paturnpike.com/travel/tentative_reconstruction_schedule.aspx |archivedate=August 30, 2015 |deadurl=yes |df= }}
43. ^{{cite web|url=http://www.fhwa.dot.gov/infrastructure/i76.htm|title=Was I-76 Numbered to Honor Philadelphia for Independence Day, 1776?|publisher=Federal Highway Administration|date=2005-01-18|work=Ask the Rambler|accessdate=2007-06-06}}
44. ^{{cite web|url=http://www.476blueroute.com/history.htm|title=History of the Blue Route|accessdate=2007-06-11|work=I-476 Improvement Project|publisher=Pennsylvania Department of Transportation |archiveurl = https://web.archive.org/web/20070219184651/http://www.476blueroute.com/history.htm |archivedate = February 19, 2007}}
45. ^{{cite web|url=http://www.asphaltinstitute.org/upload/Summer_1997.pdf|title=Asphalt: the Magazine of the Asphalt Institute, Summer 1997|format=PDF|accessdate=2007-03-07|deadurl=yes|archiveurl=https://web.archive.org/web/20070615072541/http://www.asphaltinstitute.org/upload/Summer_1997.pdf|archivedate=2007-06-15|df=}}
46. ^{{cite web|url=http://www.fhwa.dot.gov/byday/fhbd1219.htm|title=FHWA By Day - December 19|accessdate=2007-03-07}}
47. ^{{cite web|url=http://www.476blueroute.com/|title=I-476 Improvement Project|accessdate=2007-03-07}}
48. ^{{cite news|title=Tax-Exempts: Pennsylvania Turnpike Board Plans 125-Mile North-South Extension|work=The Wall Street Journal|date=August 5, 1953|page=11}}
49. ^{{cite news|title=Surveys To Expand Pennsylvania Pike|work=The New York Times|date=August 9, 1953|page=56}}
50. ^{{cite news|title=Turnpike Link Begins|work=The New York Times|date=March 26, 1954|page=28}}
51. ^{{cite news|title=Pike Funds Raised By Pennsylvania|work=The New York Times|date=April 8, 1954|page=41}}
52. ^Dakelman and Schorr, p. 105.
53. ^Dakelman, p. 106.
54. ^Dakelman and Schorr, p. 107.
55. ^Cupper, p. 31.
56. ^{{cite news|title=Pennsylvania Pike Spur To Scranton Area Opens|work=The New York Times|date=April 2, 1957|page=26}}
57. ^{{cite news|title=Pennsylvania Turnpike Opens Its Final Section|work=The New York Times|date=November 8, 1957|page=21}}
58. ^{{cite news|title=Turnpike To The Poconos|work=The New York Times|date=November 10, 1957|page=163}}
59. ^Dakelman and Schorr, p. 108.
60. ^{{cite map|publisher=Pennsylvania Department of Transportation|title=Pennsylvania Official Transportation Map| url=http://www.dot7.state.pa.us/BPR_PDF_FILES/MAPS/Statewide/Historic_OTMs/1980fr.pdf|year=1980|accessdate=January 29, 2015}}
61. ^Cupper, p. 40.
62. ^Cupper, p. 46.
63. ^{{cite news|last=Orenstein|first=Robert H.|title=Tunnel Project Blasts Off Governor Marks Start Of Construction|work=The Morning Call|location=Allentown, PA|date=February 15, 1989|page=B03}}
64. ^{{cite news|last=Laylo|first=Bob|title=New Lehigh Tunnel Opens On Turnpike|work=The Morning Call|location=Allentown, PA|date=November 23, 1991|page=A03}}
65. ^{{cite news|title=Turnpike Soon To Get New Lackawanna Exit|work=The Morning Call|location=Allentown, PA|date=January 25, 1995|page=B06}}
66. ^{{cite news|title=PA Turnpike's Northeast Extension Now An Interstate|agency=Associated Press|work=Erie Times-News|date=November 18, 1996}}
67. ^{{cite web|url=https://www.fhwa.dot.gov/planning/national_highway_system/interstate_highway_system/routefinder/table02.cfm |title=Route Log and Finder List, table 2|publisher=Federal Highway Administration|date=2002-10-31|accessdate=2007-03-07}}
68. ^{{cite news|last=Wilen|first=John|title=Turnpike to widen Northeast Extension - The Turnpike Commission has already notified more than 100 homeowners it wants to buy some or all of their property. Homeowners between Lansdale and Quakertown: You're next.|work=The Intelligencer|location=Doylestown, PA|date=March 30, 2007|page=A03}}
69. ^{{cite news|last=Nussbaum|first=Paul|title=Northeast Extension project a year behind schedule. But why?|work=The Philadelphia Inquirer|date=December 15, 2012|page=A01}}
70. ^{{cite web|title=E-ZPass Only Ramps to Open at Lansdale Interchange on Northeastern Extension|publisher=Pennsylvania Turnpike Commission|date=December 2, 2016|url=https://www.paturnpike.com/press/2016/20161202152213.htm|accessdate=January 1, 2017}}
71. ^{{cite web|title=Current Project Overview and Schedule - Milepost A20-A31 Total Reconstruction Project|publisher=Pennsylvania Turnpike Commission|url=https://www.patpconstruction.com/mpA20toA31/overview/schedule.aspx|accessdate=April 30, 2016}}
72. ^{{cite news|last1=Olson|first1=James|title=Northeast Extension widening project could wrap up in August|date=July 12, 2017|url=http://www.thereporteronline.com/article/RO/20170712/NEWS/170719923|work=The Reporter|location=Lansdale, PA|accessdate=August 31, 2017}}
73. ^{{cite news|last=Yates|first=Riley|title=Bridge work could slow highway traffic.|work=The Intelligencer|location=Doylestown, PA|date=January 7, 2008|page=1}}
74. ^{{cite web|title=Northeastern Extension, Milepost A31 - A38 - Project Schedule|publisher=Pennsylvania Turnpike Commission|url=https://www.patpconstruction.com/mpA31toA38/detail-schedule.aspx|accessdate=April 30, 2016}}
75. ^{{cite web|last1=Sheehan|first1=Daniel Patrick|title=PA Turnpike wants to extend Northeast Extension widening to Lehigh Valley|url=http://www.mcall.com/news/local/eastpenn/mc-turnpike-widening-bridges-20151002-story.html|date=October 2, 2015|work=The Morning Call|location=Allentown, PA|accessdate=August 31, 2017}}
76. ^{{cite news|title=Harrisburg News: Casey Signs Interchange Bill|work=The Morning Call|location=Allentown, PA|date=July 13, 1990|page=B03}}
77. ^{{cite news|last=Braden|first=Tyra|title=Carbon Turnpike Project Canceled - Commission Scraps Penn Forest Interchange Talks, Irks Legislator|work=The Morning Call|location=Allentown, PA|date=August 24, 1995|page=B03}}
78. ^{{cite news|last=Parker|first=Chris|title=E-ZPass slip ramps on Turnpike in Pocono area garners support ** Plan would build them off Northeast Extension in Carbon. |work=The Morning Call|location=Allentown, PA|date=April 28, 2006|page=B5}}
79. ^{{cite news|last=Hartzell|first=Dan|title=Long road ahead to Poconos access from Turnpike|work=The Morning Call|location=Allentown, PA|date=October 11, 2010|page=A5}}
80. ^{{cite web|title=Constructing a New EZ Pass Only Interchange Exit #87 on the NE Extension at Route 903|publisher=Pennsylvania Turnpike Commission|url=http://www.paturnpike.com/constructionprojects/Rt903AEI/|accessdate=January 9, 2015}}
81. ^{{cite web|last=Michlowski|first=Bill|title=New Turnpike Interchange Opens in Carbon County|publisher=WNEP-TV|location=Scranton, PA|date=June 30, 2015|url=http://wnep.com/2015/06/30/new-turnpike-interchange-opens-in-carbon-county/|accessdate=June 30, 2015}}
82. ^{{cite press release|title=Pennsylvania Turnpike and PennDOT Announce Next Step for Planned I-81-Turnpike Beltway for Scranton Region - Plan to Address Congestion Relief|publisher=Pennsylvania Turnpike Commission|date=April 28, 2016|url=https://www.paturnpike.com/press/2016/20160428142143.htm|accessdate=April 30, 2016}}
83. ^{{cite web|title=A deadly accident in the Lehigh Tunnel, once the capstone to the Pennsylvania Turnpike|url=http://www.lehighvalleylive.com/news/index.ssf/2018/02/lehigh_tunnel_accident_pennsylvania_turnpike.html|publisher=lehighvalleylive.com|accessdate=24 February 2018}}
84. ^{{cite web|title=Preliminary Report Highway: HWY18FH006|url=https://www.ntsb.gov/investigations/AccidentReports/Reports/HWY18FH006-prelim.pdf|publisher=National Transportation Safety Board|accessdate=1 May 2018}}
85. ^DeLorme Street Atlas USA 2007, Toggle Measure Tool. Retrieved on 2007-02-27.
86. ^{{Cite web|url=http://www.dot.state.pa.us/public/pdf/mileageb.pdf|title=Pennsylvania Exit Numbering|accessdate=2007-10-02|publisher=Pennsylvania Department of Transportation}}

External links

{{Commons category|Interstate 476}}{{Attached KML|display=title,inline}}
  • Official Pennsylvania Turnpike website
{{I-76 aux}}{{I-80 aux}}{{I-95 aux}}{{Pennsylvania Turnpike Commission}}{{Good article}}

14 : Interstate Highways in Pennsylvania|Delaware Valley|Lehigh Valley|Auxiliary Interstate Highways|Toll roads in Pennsylvania|Tolled sections of Interstate Highways|Interstate 76 (Ohio–New Jersey)|Transportation in Delaware County, Pennsylvania|Transportation in Montgomery County, Pennsylvania|Transportation in Bucks County, Pennsylvania|Transportation in Lehigh County, Pennsylvania|Transportation in Carbon County, Pennsylvania|Transportation in Luzerne County, Pennsylvania|Transportation in Lackawanna County, Pennsylvania

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 18:02:04