请输入您要查询的百科知识:

 

词条 Washingtonian (B&O train)
释义

  1. Schedule and equipment

  2. References

{{DISPLAYTITLE:Washingtonian (B&O train)}}

The Washingtonian was one of two daily American named passenger trains operated by the Baltimore and Ohio Railroad (B&O) during the 1940s–1950s between Baltimore, Maryland and Cleveland, Ohio, via Washington, D. C. and Pittsburgh, Pennsylvania. It was the last B&O long-haul passenger train to be powered by a steam locomotive from the venerable railroad's namesake city.[1][2]

Inaugurated on April 27, 1941, the Washingtonian was primarily a daytime train with a morning departure, in contrast to B&O's other train on the route, the Cleveland Night Express.[1] Between Pittsburgh and Cleveland, the Washingtonian{{'}}s cars left B&O rails and were coupled to the Steel King train of the Pittsburgh and Lake Erie Railroad (P&LE) to Youngstown, Ohio, where the Erie Railroad handled the train to Cleveland.

The Washingtonian was regularly operated with steam locomotives on B&O's Baltimore–Washington, D. C.–Cumberland, Maryland mainline until November 3, 1953, when it was finally assigned diesel locomotives.[2] The diesel-powered, conventionally-equipped Washingtonian was replaced on October 27, 1956, by the faster and more economical Budd Rail Diesel Car (RDC) Daylight Speedliner between Philadelphia, Baltimore, Washington, and Pittsburgh, reducing operating expenses by half.[1] The streamlined Daylight Speedliner's seven-hour schedule on B&O's {{convert|333|mi|km|sing=on}} Baltimore–Pittsburgh route also trimmed almost two hours travel time compared to the Washingtonian.[3]

Schedule and equipment

The westbound Washingtonian, operating as Train # 21, left Baltimore at 9:00 a.m., arriving in Cleveland twelve hours later at 9:00 p.m. Eastbound, the Washingtonian was designated Train # 22. The train's consist was typically a pair of baggage/express cars, a Railway Post Office car, three air conditioned coaches, and a combination parlor-diner-lounge car.[1] In the late 1940s, as many as six additional coaches were added on weekends to accommodate the throngs of East Coast-bound passengers boarding the train at the numerous Appalachian Mountain communities along the B&O's right-of-way.[1]

In its final year of service, westbound Washingtonian Train # 21 operated on the following schedule (principal stops shown in blue, P&LE–Erie Steel King denoted in yellow):

City Departure time
5}}Baltimore, Md. (Mount Royal){{spaces|5}}6}}9:00 a.m.
5}}Washington, D.C. (Union Station)4}}10:05 a.m.
5}}Martinsburg, W. Va.4}}11:36 a.m.
5}}Cumberland, Md.6}}1:15 p.m.
5}}Connellsville, Pa.6}}4:11 p.m.
5}}McKeesport, Pa.6}}5:12 p.m.
5}}Pittsburgh, Pa. (P&LE Station)6}}6:05 p.m.
5}}Youngstown, Ohio6}}7:35 p.m.
5}}Cleveland, Ohio (Union Terminal)6}}9:00 p.m.
source: Official Guide of the Railways, February, 1956[3]

References

1. ^Harry Stegmaier, Baltimore & Ohio Passenger Service, Vol. 2 – Route of the Capitol Limited. Lynchburg, Va.: TLC Publishing, 1997 ({{ISBN|1-883-089-00X}}).
2. ^James P. Gallagher, Trackside Maryland. Baltimore, Md.: Johns Hopkins University Press, 2003 ({{ISBN|0-8018-7323-1}}), p. 119.
3. ^Official Guide of the Railways. New York: National Railway Publication Co., February 1956, pp. 414–418.
{{Infobox B&O Named Trains}}{{ERIE named trains}}{{DEFAULTSORT:Washingtonian (BandO train)}}

8 : Named passenger trains of the United States|Passenger trains of the Baltimore and Ohio Railroad|Passenger trains of the Erie Railroad|Transportation in Cleveland|Transportation in Baltimore|Transportation in Pittsburgh|Railway services introduced in 1941|Railway services discontinued in 1956

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/14 2:42:58