  1. Project Cost

  2. Capacity

  3. Boiler Balance Work Of Stage -I

  4. References

  5. External links

{{Infobox power station
| name = Barh Super Thermal Power Station
| name_official =
| image = Barh Super Thermal Power Station.jpg
| image_size =
| image_caption = As seen from NH 30
| image_alt =
| location_map = India Bihar
| location_map_size =
| location_map_caption= Location of the Barh Super Thermal Power Station
| coordinates = {{coord|25|29|11.4|N|85|44|42.6|E|type:landmark|display=inline,title}}
| coordinates_ref =
| country = India
| location = Barh, Bihar
| status = O
| construction_began = 1999
| commissioned = October 2013
| decommissioned =
| cost =
| owner = NTPC
| operator =
| th_fuel_primary = Coal
| th_fuel_tertiary =
| ps_units_operational= 2 X 660 MW(Stage 2)

3 X 660 MW(Stage1) under construction


| ps_units_manu_model = Technopromexport (TPE)
BHEL
| th_cogeneration =
| th_combined_cycle =
| ps_electrical_capacity= 1,320 MW, 1,980 MW upcoming
| ps_electrical_cap_fac=
| website =
| extra =
}}Barh Super Thermal Power Station or NTPC Barh is located in Barh in the Indian state of Bihar.[1]

[2][3] NTPC Barh is located barely four kilometres east of the Barh sub-division on National Highway-31 in Patna district. The project has been named a mega power project, and is owned by Indian energy company National Thermal Power Corporation.

The 1,320MW (2x660 MW) Barh Stage-2 built by BHEL is operational while 1,980MW (3x660 MW) Barh Stage-1 is being built by Russian firm Technopromexport (TPE).

Bihar's share is 1183 MW from NTPC Barh(26% from stage 1 and 50% from stage 2).[4][4][5]

The main power plant and the township is spread over an area of 1,186 acres.The legal possession of 1,186 acres of land has been acquired for setting up the main power plant and its township which includes 12 villages.

The then PM, Atal Bihari Vajpayee, had laid the foundation stone of the main plant of stage-1 of NTPC Barh on March 6, 1999. The formal inauguration of its site office and laying of the foundation stone of the training centre at the plant site was done in September 2003.[6]

Project Cost

The plant is to produce 3,300MW of power at a cost of over Rs 26,000 crore.[7][8]

The total approved cost of stage-1 (660MWx3) has Rs 8,692.97 crore. The total approved cost of stage-2 (unit 1) plant is Rs 7,688.12 crore.

Capacity

Unit-1 of stage-2 commissioned in November 2013.[9] Unit-2 of stage-2 commissioned in March 2015. The first unit (of stage-I) of NTPC Barh is expected to start generation from December 2019 instead of the scheduled August 2020,[10] while the second and third units of stage-I will be made operational in December 2020 and August 2021, respectively.

Inland Waterways Authority of India received bids in 2013 September for coal movement on 1620 km National Waterway 1 (India) from Haldia to NTPC's Barh which is about 1000 km away.[11]
Stage Unit Number Capacity (MW) EPC Contractor Date of Commissioning Status
1st 1 660 Technopromexport To start from December 2019. Delayed as Technoproexport is saying it has entered a loss-making contract and is asking for $570 million before it can fulfil its obligation to which NTPC objected.[12]
2 660 Technopromexport To start from December 2020. Delayed
3 660 Technopromexport To start from August 2021.Delayed
2nd 4 660 Bharat Heavy Electricals 2013 November Running
5 660 Bharat Heavy Electricals 2015 March Running [13]
Total Five 3300

Boiler Balance Work Of Stage -I

Boiler Balance Work of Stage-I (3 x 660 MW)(BSTPP)


| 3 || 660 MW ||Boiler Erection Balance Work allotted to DOOSAN POWER SYSTEMS INDIA LTD,(KOREA) Company And The work is going under the contract Company M/s.Power Mech Projects Ltd., || March 2016 || Running [14]

[15]

References

1. ^{{cite news|last=Chaudhary|first=Pranava K.|title=Barh thermal power plant in a limbo|url=http://articles.timesofindia.indiatimes.com/2008-08-09/patna/27913290_1_barh-power-plant-super-thermal-power |accessdate=2013-11-29|work=The Times of India|date=2008-08-09}}
2. ^{{cite news|last=Chaudhary|first=Pranava K.|title=Bihar to get 5k MW by 2015|url=http://timesofindia.indiatimes.com/city/patna/Bihar-to-get-5k-MW-by-2015/articleshow/29571607.cms|accessdate=2014-08-20|work= The Times of India|date=30 January 2014}}
3. ^{{cite journal|last1=Bhaskar|first1=Uptal|title=TPE, Power Machines delay Barh project in Bihar|journal=The Wall Street Journal|date=2014-01-06|url=http://www.livemint.com/Industry/xR39VCxH9Ebn9uGAwlzoaJ/TPE-Power-Machines-delay-Barh-project-in-Bihar.html|accessdate=2014-08-20|series=Live Mint|publisher=H T Media}}
4. ^{{cite web|url=http://articles.economictimes.indiatimes.com/2013-10-09/news/42864314_1_nitish-kumar-power-generation-power-scenario|title=Power generation to be doubled to 4,000MW by next year: Nitish Kumar|work=Economic Times |agency=PTI|publisher=Bennett, Coleman & Co. Ltd.|date=2013-10-09 |accessdate=2013-11-29}}
5. ^{{cite web|author=Jayanta Gupta |url=http://timesofindia.indiatimes.com/business/india-business/Haldia-back-in-business-records-26-growth/articleshow/23551375.cms |title=Haldia back in business, records 26% growth|work=The Times of India |date= 2013-10-05|agency=TNN|accessdate=2013-11-29}}
6. ^{{cite news|last=Chaudhary|first=Pranava K.|title=Barh thermal power project finally gets underway|url=http://articles.timesofindia.indiatimes.com/2003-09-15/patna/27187755_1_thermal-power-project-barh-nabinagar | accessdate=2013-11-29|work=The Times Of India|date=2008-08-09}}
7. ^{{cite news|last=Roshan|first=Rakesh|title=50% allocation from Barh NTPC phase-II project|url=http://timesofindia.indiatimes.com/city/patna/50-allocation-from-Barh-NTPC-phase-II-project/articleshow/17355524.cms?referral=PM|accessdate=2013-11-09|work=The Times of India|agency=TNN|date=2012-11-25}}
8. ^{{cite web|author=Our Special Correspondent |url=http://www.telegraphindia.com/1120522/jsp/bihar/story_15515066.jsp#.Ulwv29KVODQ |title=CM sets off Barh countdown |work=The Telegraph, Calcutta|date=2012-05-22 |accessdate=2013-11-29}}
9. ^http://www.moneycontrol.com/news/announcements/ntpc-starts-its-operations-at-unit-i660-mwbarh-super-thermal-power-project-stage-il-_1000355.html
10. ^{{cite web|url=https://www.ndtv.com/india-news/uniform-pricing-of-power-ruled-out-says-power-minister-rk-singh-1938683|title=Uniform Pricing Of Power Ruled Out, Says Power Minister RK Singh}}
11. ^{{cite web|author=Santanu Sanyal |url=http://www.thehindubusinessline.com/industry-and-economy/logistics/iwai-receives-bids-for-coal-movement-for-ntpcs-barh-project/article5119138.ece |title=IWAI receives bids for coal movement for NTPC's Barh project|work=The Hindu Business Line|date=2013-09-12 |accessdate=2013-11-29}}
12. ^http://www.livemint.com/Industry/9jB1oseNZzEGfx7UxC8bRO/Barh-project-NTPC-alleges-mismanagement-at-Russian-stateow.html
13. ^http://economictimes.indiatimes.com/industry/energy/power/ntpc-commissions-fifth-unit-of-barh-thermal-project-in-bihar/articleshow/46465706.cms
14. ^https://www.business-standard.com/article/news-cm/ntpc-awards-balance-work-of-main-plant-package-for-barh-i-stpp-3x660-mw-116012901643_1.html
15. ^http://powermechprojects.in/about-us/23-latest-news-home-page.html

External links

  • NTPC Barh website
  • [https://www.youtube.com/watch?v=f4L10JXWL3g BSTPP Video]
{{Portalbar|Energy|India|Bihar}}{{NTPC Power Stations}}{{Power stations of Bihar}}{{India-powerstation-stub}}

2 : Coal-fired power stations in Bihar|Patna district

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/14 1:41:52