请输入您要查询的百科知识:

 

词条 Line 6 (Mumbai Metro)
释义

  1. Plans

  2. History

  3. Stations

  4. References

{{Use dmy dates|date=February 2019}}{{Use Indian English|date=February 2019}}{{refimprove
| date = April 2017

}}{{Infobox rail line


| box_width =
| name = Mumbai Metro Line 6
| other_name =
| native_name =
| native_name_lang =
| color =
| logo =
| logo_width =
| logo_alt =
| image =
| image_width =
| image_alt =
| caption =
| type = Rapid Transit
| system = Mumbai Metro
| status = Soil Testing, (under construction)
| locale = Western Suburbs, Mumbai
| start = Lokhandwala
| end = Kanjurmarg
| stations = 13
| routes =
| daily_ridership =
| ridership2 =
| open =
| event1label =
| event1 =
| event2label =
| event2 =
| event3label =
| event3 =
| owner = MMRDA
| operator =
| yearcommenced = {{start date and age|df=y|2017}}
| planopen = {{start date and age|df=y|2022}}
| character = Elevated
| depot =
| stock =
| linelength_km = 14.47
| tracklength_km=
| tracks =
| gauge = {{RailGauge|sg|allk=on}}
| load_gauge =
| minradius =
| racksystem =
| routenumber =
| linenumber =
| electrification =
| speed_km/h =
| elevation_m =
| elevation_ft =
| elevation =
| website =
| map =
| map_name = map_name
| map_state = uncollapsed
}}

Line 6 of the Mumbai Metro, or the Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg Line, is part of the metro system for the city of Mumbai, India. This line is fully elevated.

Plans

The 14.47 km long Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg Metro-VI corridor is to have 13 stations and cost Rs. 6,672 crore. It is to be an elevated corridor.

It is to connect Swami Samarth Nagar-Lokhandwala in Andheri in the western suburbs to Vikhroli and Kanjurmarg in the eastern suburbs. The stations include Lokhandwala Complex, Adarsh Nagar, Momin Nagar, JVLR, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjurmarg (W) and Vikhroli-Eastern Express Highway. Metro 6 is to provide interchange with Metro 2 at Infinity Mall in Andheri, with Metro 3 at SEEPZ, with Metro 4 at Vikhroli and the Mumbai Suburban Railway at Jogeshwari on Western rail and Kanjurmarg on Central railway, and with Metro 7 at JVLR. Construction is to begin by December 2018.[1] [2] It is to be ready by 2021-22.[3]

History

The line was approved by Chief Minister Fadnavis on 19 October 2016. The MMRDA issued a tender to conduct a detailed aerial mapping survey of the alignment in April 2017. Authorities were to determine the location of trees along the alignment with an accuracy of up to 10 cm, utilizing a differential GPS (DGPS), while a digital aerial triangulation system is to help determine the types of trees, their heights and diameters.[4]

Stations

The line will consist of 13 stations starting from Swami Samarth Nagar in Lokhandwala Complex, Andheri (West) to Vikhroli (East). It will have interchanges with Lines 2, 7, 3 and 4.[5]

# Station Interstation Distance Grade Connections
1 Swami Samarth Nagar 0|km|mi}} Elevated None
2 Adarsh Nagar0.7288|km|mi}} Elevated Line 2 (Planned)
3 Jogeshwari (West) 0.9891|km|mi}} Elevated None
4 Jogeshwari-Vikhroli Link Road 1.598|km|mi}} Elevated Line 7 (Planned)
5 Shyam Nagar0.9619|km|mi}} Elevated None
6 Mahakali Caves 1.5478|km|mi}} Elevated None
7 SEEPZ Village 1.1228|km|mi}} Elevated Line 3 (Planned)
8 Saki Vihar Road 1.1363|km|mi}} Elevated None
9 Rambaug 1.0122|km|mi}} Elevated None
10 Powai Lake 0.8493|km|mi}} Elevated None
11 IIT Powai 1.0644|km|mi}} Elevated None
12 Kanjurmarg (West) 1.658|km|mi}} Elevated Line 4 (Planned)
13 Vikhroli (EEH) 1.056|km|mi}} Elevated None

References

1. ^{{cite web|url=https://www.hindustantimes.com/mumbai-news/work-on-mumbai-s-metro-6-corridor-to-kick-off-by-december/story-Jy02EAYKph8NPu1Tj1EEHK.html|title=Work on Mumbai’s Metro-6 corridor to kick off by December|website=hindustantimes.com|accessdate=13 August 2018}}
2. ^{{cite web|url=http://indianexpress.com/article/cities/mumbai/mumbai-mmrda-plans-to-begin-work-on-five-more-metro-lines-by-december-4602883/|title=Mumbai: MMRDA plans to begin work on five more Metro lines by December|date=7 April 2017|website=The Indian Express|accessdate=7 April 2017}}
3. ^{{cite web|title=Mumbai’s east-west connectivity to get a boost with another Metro corridor|url=http://www.hindustantimes.com/mumbai-news/mumbai-s-east-west-connectivity-to-get-a-boost-with-another-metro-corridor/story-TYqh3bLxtzHek6IJtjfYaM.html|website=hindustantimes.com|accessdate=2 March 2017|language=en|date=2 March 2017}}
4. ^{{cite web|title=MMRDA to begin tree count for Metro 6|url=http://www.mid-day.com/articles/mmrda-to-begin-tree-count-for-metro-6/18142172|website=mid-day|accessdate=6 April 2017|language=en}}
5. ^{{cite web |title=DPR for Line 6 |url=https://mmrda.maharashtra.gov.in/documents/10180/9283015/Metro+Line+6+DPR/17c5ed14-e9fb-4920-9521-02eebb25c4a9 |publisher=MMRDA}}
{{Mumbai Metro navbox}}{{India-rail-transport-stub}}

1 : Mumbai Metro lines

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/10 23:27:32