请输入您要查询的百科知识:

 

词条 Bureya Dam
释义

  1. History

  2. Description

  3. See also

  4. External links

  5. References

{{Infobox dam
| name = Bureya Dam
| name_official = Бурейская ГЭС
| image = BureyaHPP9.jpg
| image_size =
| image_caption =
| image_alt =
| location_map = Russia Amur Oblast#Russia
| location_map_size =
| location_map_caption =
| coordinates = {{coord|50|16|09|N|130|18|48|E|type:landmark|display=inline,title}}
| country = Russia
| location = Far East
| status = O
| construction_began = 1976
| opening = 2009
| demolished =
| cost =
| owner = RusHydro
| dam_type = Gravity dam
| dam_height = {{convert|140|m|ft|0|abbr=on}}
| dam_height_thalweg =
| dam_height_foundation=
| dam_length = {{convert|736|m|ft|0|abbr=on}}
| dam_width_crest =
| dam_width_base =
| dam_volume =
| dam_elevation_crest =
| dam_crosses = Bureya River
| spillway_count =
| spillway_type =
| spillway_capacity =
| res_name =
| res_capacity_total = {{convert|20.94|km3|mi3|2|abbr=on}}[1]
| res_capacity_active =
| res_capacity_inactive=
| res_catchment =
| res_surface = {{convert|750|km2|sqmi|0|abbr=on}}[1]
| res_elevation =
| res_max_depth =
| res_max_length =
| res_max_width =
| res_tidal_range =
| plant_operator =
| plant_commission =
| plant_decommission =
| plant_type =
| plant_turbines = 6 × 335 MW
| plant_capacity = 2,010 MW
| plant_annual_gen =
| website =
| extra =
}}

The Bureya Dam (locally referred to as Bureyskaya, {{lang-ru|Бурейская ГЭС}}) is a hydroelectric dam on the Bureya River in the Russian Far East.

History

Bureya hydroelectric power station was built by Bureyagesstroy.[1] Construction started in 1976, but was halted until 1999. In 1999, RAO UES restarted the project. The dam was completed and the first unit was launched in 2003.[1] The construction of the whole complex was completed in 2009.[2]

The reservoir reached its specified level during the summer-autumn monsoon season of 2009. It was accompanied with first use of spillways during planned tests. Despite the fact that all primary construction works on power station was completed, it was officially commenced for exploitation by government commission in 2011. Therefore, officially, the complex is still under construction.

Description

Bureya Dam is a gravity dam with height of {{convert|140|m}} and crest length of {{convert|736|m}}.[3][4]

The power station has an installed capacity of {{nowrap|2010 MW}}, the full capacity. Power is generated by utilizing six turbines, each with a capacity of {{nowrap|335 MW}}. The facility is owned by RusHydro.

See also

{{stack|{{Portal|Russia|Water|Renewable energy}}}}
  • List of conventional hydroelectric power stations
  • List of power stations in Russia

External links

{{commons category|Bureya hydroelectric power plant}}
  • {{Official website|http://www.burges.rushydro.ru/}}

References

1. ^{{cite web | title= Dam Development in Russia | work= Amur-Heilong River Basin Information Center | url= http://amur-heilong.net/http/01_climate_waters/0123RussiaHydro.html | accessdate= 2011-01-22 | deadurl= yes | archiveurl= https://web.archive.org/web/20100816234342/http://amur-heilong.net/http/01_climate_waters/0123RussiaHydro.html | archivedate= 2010-08-16 | df= }}
2. ^{{cite web | title= Bureisk HPP | publisher= Bureyagesstroy | url= http://www.bgess.ru/en/objects/text.php?n=6 | accessdate = 2011-01-22}}
3. ^http://www.burges.rushydro.ru/hpp/general/
4. ^{{cite web | title= Bureya Dam | work = International Database and Gallery of Structures | url= http://en.structurae.de/structures/data/index.cfm?id=s0021053 | accessdate = 2011-01-22}}
{{Authority control}}

6 : Dams in Russia|Hydroelectric power stations in Russia|Buildings and structures in the Russian Far East|Energy in the Russian Far East|Buildings and structures in Amur Oblast|Dams completed in 2009

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/13 20:08:29