  1. Description

  2. History

     New platforms  HS2 

  3. National Rail services

  4. Manchester Metrolink

     Services   Ticket zones  

  5. References

  6. External links

     National rail  Metrolink 
{{Use dmy dates|date=October 2018}}{{Use British English|date=November 2017}}{{Infobox UK station
| symbol = rail|symbol2=metrolink
| name = Manchester Airport
| image_name = The Station - geograph.org.uk - 511890.jpg
| caption =
| manager = TransPennine Express
| code = MIA
| dft_category = B
| locale = Ringway
| borough = Manchester
| pte = Transport for Greater Manchester
| zone =
| platforms = 4


| usage1314 = {{increase}} 3.322
| usage1415 = {{increase}} 3.461
| usage1516 = {{increase}} 3.632
| usage1617 = {{increase}} 4.241
| usage1718 = {{increase}} 4.645
| years = May 1993
| events = Opened
| years1 = 2004
| events1 = Refurbished
| years2 = 2008
| events2 = Third platform opened
| years4 = 2014
| events4 = Metrolink services begin
| years5 = 2015
| events5 = Fourth platform added
| gridref = SJ819853}}

Manchester Airport station is a railway and tram station at Manchester Airport, England which opened at the same time as the second air terminal in 1993. The station is {{convert|9+3⁄4|mi|km}} south of Manchester Piccadilly, situated at the end of a short branch from the Styal Line which is accessed via a triangular junction between Heald Green and Styal stations. Manchester Metrolink tram services were extended to the airport in November 2014 and operate to Manchester Victoria.

Description

The station is {{convert|9+3/4|mi|km}} south of {{stnlink|Manchester Piccadilly}} at the end of a short branch from the Styal Line constructed by British Rail in 1993. A branch of Manchester Metrolink runs into it. It is accessed via a triangular junction located between {{stnlink|Heald Green}} and {{stnlink|Styal}}. The station platforms are connected by escalator, lift, ramps and an elevated covered walkway (known as the "Sky Link") to the airport terminal buildings in which is a manned railway ticket office. Throughout the airport complex, the railway station is known as "The Station" and is signposted as such.

History

New platforms

In December 2008, a third platform opened after a year of construction and a total cost of £15 million. The following year Network Rail noted that it had "greatly increased operational flexibility at the station, and reduced the number of times that late-running trains had had to be terminated at Manchester Piccadilly."[1]

In 2009, Network Rail stated that the creation of the third platform has meant that the capacity at Manchester Airport will become constrained by the layover of the trains and congestion at the throat. To solve this issue they have recommended building a line underneath the airport towards Northwich in the 2019 to 2024 period.[2]

In July 2012, support for a fourth rail platform was announced by the Government.[3] The current platforms are eight carriage lengths long, so each can accommodate two trains of four carriages. A fourth platform will allow greater use of longer trains of six carriages or more. This had been recommended as part of the Northern Hub scheme of rail improvements around Manchester by the 2010 Manchester Hub Rail Study and the 2011 Northern Route Utilisation Strategy, with an estimated cost of £23 million.[4]

In February 2014, construction commenced on a new £20m fourth platform at the station. The start of construction was attended by the Chancellor of the Exchequer, George Osborne. Construction of the new platform was completed in May 2015 - three years earlier than the 2018 estimate given in 2012.[5][6] This was to allow engineering work to overlap with that being done on the Manchester Metrolink extension to the airport (see below) so that the fourth platform could be used for the extra traffic generated by the Ordsall Chord (opened 10 December 2017), while the fourth platform itself opened to passengers in Autumn 2015.[7][8]

HS2

{{Main Article|Manchester Interchange}}

In January 2013, the Government announced that Manchester Airport would be included in the second phase of the High Speed 2 railway line. This will enable Manchester Airport to be reached from London Euston in 59 minutes. The new line and associated new station will pass to the west of the Airport, away from the existing railway station and transport interchange, giving the airport two disconnected railways stations approximately 1 mile apart. [9]

National Rail services

Northern, TransPennine Express and Transport for Wales are the three current franchise holders that serve Manchester Airport. Services between the airport and Crewe (for connections to Southern England); Manchester Piccadilly; various destinations throughout Northern England and, since December 2007, to {{stnlink|Glasgow Central}} and {{stnlink|Edinburgh Waverley}} via {{stnlink|Carlisle}}.

There is a frequent service from the airport to Manchester Piccadilly. Services also operate during the night to Manchester Piccadilly and beyond including {{stnlink|York}}; {{stnlink|Doncaster}}; {{stnlink|Sheffield}}; Scotland and {{stnlink|Blackpool North}}.

There are currently nine trains per hour to Manchester Piccadilly. There are no long distance services to the airport from the south; a Central Trains service from Manchester Airport to {{stnlink|Skegness}} via {{stnlink|Derby}} was cut back to {{stnlink|Crewe}} in 2003.[10],there was also Virgin Crosscountry services from Birmingham New Street to Edinburgh or Glasgow, the Birmingham Services were cut in 2003 and the Scotland services were transferred to TransPennine Express in 2007.

In May 2016, Arriva Trains Wales began operating an hourly (off peak) Monday - Saturday service to Llandudno via Chester. It now operates 57 services a week compared to the previous 17. First TransPennine Express previously ran the service to Blackpool North but this was passed on to the new Northern franchise in April 2016.

It was planned that infrastructure developments that are part of the Northern Hub system of schemes such as the Ordsall Chord should enable direct trains to {{stnlink|Manchester Victoria}} and on towards Bradford from May 2019. However the introduction of the May 2018 timetable, one of the most radical in decades, caused punctuality through Manchester to drop sharply and it became common for TransPennine Express to terminate delayed services at Manchester Piccadilly rather than continue onto the final destination at Manchester Airport.[11][12]

Any future additional services to the Airport are in doubt without further infrastructure works; unresolved issues surround the lack of new 'through' platforms at Manchester Piccadilly which have been shelved by the government and the Styal Line to Manchester Airport operating at full capacity with little resilience to absorb delays.[13]

Manchester Metrolink

{{Infobox Manchester Metrolink station
| name = Manchester Airport
| image_name = Manchester Airport Metrolink station (2) (2).jpg
| caption = Metrolink platforms
| locale = Ringway
| borough = City of Manchester
| Metrolink Zone = 4
| Metrolink line = 2
| status = 1
| platforms = 2
| open = 3 November 2014
| map_state = collapsed
| label_position = right
| coordinates = {{coord|53.365|-2.2731|type:railwaystation_region:GB-MAN|display=inline}}
}}

The Manchester Metrolink light rail network was extended from St Werburgh's Road to Manchester Airport as part of the Phase 3 expansion project.[14] The Metrolink station has been built adjacent to the airport station.[15] It is the terminus of the Airport Line.

Following a period of uncertainty due to funding problems, the plans were finally given the go-ahead in May 2009. The confirmed route would not complete the full airport loop as proposed, but trams would run along the northern route via Wythenshawe. Completion of the western side of the loop is subject to further funding in a later project.[16][17] An opening date of Summer 2016 had originally been indicated for opening of the Airport line[18] but the line opened early on 3 November 2014.[19][20]

Services

Trams run between Manchester Airport and Victoria every 12 minutes. An early morning service runs from 03:19–06:00 am every 20 minutes.

Ticket zones

From January 2019, Manchester Airport will be in Metrolink ticket zone 4 {{Update after|2019|01|13|reason=update to present tense}}.[21]

References

1. ^Connecting local communities: Route Plan 2009 for Route 20 - North West Urban, Network Rail, 2009; page 6
2. ^Connecting local communities: Route Plan 2009 for Route 20 - North West Urban, Network Rail, 2009; page 27
3. ^Historic day for Greater Manchester's rail network, Transport for Greater Manchester, 16 July 2012
4. ^[https://web.archive.org/web/20141023011612/http://www.networkrail.co.uk/6485_ManchesterHubRailStudy.pdf Manchester Hub Rail Study], Network Rail, February 2010
Northern Route Utilisation Strategy, Network Rail, May 2011, page 7 and pp. 55-56
5. ^{{cite web |title=Chancellor unveils the start of £600m rail investment in the north of England |url=http://www.networkrailmediacentre.co.uk/news/chancellor-unveils-the-start-of-600m-rail-investment-in-the-north-of-england |work=Network Rail |date=7 February 2014 |accessdate=22 February 2017}}
6. ^{{cite web|title=Manchester Airport station reopens after work to build a fourth platform is completed (news release)|url=http://www.networkrailmediacentre.co.uk/News-Releases/Manchester-Airport-station-reopens-after-work-to-build-a-fourth-platform-is-completed-2279.aspx|website=Network Rail|accessdate=13 February 2015|archiveurl=https://web.archive.org/web/20150213181617/http://www.networkrailmediacentre.co.uk/News-Releases/Manchester-Airport-station-reopens-after-work-to-build-a-fourth-platform-is-completed-2279.aspx|archivedate=13 February 2015|date=9 February 2015}}
7. ^{{cite web|url=http://www.railengineer.uk/2015/03/10/and-then-there-were-4/ |title=And then there were 4}}
8. ^{{cite news|url=http://www.manchestereveningnews.co.uk/news/manchester-airport-rail-stations-fourth-9874192 |title=Manchester Airport rail station's fourth platform completed ahead of schedule}}
9. ^https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/69079/hs2-msg-ma0-zz-dr-rt-52805.pdf
10. ^{{cite news|url=http://news.bbc.co.uk/1/low/uk/2663117.stm|title=Train services to be cut|date=17 February 2003|work=BBC News}}
11. ^{{Cite web |title='Unacceptable #NorthernFail' - the travel chaos passengers faced on first working day of new Northern timetable |url=https://www.manchestereveningnews.co.uk/news/greater-manchester-news/northern-rail-cancellations-delays-timetables-14684445 |work=Manchester Evening News |date=21 May 2018 |accessdate=21 May 2018}}
12. ^{{Cite web |title=A big chunk of Northern's timetable is back on Monday - but not for many Greater Manchester passengers |quote=As an industry we are really sorry for the impact that this has had on customers. Congestion on the network within the Manchester area has been a factor in the disruption and as all our services run through this corridor this caused a knock-on effect on our services across the North. |url=https://www.manchestereveningnews.co.uk/news/big-chunk-northerns-timetable-back-14962403 |work=Manchester Evening News |date=29 July 2018}}
13. ^{{Cite web |title=Timetable recast: too much, too quickly |url=https://www.railwaygazette.com/news/news/uk/single-view/view/too-much-too-quickly.html |work=Railway Gazette |date=4 June 2018 |accessdate=13 August 2018}}
14. ^{{cite web|url=http://www.bbc.co.uk/manchester/travel/images/metrolink_map_2006.pdf |archive-url=https://web.archive.org/web/20060717221919/http://www.bbc.co.uk/manchester/travel/images/metrolink_map_2006.pdf |dead-url=yes |archive-date=17 July 2006 |title=Metrolink Future Network |year=2006 |publisher=GMPTE |accessdate=28 December 2008 |df= }} - map of the proposed network expansion
15. ^{{cite web|url=http://img334.imageshack.us/img334/3156/metrolinksouthmanchestermanche.jpg|archive-url=https://web.archive.org/web/20110720181353/http://img334.imageshack.us/img334/3156/metrolinksouthmanchestermanche.jpg|dead-url=yes|archive-date=20 July 2011|title=Metrolink Network - proposed South Manchester & Manchester Airport extension (map)|year=2005|publisher=GMPTE|accessdate=21 May 2009}}
16. ^{{cite news|url=http://www.bbc.co.uk/manchester/content/articles/2009/05/13/130509_metrolink_map_plan_b_feature.shtml |title=Metrolink: back on track?|date=13 May 2009|publisher=BBC Manchester|accessdate=17 May 2009}}
17. ^{{cite news|url=http://www.manchestereveningnews.co.uk/news/s/1115242_14bn_transport_deal_unveiled |archive-url=https://archive.is/20121223160731/http://www.manchestereveningnews.co.uk/news/s/1115242_14bn_transport_deal_unveiled |dead-url=yes |archive-date=23 December 2012 |title=£1.4bn transport deal unveiled |last=Linton |first=Deborah |date=13 May 2009 |publisher=Manchester Evening News |accessdate=17 May 2009 }}
18. ^{{cite web|url=http://www.metrolink.co.uk/futuremetrolink/Pages/airport-line.aspx |archive-url=https://web.archive.org/web/20121113051229/http://www.metrolink.co.uk/futuremetrolink/Pages/airport-line.aspx |dead-url=yes |archive-date=13 November 2012 |title=Airport line |work=Manchester Metrolink |publisher=Transport for Greater Manchester |accessdate=19 May 2013 |df= }}
19. ^{{cite web|title=Trams to Manchester Airport to arrive more than A YEAR early|url=http://www.tfgm.com/Corporate/media_centre/Pages/News.aspx?articleId=468|publisher=Transport for Greater Manchester|accessdate=20 June 2014}}
20. ^{{cite news|url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/new-metrolink-line-wythenshawe-manchester-7927130 |title=New Metrolink line to Wythenshawe and Manchester Airport to open on November 3 – a year ahead of schedule |publisher=Manchester Evening News |date=13 October 2014 |deadurl=yes |archiveurl=https://web.archive.org/web/20141018021056/http://www.manchestereveningnews.co.uk/news/greater-manchester-news/new-metrolink-line-wythenshawe-manchester-7927130 |archivedate=18 October 2014 |df= }}
21. ^{{cite web |title=Metrolink ticket zones map |url=https://www.tfgm.com/public-transport/tram/maps/zones-map |website=TfGM |accessdate=5 December 2018}}

External links

{{commons category|Manchester Airport station}}

National rail

{{stn art lnk|MIA}}
  • TransPennine Express Official web site

Metrolink

  • [https://web.archive.org/web/20121113051229/http://www.metrolink.co.uk/futuremetrolink/Pages/airport-line.aspx Metrolink airport line extension proposals], TfGM
  • [https://tfgm.com/public-transport/tram/stops/manchester-airport-tram Metrolink stop information]
  • [https://tfgm.com/public-transport/tram/stops/manchester-airport-tram/local-map Manchester Airport area map]
  • [https://tfgm.com/public-transport/tram/stops/manchester-airport-tram/stop-map Manchester Airport Metrolink station plans]
{{rail start}}{{rail line
|next=East Didsbury
|route=Transport for Wales
Chester to Manchester Line
|col={{KAW colour}}
}}{{rail line
|next={{rws|Manchester Piccadilly}} or
{{rws|Gatley}} or
{{rws|East Didsbury}}
|route=TransPennine Express
North TransPennine
TransPennine North West

|col={{TPX colour}}
}}{{rail line
|next={{rws|Manchester Piccadilly}} or
{{rws|Burnage}}
|route=TransPennine Express
South TransPennine
|col={{TPX colour}}
}}{{rail line
|next={{rws|Heald Green}} or
{{rws|East Didsbury}}
|route=Northern
Manchester to Preston line
|col={{Northern colour}}
}}{{rail line
|next={{rws|Mauldeth Road}} or
{{rws|East Didsbury}}
|route=Northern
Liverpool to Manchester via Warrington
|col={{Northern colour}}
}}{{rail line one to two
|next1=Heald Green
|next2=Styal
|previous=Train Reverses
|route=Northern
Styal Line
Liverpool to Manchester Line
Manchester to Crewe line

|col={{Northern colour}}
}}{{s-note|text=Future services}}{{rail line four routes |route1=Northern Connect
Liverpool Lime Street - Manchester Airport |route2=Northern Connect
Barrow-In-Furness/Windermere - Manchester Airport|next={{rws|Manchester Piccadilly}} |route3=Northern Connect
Bradford Interchange - Manchester Airport |route4=Northern Connect
Blackpool North - Manchester Airport |col={{Northern colour}} |lightcol1={{Northern colour|Liverpool-Manchester Airport}} |lightcol2={{Northern colour|Barrow-Manchester Airport}} |lightcol3={{Northern colour|Bradford-Manchester Airport}} |lightcol4={{Northern colour|Blackpool-Manchester Airport}} }}{{s-rail|title=MML}}{{S-line|system=MML|line=Manchester Airport - Deansgate-Castlefield|next=Shadowmoss|type=Manchester Airport|type2=Deansgate-Castlefield}}{{S-line|system=MML|line=Manchester Airport – Victoria|next=Shadowmoss|type=Manchester Airport|type2=Victoria}}{{s-note|text=Proposed}}{{s-line|system=MML|line=Manchester Airport|previous=Shadowmoss|next=Davenport Green|type=Cornbrook|type2=Roundthorn}}{{s-end}}{{UK Airport stations}}{{Greater Manchester main railway stations}}{{Greater Manchester Metrolink stations}}{{Manchester B&S}}{{coord|53|21|54|N|2|16|23|W|type:railwaystation_region:GB|display=title}}

9 : Railway stations in Manchester|Railway stations opened in 1993|Airport railway stations in the United Kingdom|Railway stations served by Northern (train operating company)|Railway stations served by TransPennine Express|Railway stations served by Transport for Wales Rail|Tram stops in Manchester|Railway stations opened by British Rail|Manchester Airport

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/10 23:00:59