  1. Construction

  2. Technical features

  3. Safety

  4. Stations

  5. Rolling stock

  6. See also

  7. References

  8. External links

{{Infobox rail line
| box_width = 25em
| name = M3 Kirazlı–Olimpiyat–Başakşehir
| color = 0ca6df
| logo = Istanbul_M3_Line_Symbol.png
| logo_width = 30px
| logo_alt =
| image = Mahmutbey Metro Station.jpg
| image_width = 275
| image_alt =
| caption = Mahmutbey station
| type = Rapid transit
| system = İstanbul Metro
| status = Operating
| locale = İstanbul, Turkey
| start = Kirazlı-Bağcılar
| end = Başakşehir-Metrokent / Olimpiyat
| stations = 11[1]
| routes = 2
| daily_ridership =
| ridership2 =
| open = {{start date and age|2013|06|14}}
| close =
| owner = İstanbul Metropolitan Municipality
| operator = Metro Istanbul A.Ş.
| character =
| depot = Olimpiyatköy
| stock = 80 Alstom Metropolis[1]
4 carriages per trainset
| linelength_km = 15.9
| linelength =
| tracklength_km=
| tracklength_mi=
| tracklength =
| tracks = 2
| gauge = {{Track gauge|sg|allk=on|nowrap=on}}
| old_gauge =
| load_gauge =
| minradius =
| racksystem =
| linenumber = M3
| electrification = 1,500 V DC Overhead line
| speed_km/h =
| speed =
| elevation_m =
| elevation =
| website = [https://www.metro.istanbul/Hatlarimiz/HatDetay?hat=M3 M3]
| map = {{M3 (Istanbul)}}
| map_state = open
}}

The M3, officially referred to as the M3 Kirazli–Olimpiyat–Basaksehir Metro Line ({{lang-tr|M3 Kirazlı–Olimpiyat–Başakşehir Metro Hattı}}), is a {{convert|15.9|km|mi|adj=on}}, 11-station[1] rapid transit line of the İstanbul Metro system on the European part of Istanbul, Turkey. It operates between Kirazlı-Bağcılar, extending the service of the M1B line from Aksaray, to Başakşehir-Metrokent or Olimpiyat, branching off at the İkitelli Sanayi junction station. The M3-line is colored light blue on station signs, route signs and the official rapid transit network map.[1]

Construction

The construction of the line began in 2006 following the signing of the related contract in May of that year. By March 2009, the tunnels were completed. The rolling stock was delivered in January 2010, and in December of the same year, the first test run of the trains was accomplished. The line's operation rights were transferred from the İETT bus authority to İstanbul Ulaşım company in June 2011. After the line signalization system was completely installed in March 2012, test runs began in June 2012.[1] On September 11, 2012, the M3-line started operating unofficially.[2] The M3-line went into service officially on June 14, 2013.[3][4]

Ziya Gökalp Mahallesi Station is the only underground station bored in situ without removing the ground above, while all other underground stations on the line are built by cut-and-cover method, constructed in a shallow trench and then covered over. The line's tunnels are twin tubes. The line between Kirazlı and MetroKent was constructed by tunnel boring machine (TBM) while the line between Sanayi Mahallesi and Olimpiyat Parkı was built using the New Austrian Tunnelling method (NATM).[1]

Technical features

The M3 line is {{convert|15.9|km|mi|adj=on}} long, serving 11 stations in total.[1] The operation control center of the M3-line is situated in MetroKent Terminal. The rolling stock and maintenance depots are located in Olimpiyatköy beyond Olimpiyat Parkı Terminal, stretching over an area of ({{convert|70000|m2|sqft|abbr=on}}). The rolling stock depot is capable of holding 180 cars. The maintenance workshop occupies a covered area of {{convert|10000|m2|sqft|abbr=on}}.[1]

The rolling stock was delivered by the French company Alstom. The fully air-contioned cars, costing each {{Euro}}1.149 million, feature seats covered with antibacterial textile material. It is possible to pass from one car to another in a train to enable a homogeneous distribution of the passenger crowd.[5]

A total of 80 cars, 20 sets of four-car trains, are able to transport up to 70,000 passenger per hour per direction[6] between the operating hours from 6:00 h in the early morning to 0:00 h in the midnight. The ride between the terminals Kirazlı and MetroKent takes 20 minutes. The trains run every five minutes during rush hours.[1]

Safety

All the stations are equipped with closed-circuit video system for continuous monitoring of the platforms. High-level fire safety systems, which include automatic fire extinguishers and fire exits, are installed in the metro line, where non-flammable and fireproofing materials were used.[1]

Power supply of the line is provided at two different points. In case of power cut at both supply points, an emergency power system that becomes operational within 15 seconds, ensures running of the trains until the next station. If the backup generator system fails, an uninterruptible power source (UPS) supplies energy for emergency lighting and the electronic devices at the operations control center up to three hours. The signalization of the metro line as well as at the depots and railroad switches, also the vehicle drive-control systems are fully automated. However, they can be handled manually when needed.[1]

Stations

The stations with {{convert|180|m|ft|abbr=on}} long platforms are suitable for even 8-car trains.[4] Mahmutbey Station has a third track available for parking or overnight stay of trains. İkitelli Sanayi Station, which is a junction station, features two platforms and four tracks. Olimpiyat Terminal has two platforms and three tracks.[1]

All the stations are painted in different colors, and fitted with escalators and elevators for disabled persons.[3][4]

Metro Line M3
StationTransfers
Color to MetroKent Color to Olimpiyat Parkı
#900020|border=darkgray}}Kirazlı(M1B) Yenikapı–Kirazlı
Purple|border=darkgray}}Yenimahalle
#177245|border=darkgray}}Mahmutbey(M7) Kabataş–Mahmutbey (2018)
Orange|border=darkgray}}İSTOÇ
Violet|border=darkgray}}İkitelli Sanayi(M9) Ataköy–İkitelli (2019)
Magenta|border=darkgray}}Turgut Özal White|border=darkgray}}Ziya Gökalp Mahallesi
Red|border=darkgray}}Siteler {{Color box|Blue|border=darkgray}}Olimpiyat
#fbec5d|border=darkgray}}Başak Konutları
Yellow|border=darkgray}}MetroKent
  • Kirazlı Terminal {{coord|41|01|59|N|28|50|32|E|display=inline}}
  • MetroKent Terminal {{coord|41|06|27|N|28|48|05|E|display=inline}}
  • Olimpiyat Parkı Terminal {{coord|41|04|57|N|28|45|35|E|display=inline}}

Rolling stock

This line is operated by Alstom trains which are visually similar to the AM5-M2 and AM4-M4 trains also built by Alstom that operate on the Budapest Metro. The main difference is that the Istanbul units are equipped with pantographs for overhead line operation only while the Budapest units are equipped with shoegear for third rail operation only.[1]

See also

  • Istanbul modern tramways
  • Istanbul nostalgic tramways
  • Marmaray
  • Public transport in Istanbul

References

1. ^10 11 12 {{cite web |url=http://www.istanbululasim.com.tr/rayl%C4%B1-sistemler/m3-ba%C5%9Fak%C5%9Fehir-olimpiyatk%C3%B6y.aspx|publisher=İstanbul Ulaşım |title=M3 Başakşehir Metro Hattı |language=Turkish |accessdate=2015-12-11}}
2. ^{{cite news |url=http://www.dubleyol.com/basaksehir-kirazli-metrosu-acildi/ |newspaper=Duble Yol |title=Başakşehir-Kirazlı Metrosu Açıldı |date=2012-09-11 |language=Turkish |accessdate=2013-11-15 }}
3. ^{{cite news |url=http://www.sabah.com.tr/Gundem/2013/06/14/istanbula-yeni-metro |newspaper=Sabah |title=İstanbul'a yeni metro |date=2013-06-14 |language=Turkish |accessdate=2013-11-15 }}
4. ^{{cite web |url=http://www.ibb.gov.tr/tr-TR/Pages/Haber.aspx?NewsID=21231#.UoYdqOJab2Q |publisher=İstanbul Büyükşehir Belediyesi |title=İstanbullular yeni metro hattına kavuşuyor... |date=2013-06-13 |language=Turkish |accessdate=2013-11-15 }}
5. ^{{cite web |url=http://www.ibb.gov.tr/tr-TR/Pages/Haber.aspx?NewsID=15044#.UoYVV-Jab2Q |publisher=İstanbul Büyükşehir Belediyesi |title=İstanbul’a 68 tane hijyenik metro aracı |date=2007-10-02 |language=Turkish |accessdate=2013-11-15 }} |
6. ^{{Cite web|url=https://www.metro.istanbul/Hatlarimiz/HatDetay?hat=M3|title=M3 Kirazlı-Olimpiyat-Başakşehir Metro Hattı|last=|first=|date=|website=www.metro.istanbul|archive-url=|archive-date=|dead-url=|access-date=2019-02-14}}

External links

  • {{Official website|http://www.istanbululasim.com.tr/rayl%C4%B1-sistemler/m3-ba%C5%9Fak%C5%9Fehir-olimpiyatk%C3%B6y.aspx|İstanbul Ulaşım – M3 Kirazli–Basaksehir–Olimpiyatkoy Metro Line (official webpage)}}
{{Public Transport in İstanbul}}

5 : Istanbul Metro|Bağcılar|Başakşehir|Railway lines opened in 2013|2013 establishments in Turkey