词条 | Abbey Line | |||||||||||||||||||||||||||
释义 |
|name = Abbey Line |color = |logo = |logo_width = |image = London Midland 319216 at St Albans Abbey.jpg |image_width = 270px |caption = London Midland 319216 at {{stnlnk|St Albans Abbey}} in 2017 |type = Heavy rail |system = National Rail |status = Operational |locale = Hertfordshire |start = Watford Junction |end = St Albans Abbey |stations = 7 |routes = |daily_ridership = |open = 5 May 1858 |close = |owner = Network Rail |operator = London Northwestern Railway |character = |depot = |stock = Class 319 |linelength = {{convert|6|mi|45|ch|km|abbr=on|1}} |tracklength = |tracks = |gauge = {{track gauge|uksg|allk=on}} |electrification = 25 kV AC OHLE |speed = {{convert|50|mph|abbr=on|0}} maximum |elevation = |map = |map_state = }}{{Abbey Line}} The Abbey Line, also called the St Albans Abbey branch line, is a railway line from Watford Junction to St Albans Abbey. The {{convert|6.5|mi|adj=on}} route passes through town and countryside in the county of Hertfordshire, just outside the boundaries of the Oyster Card and London fare zones.[1] Its northern terminus in St Albans Abbey is located in the south of the city, around {{convert|1.2|km}} away from the larger St Albans City railway station on the Midland Main Line. The Abbey line is a semi-rural line and, due to its single-track operation, service frequencies are limited. The service is sometimes referred to locally as the Abbey Flyer.[2] HistoryThe line was opened by the London and North Western Railway (LNWR) on 5 May 1858 and was the first railway to reach St Albans.[3] Originally there were two intermediate stations:
In 1910 a station at Callowland opened, now {{stnlnk|Watford North}}. In 1924 the terminus at St Albans became {{stnlnk|St Albans Abbey}} to distinguish it from the Midland Railway main line station at {{stnlnk|St Albans City}}, which opened in 1868. The LNWR station was also served by a branch of the Great Northern Railway from {{stnlnk|Hatfield}}. A sixth station was added at Garston in 1966 and a seventh at How Wood in 1988, to coincide with the electrification of the route at 25 kV AC overhead. Past connectionsThe line was built in its current form: a branch from Watford to St. Albans. However, the line was at times connected to two other lines. One, the Hatfield and St Albans Railway, opened in 1865 from St. Albans Abbey station to the East Coast main line at Hatfield. Mostly a local route, the construction of the Midland main line ensured that it never became popular with the critical market of passengers to London. It closed to passengers in 1951, part of a cutback of minor routes after the war. The whole route closed to goods in 1964, though a short stub at the Hatfield end lasted until 1968. During construction of the Midland main line in the 1860s, a branch was laid from near How Wood to the Midland route to carry building materials. Never used by passenger services, Ordnance Survey maps indicate it closed between 1883 and 1898 although the embankment and some bridge abutments remain very visible.[4][5][6][7] As part of a cost-cutting plan in the 1980s, British Rail examined reopening this, with the aim of diverting the branch to the City station and selling off the valuable Abbey station site.{{citesource|date=October 2015}} The line todayOperationsPassenger services are operated by London Northwestern Railway. Stations on the branch are unstaffed. Some have ticket machines; otherwise tickets must be bought on the train. Passengers starting their journey at Watford Junction, which is staffed, must have a valid ticket prior to boarding the train, in compliance with National Rail conditions of carriage. The Abbey line is part of the Network Rail Strategic Route 18, SRS 18.10 and is classified as a Rural line.[8] InfrastructureThe line is single track and is electrified at 25 kV AC using overhead line equipment. It has a loading gauge of W6 and a maximum line speed of {{convert|50|mph|kph|abbr=on}}.[8][9] Rolling stockThe service is operated using electric multiple units. London Northwestern Railway runs services with a single Class 319 train, which was acquired in September 2016 by London Midland as part of a set of trains from Thameslink to replace Class 321 units. The Class 321s were in turn were acquired by Abellio ScotRail to operate on Glasgow's suburban rail network.[10] In addition to Class 321 trains, services on the Abbey Line had previously been operated using Class 313 units. Rarely (and more commonly in the past) a Class 150 diesel multiple unit has been substituted.
SignallingSignalling is under One Train Working[11] (without Train staff) rules, where only one train is allowed on the line at a time. Trains can be moved into Watford Junction yard by a manual ground frame there. On 28 October 2005 its incorrect operation caused an incident with a train not in passenger service.[12] There is an automatic level crossing outside Watford North. This is operated by a manual plunger for trains heading towards St Albans, and by a treadle towards Watford Junction. The futureSince 1995 the Abbey Flyer Users Group (ABFLY)[13] has been campaigning to secure the future of the line and encourage its growth. The Abbey line was designated by the Strategic Rail Authority as a community rail line in July 2005, one of seven pilots under the Community Rail Development Strategy.[14] Past proposalsIn 2004 a proposal was made by Transport for London for a London Regional Rail Authority to take control over some rail services that extended out of Greater London, including the branch line.[15] In October 2009 Secretary of State for Transport Lord Adonis announced a plan to increase frequency on the line by allowing Hertfordshire County Council to lease the line from Network Rail and converting it to light rail from 2011. It was hoped that this would be possible for the same amount of subsidy the line received, as the new infrastructure required, such as a passing loop would be cheaper for light rail than heavy rail.[2][16] Longer-term proposals envisaged extensions into Watford town centre via Clarendon Road and High Street, and St Albans city centre,[17] possibly as far as St Albans City railway station, and possible re-instatement of the line to Hatfield.[18] The light rail plan was cancelled in May 2013, as it was found to be impossible to deliver the scheme within the existing heavy rail subsidy as planned and more complicated than had been expected with disputes over apportionment of ticket revenue and who was responsible for the cost of maintaining structures.[19] Hertfordshire County Council pledged to prepare a more ambitious bid to the DfT for funding for full segregation from the national rail network and extensions on either end rather than to lease the line from Network Rail. In a Draft Rail Strategy consultation published in June 2015,[20] Hertfordshire County Council highlighted the difficulties presented by single-track operation on the Abbey line, in particular the fact that the maximum service frequency that can be operated is one train per 45 minutes. The report notes that the service pattern makes it difficult to enable interchange connections with other rail services and to offer a "clockface" timetable that is memorable to passengers. Among the solutions evaluated by Hertfordshire are: a proposal to reopen the passing loop at Bricket Wood; running trains which skip certain stations; closing some stations; conversion of the line to light rail operation; and conversion of the line to a guided busway. The passing loop solution would enable a 30-minute service, but the report notes that there would be an additional cost of running the line with two train sets (rather than a single train, as at present), and that it would be "difficult to achieve a favourable business case". The report states that a light rail or busway solution would be quicker to implement and offer higher service frequencies, while still providing sufficient capacity, and concludes that these alternative modes would offer a stronger "business case" than heavy rail. The ABFLY campaign group has criticised the busway proposal, citing environmental concerns about replacing an electric train service with a diesel bus service and rejecting plans to replace the tracks with a concrete busway.[21] Other proposals considered included adding the Abbey line as a branch of the proposed extension of Crossrail to {{rws|Milton Keynes Central}}; this proposal was rejected due to the technical challenges associated with upgrading the Abbey line to accommodate Crossrail trains.[22] West Midlands Trains franchiseUpon winning the West Midlands franchise in 2017, the future operator West Midlands Trains confirmed that new trains would be bought for the Abbey line.[23] See also
References1. ^{{Cite web|url=http://www.abbeyline.org.uk/routeguide.htm |title=Abbey Line – Community Rail Partnership – Route Guide |date= |publisher=Community Rail Partnership |accessdate=9 May 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20090301002607/http://www.abbeyline.org.uk/routeguide.htm |archivedate=1 March 2009 }} 2. ^1 {{Cite news | last = Lewis | first = Alex | title = Tram service promised for St Albans to Watford Abbey Flyer rail link | newspaper = Watford Observer | location = Watford | publisher = Newsquest | date = 30 October 2009 | url = http://www.watfordobserver.co.uk/news/4710584.Abbey_Flyer_to_become_a_tram/ | accessdate = 6 March 2010 | quote = Provided the project gets through a 12-week consultation, ownership of the line will transfer from Network Rail to Hertfordshire County Council, which will tender for a contractor to run the service. Watford MP Claire Ward said...'The Abbey Flyer is going to be put on a firmer footing, and there will be better services'.}} 3. ^{{citation|url=http://www.abbeyline.org.uk/routehistory.htm |title=Route History |publisher=Community Rail Partnership |accessdate=9 May 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20090302010842/http://www.abbeyline.org.uk/routehistory.htm |archivedate=2 March 2009 }} 4. ^{{cite web|title=Ordnance Survey maps, various dates|url=https://www.old-maps.co.uk/#/Map/515328/203944|website=oldmaps.co.uk|accessdate=15 November 2014}} 5. ^{{cite web|title=St Albans London Road|url=http://www.disused-stations.org.uk/s/st_albans_london_road/|website=Disused Stations|accessdate=14 November 2014}} 6. ^{{cite web|title=Conservation Area Statement |url=http://www.stalbans.gov.uk/Images/Park%20Street%20%20Frogmore%20Character%20Statement.pdf |publisher=Hertfordshire County Council |accessdate=14 November 2014 |deadurl=yes |archiveurl=https://web.archive.org/web/20141129013520/http://www.stalbans.gov.uk/Images/Park%20Street%20%20Frogmore%20Character%20Statement.pdf |archivedate=29 November 2014 |df=dmy }} 7. ^{{cite web|title=Streetview pictures & aerial footage|url=https://maps.google.com/maps?ll=51.7175,-0.3448&q=51.7175,-0.3448&hl=en&t=m&z=15|website=Google Earth|publisher=Google|accessdate=15 November 2014}} 8. ^1 {{Cite web|url=http://www.networkrail.co.uk/browse%20documents/StrategicBusinessPlan/RoutePlans/2009/Route%2018%20-%20West%20Coast%20Main%20Line.pdf|title=Route 18 – West Coast Main Line|publisher=Network Rail|year=2009|accessdate=1 June 2009}} 9. ^http://archive.nr.co.uk/browse%20documents/sectional%20appendix/sectional%20appendix%20full%20pdf%20copies/london%20north%20western%20south%20sectional%20appendix.pdfPage 133 10. ^{{cite web|title=New Trains! Well sort of....|url=http://www.abfly.org.uk/2015/10/new-trains-well-sort-of/|website=Abbey Flyer Users' Group|accessdate=15 September 2017|archiveurl=https://web.archive.org/web/20170915101942/http://www.abfly.org.uk/2015/10/new-trains-well-sort-of/|archivedate=15 September 2017|deadurl=no}} 11. ^{{cite book |author=RSSB |authorlink=Rail Safety and Standards Board |title= Rule Book: Train Driver Manual |volume=Section TS8 "One-train working: The principle of one-train working is to prevent more than one train being in the section at the same time" |date=26 July 2017 |id=GERT8000 |page=para 2.1}} 12. ^{{citation |url=http://www.raib.gov.uk/latest_news/news_archive/news_archive_2006/060328_pn_watfordjunctionyard.cfm |title=Report released on the derailment at Watford Junction Yard |date=28 October 2005 |publication-date=28 March 2006 |publisher=Rail Accident Investigation Branch |accessdate=9 May 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20110720085837/http://www.raib.gov.uk/latest_news/news_archive/news_archive_2006/060328_pn_watfordjunctionyard.cfm |archivedate=20 July 2011 |df=dmy}} 13. ^{{citation|url=http://www.abfly.org.uk/|title=Abbey Flyer Users Group|date=13 November 2007|accessdate=9 May 2009| archiveurl= https://web.archive.org/web/20090515120838/http://www.abfly.org.uk/| archivedate= 15 May 2009 | deadurl= no}} 14. ^{{citation |url=http://www.networkrail.co.uk/aspx/983.aspx |title=Community Rail |publisher=Network Rail|date= |accessdate=9 May 2009 | archiveurl= https://web.archive.org/web/20090503092029/http://www.networkrail.co.uk/aspx/983.aspx| archivedate= 3 May 2009 | deadurl= no}} 15. ^{{Cite web | url=http://www.alwaystouchout.com/project/66/ | title = London Rail Authority | publisher = alwaystouchout.com | accessdate = 6 March 2010 | date = 7 September 2006 | archiveurl = https://web.archive.org/web/20070926225154/http://www.alwaystouchout.com/project/66/ | archivedate = 26 September 2007 | quote = Because the London commuter rail network does not stop at the GLA boundary, we will look at whether it is feasible to give Transport for London the right to specify and pay for services in an area slightly bigger than Greater London that makes more sense in rail transport terms.}} 16. ^{{Cite press release | title=Watford and St Albans passengers on track for new tram service|url=http://www.wired-gov.net/wg/wg-news-1.nsf/0/873BDD6390AB8CF88025765F00354AF0?OpenDocument| date = 30 October 2009|publisher=Department for Transport}} 17. ^{{Cite web|url=http://www.hertsdirect.org/docs/pdf/r/LTP3rail.pdf|title=Rail Strategy|year=2011|publisher=Herts County Council|accessdate=15 September 2011|archive-url=https://web.archive.org/web/20120402044403/http://www.hertsdirect.org/docs/pdf/r/LTP3rail.pdf|archive-date=2 April 2012|dead-url=yes|df=dmy-all}} 18. ^{{Cite web|url=http://www.railwaygazette.com/news/single-view/view/10/st-albans-abbey-tram-train-announced.html|title=St Albans Abbey tram-train announced|date= 30 October 2009 |publisher=Railway Gazette International|accessdate=24 December 2009| archiveurl= https://web.archive.org/web/20100104115436/http://www.railwaygazette.com/news/single-view/view/10/st-albans-abbey-tram-train-announced.html| archivedate= 4 January 2010 | deadurl= no}} 19. ^{{cite news |url=http://www.railwaygazette.com/news/urban-rail/single-view/view/st-albans-light-rail-conversion-plan-dropped.html |title=St Albans light rail conversion plan dropped |date=29 May 2013|publisher=Railway Gazette International}} 20. ^{{cite web|title=Hertfordshire Rail Strategy Draft Rail Strategy consultation|publisher=Hertfordshire County Council/Arup|accessdate=12 July 2015|url=http://www.hertsdirect.org/docs/doc/r/railstratdraftdoc|pages=65–67|date=10 June 2015|archiveurl=https://web.archive.org/web/20150712124907/http://www.hertsdirect.org/docs/doc/r/railstratdraftdoc|archivedate=12 July 2015|deadurl=yes}} 21. ^1 {{cite news|last1=Ikonen|first1=Charlotte|title=Direct rail link between Watford and St Albans could be ripped up and converted into busway|url=http://www.watfordobserver.co.uk/news/13363964.Direct_rail_link_between_Watford_and_St_Albans_could_be_ripped_up_and_converted_into_busway|accessdate=12 July 2015|work=Watford Observer|archiveurl=https://web.archive.org/web/20150713194243/http://www.watfordobserver.co.uk/news/13363964.Direct_rail_link_between_Watford_and_St_Albans_could_be_ripped_up_and_converted_into_busway/|archivedate=13 July 2015 |deadurl=no}} 22. ^Hertfordshire Rail Strategy Draft Rail Strategy consultation, p.30 23. ^East Japan Railway enters UK market with West Midlands franchise win Railway Gazette International 10 August 2017 External links{{Commons category|Abbey Line}}
7 : Rail transport in Hertfordshire|Community railway lines in England|Transport in St Albans|Transport in Watford|Railway lines in the East of England|Abandoned light rail projects in the United Kingdom|Railway branch lines |
|||||||||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。